{"version":1,"startedOn":"2026-07-04","updatedAt":"2026-10-30T03:33:25.607Z","entries":[
{"id":"10th-road-from-rk-mission-to-gurugangeshwar-road-h-w-2024-10-01","sourceKey":"10th-road-from-rk-mission-to-gurugangeshwar-road-h-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"10th Road from RK Mission to Gurugangeshwar Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-21","lengthM":677,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"10th-road-h-w-2023-11-01","sourceKey":"10th-road-h-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"10th Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-30","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"11-th-khetwadi-lane-d-2025-10-10","sourceKey":"11-th-khetwadi-lane-d-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"11 th Khetwadi Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-10","endDate":"2026-03-31","lengthM":105,"pqcPercentProgress":62.86,"pqcCompletedOn":null},"changes":[]},
{"id":"11th-road-khar-west-including-madhu-park-circle-h-w-2023-04-27","sourceKey":"11th-road-khar-west-including-madhu-park-circle-h-w-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"11th Road, Khar West including Madhu Park Circle","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2026-05-15","lengthM":1010,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"12th-road-h-w-x","sourceKey":"12th-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"12th Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":840,"pqcPercentProgress":95.83,"pqcCompletedOn":null},"changes":[]},
{"id":"13-40-d-p-road-k-d-compound-kandivali-w-r-s-2025-10-01","sourceKey":"13-40-d-p-road-k-d-compound-kandivali-w-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"13.40 D.P road, K.D. Compound, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"13-40-d-p-road-kandivali-w-r-s-2024-10-01","sourceKey":"13-40-d-p-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"13.40 D.P Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"13-40-d-p-road-vishnu-shivam-mall-thakur-village-r-s-2025-10-01","sourceKey":"13-40-d-p-road-vishnu-shivam-mall-thakur-village-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"13.40 D.P Road (Vishnu Shivam Mall),Thakur Village","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":312,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"13-40-wide-dp-road-sai-nagar-kandivali-w-r-s-2023-10-25","sourceKey":"13-40-wide-dp-road-sai-nagar-kandivali-w-r-s-2023-10-25","firstSeen":"2026-07-04","state":{"roadName":"13.40 wide DP Road, Sai Nagar, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-25","endDate":"2024-05-31","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"13-40m-wide-d-p-road-in-pap-tenements-layout-mulund-east-t-2026-04-08","sourceKey":"13-40m-wide-d-p-road-in-pap-tenements-layout-mulund-east-t-2026-04-08","firstSeen":"2026-07-04","state":{"roadName":"13.40m wide D.P road in PAP tenements layout ,Mulund(east)","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"In Progress","startDate":"2026-04-08","endDate":"2027-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"13-th-khetwadi-lane-d-2025-10-01","sourceKey":"13-th-khetwadi-lane-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"13 th Khetwadi Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":110,"pqcPercentProgress":82.73,"pqcCompletedOn":null},"changes":[]},
{"id":"13th-kamathipura-road-e-2026-05-06","sourceKey":"13th-kamathipura-road-e-2026-05-06","firstSeen":"2026-07-04","state":{"roadName":"13th Kamathipura road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-05-06","endDate":"2026-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"13th-road-h-w-x","sourceKey":"13th-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"13th Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":203,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"14-th-khetwadi-lane-d-2024-10-01","sourceKey":"14-th-khetwadi-lane-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"14 th Khetwadi Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-10-01","endDate":"2025-12-15","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"14th-b-road-h-w-2025-11-01","sourceKey":"14th-b-road-h-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"14th-B  Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-01","endDate":"2026-04-05","lengthM":115,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"14th-road-bandra-w-h-w-x","sourceKey":"14th-road-bandra-w-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"14th Road Bandra W","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"14th-road-khar-h-w-2023-12-01","sourceKey":"14th-road-khar-h-w-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"14th Road Khar","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2026-02-07","lengthM":690,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"14th-road-khar-w-h-w-2024-10-17","sourceKey":"14th-road-khar-w-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"14th Road (Khar W)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2026-03-10","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"15-road-khar-west-i-h-w-2025-12-10","sourceKey":"15-road-khar-west-i-h-w-2025-12-10","firstSeen":"2026-07-04","state":{"roadName":"15 Road (Khar West)-I","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2025-12-10","endDate":"2027-01-31","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"15th-road-h-w-x","sourceKey":"15th-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"15th road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"15th-road-khar-west-h-w-2025-10-05","sourceKey":"15th-road-khar-west-h-w-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"15th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2025-10-05","endDate":"2027-04-29","lengthM":500,"pqcPercentProgress":55,"pqcCompletedOn":null},"changes":[]},
{"id":"15th-road-santacruz-west-h-w-2024-12-15","sourceKey":"15th-road-santacruz-west-h-w-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"15th Road, Santacruz West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-15","endDate":"2025-06-09","lengthM":133,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"161-layout-road-k-w-2024-10-01","sourceKey":"161-layout-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"161 Layout Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":367,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"16th-road-khar-h-w-2026-01-20","sourceKey":"16th-road-khar-h-w-2026-01-20","firstSeen":"2026-07-04","state":{"roadName":"16th Road, Khar","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2026-01-20","endDate":"2026-05-31","lengthM":775,"pqcPercentProgress":63.23,"pqcCompletedOn":null},"changes":[]},
{"id":"16th-road-khar-west-h-w-x","sourceKey":"16th-road-khar-west-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"16th Road Khar West","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":1010,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"17th-road-khar-west-h-w-2024-12-05","sourceKey":"17th-road-khar-west-h-w-2024-12-05","firstSeen":"2026-07-04","state":{"roadName":"17th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-05","endDate":"2026-05-05","lengthM":630,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"17th-road-santacruz-h-w-2023-11-01","sourceKey":"17th-road-santacruz-h-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"17th Road (Santacruz)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-01","endDate":"2026-03-15","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"18-30-m-d-p-road-from-vijay-fire-road-to-nahar-d-p-road-no-1-l-2025-10-01","sourceKey":"18-30-m-d-p-road-from-vijay-fire-road-to-nahar-d-p-road-no-1-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"18.30 M D.P.Road from Vijay fire road to nahar D.P. Road no.1","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-22","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"18-30-m-dp-road-parallel-to-eeh-way-f-n-x","sourceKey":"18-30-m-dp-road-parallel-to-eeh-way-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"18.30 m DP road parallel to EEH way","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"18-30-mtr-dp-road-goregaon-east-p-s-2025-10-01","sourceKey":"18-30-mtr-dp-road-goregaon-east-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"18.30 mtr DP Road, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":570,"pqcPercentProgress":82.46,"pqcCompletedOn":null},"changes":[]},
{"id":"18-30-wide-d-p-road-from-mahavir-nagar-signal-jn-to-vasant-complex-nala-culvert-r-c-2024-10-01","sourceKey":"18-30-wide-d-p-road-from-mahavir-nagar-signal-jn-to-vasant-complex-nala-culvert-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"18.30 wide D.P. Road from Mahavir Nagar Signal Jn. to Vasant complex Nala culvert","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"18-30m-dp-road-from-lagoon-road-to-abdul-hamid-road-malad-w-p-n-2024-02-10","sourceKey":"18-30m-dp-road-from-lagoon-road-to-abdul-hamid-road-malad-w-p-n-2024-02-10","firstSeen":"2026-07-04","state":{"roadName":"18.30M DP road from Lagoon Road to Abdul Hamid Road Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-10","endDate":"2025-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"18-30m-eaksar-village-road-r-n-2024-10-01","sourceKey":"18-30m-eaksar-village-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"18.30m Eaksar Village Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"18th-road-khar-west-h-w-2025-03-01","sourceKey":"18th-road-khar-west-h-w-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"18th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-03-01","endDate":"2027-05-31","lengthM":710,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"19th-cross-road-h-w-2024-11-01","sourceKey":"19th-cross-road-h-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"19th Cross Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-31","lengthM":128,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"19th-road-h-w-2024-12-09","sourceKey":"19th-road-h-w-2024-12-09","firstSeen":"2026-07-04","state":{"roadName":"19th Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-09","endDate":"2025-06-09","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"1st-carpanter-road-e-x","sourceKey":"1st-carpanter-road-e-x","firstSeen":"2026-07-04","state":{"roadName":"1st Carpanter road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-02-15","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"1st-koli-lane-a-2024-11-29","sourceKey":"1st-koli-lane-a-2024-11-29","firstSeen":"2026-07-04","state":{"roadName":"1st Koli Lane","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-29","endDate":"2025-03-31","lengthM":34,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"1st-pasta-lane-a-2024-12-01","sourceKey":"1st-pasta-lane-a-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"1st Pasta Lane","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-01","endDate":"2025-03-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"1st-peerkhan-road-e-2024-11-16","sourceKey":"1st-peerkhan-road-e-2024-11-16","firstSeen":"2026-07-04","state":{"roadName":"1st Peerkhan Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-16","endDate":"2025-12-30","lengthM":105,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"1st-road-bandra-west-h-w-2024-10-01","sourceKey":"1st-road-bandra-west-h-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"1st Road, Bandra West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-30","lengthM":348,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"1st-road-ips-h-w-2026-01-21","sourceKey":"1st-road-ips-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"1st Road (IPS)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2026-01-21","endDate":"2026-05-31","lengthM":388,"pqcPercentProgress":46.39,"pqcCompletedOn":null},"changes":[]},
{"id":"1st-road-tps-vi-h-w-2025-10-03","sourceKey":"1st-road-tps-vi-h-w-2025-10-03","firstSeen":"2026-07-04","state":{"roadName":"1st Road, TPS VI","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-03","endDate":"2026-11-30","lengthM":295,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"20th-cross-road-h-w-2025-02-25","sourceKey":"20th-cross-road-h-w-2025-02-25","firstSeen":"2026-07-04","state":{"roadName":"20th Cross Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-02-25","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"20th-road-h-w-2025-03-01","sourceKey":"20th-road-h-w-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"20th Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-03-01","endDate":"2025-05-31","lengthM":376,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"21st-road-khar-west-pd-hinduja-to-33rd-rd-h-w-2025-11-01","sourceKey":"21st-road-khar-west-pd-hinduja-to-33rd-rd-h-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"21st Road, Khar West (PD Hinduja to 33rd Rd)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":306,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"21st-road-santacruz-w-maru-aai-mandir-to-cd-rd-h-w-2025-03-01","sourceKey":"21st-road-santacruz-w-maru-aai-mandir-to-cd-rd-h-w-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"21st Road, Santacruz (W) (Maru Aai Mandir to CD Rd)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-03-01","endDate":"2025-05-31","lengthM":108,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"21st-road-santacruz-west-from-maru-aai-mandir-to-chitrakar-dhurandhar-road-h-w-x","sourceKey":"21st-road-santacruz-west-from-maru-aai-mandir-to-chitrakar-dhurandhar-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"21st Road Santacruz West from Maru Aai Mandir to Chitrakar Dhurandhar Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-12-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"23th-road-h-w-2026-02-06","sourceKey":"23th-road-h-w-2026-02-06","firstSeen":"2026-07-04","state":{"roadName":"23th Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-02-06","endDate":"2026-12-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"24th-road-st-theresa-road-h-w-x","sourceKey":"24th-road-st-theresa-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"24th Road (St Theresa Road)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":850,"pqcPercentProgress":90,"pqcCompletedOn":null},"changes":[]},
{"id":"25th-road-h-w-2026-02-08","sourceKey":"25th-road-h-w-2026-02-08","firstSeen":"2026-07-04","state":{"roadName":"25th Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-08","endDate":"2026-12-31","lengthM":157,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"26th-road-khar-west-h-w-2024-11-07","sourceKey":"26th-road-khar-west-h-w-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"26th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-07","endDate":"2025-04-15","lengthM":151,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"27th-road-h-w-2026-01-21","sourceKey":"27th-road-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"27th Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-21","endDate":"2026-05-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"28th-road-h-w-2026-01-20","sourceKey":"28th-road-h-w-2026-01-20","firstSeen":"2026-07-04","state":{"roadName":"28th Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2026-01-20","endDate":"2026-05-31","lengthM":780,"pqcPercentProgress":26.92,"pqcCompletedOn":null},"changes":[]},
{"id":"2nd-duncan-cross-lane-c-x","sourceKey":"2nd-duncan-cross-lane-c-x","firstSeen":"2026-07-04","state":{"roadName":"2nd Duncan Cross Lane","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":116.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"2nd-fanaswadi-road-c-2026-10-01","sourceKey":"2nd-fanaswadi-road-c-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"2nd Fanaswadi Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-10-01","endDate":"2027-03-31","lengthM":140,"pqcPercentProgress":21.43,"pqcCompletedOn":null},"changes":[]},
{"id":"2nd-gaothan-lane-h-w-2026-10-01","sourceKey":"2nd-gaothan-lane-h-w-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"2nd Gaothan Lane","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-10-01","endDate":"2027-03-06","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"2nd-hasnabad-road-h-w-2024-03-01","sourceKey":"2nd-hasnabad-road-h-w-2024-03-01","firstSeen":"2026-07-04","state":{"roadName":"2nd Hasnabad Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-03-01","endDate":"2026-05-31","lengthM":780,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"2nd-road-tps-vi-h-w-2024-10-01","sourceKey":"2nd-road-tps-vi-h-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"2nd Road TPS VI","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":201,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"30-ft-mandala-road-m-e-2024-11-22","sourceKey":"30-ft-mandala-road-m-e-2024-11-22","firstSeen":"2026-07-04","state":{"roadName":"30 Ft Mandala Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-11-22","endDate":"2027-05-31","lengthM":500,"pqcPercentProgress":34,"pqcCompletedOn":null},"changes":[]},
{"id":"300-tenaments-road-m-e-2025-01-14","sourceKey":"300-tenaments-road-m-e-2025-01-14","firstSeen":"2026-07-04","state":{"roadName":"300 Tenaments Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-14","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"30th-road-extension-h-w-2024-11-07","sourceKey":"30th-road-extension-h-w-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"30th Road Extension","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-07","endDate":"2026-05-16","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"30th-road-h-w-x","sourceKey":"30th-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"30th Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":680,"pqcPercentProgress":79.41,"pqcCompletedOn":null},"changes":[]},
{"id":"31st-road-h-w-2024-12-26","sourceKey":"31st-road-h-w-2024-12-26","firstSeen":"2026-07-04","state":{"roadName":"31st Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-26","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"32nd-road-khar-west-h-w-2026-01-21","sourceKey":"32nd-road-khar-west-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"32nd Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-21","endDate":"2027-03-15","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"33rd-road-khar-west-h-w-2026-04-17","sourceKey":"33rd-road-khar-west-h-w-2026-04-17","firstSeen":"2026-07-04","state":{"roadName":"33rd Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2026-04-17","endDate":"2027-05-05","lengthM":325,"pqcPercentProgress":27.69,"pqcCompletedOn":null},"changes":[]},
{"id":"34th-road-khar-west-h-w-2024-11-07","sourceKey":"34th-road-khar-west-h-w-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"34th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-07","endDate":"2025-05-15","lengthM":118,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"36th-road-khar-west-h-w-2026-10-15","sourceKey":"36th-road-khar-west-h-w-2026-10-15","firstSeen":"2026-07-04","state":{"roadName":"36th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2026-10-15","endDate":"2027-05-10","lengthM":225,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"37th-road-p-g-kher-marg-khar-west-h-w-2025-03-05","sourceKey":"37th-road-p-g-kher-marg-khar-west-h-w-2025-03-05","firstSeen":"2026-07-04","state":{"roadName":"37th Road (P.G. Kher Marg), Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-03-05","endDate":"2026-03-31","lengthM":146,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"3rd-dhobitalao-street-c-2025-12-05","sourceKey":"3rd-dhobitalao-street-c-2025-12-05","firstSeen":"2026-07-04","state":{"roadName":"3rd Dhobitalao Street","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-12-05","endDate":"2026-05-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"3rd-kumbharwada-road-c-2025-11-12","sourceKey":"3rd-kumbharwada-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"3rd Kumbharwada Road","ward":"C","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-14","field":"startDate","from":"2025-11-12","to":null}],"deletions":[{"on":"2026-10-14","before":{"roadName":"3rd Kumbharwada Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-12","endDate":"2026-05-31","lengthM":380,"pqcPercentProgress":52,"pqcCompletedOn":null}}]},
{"id":"3rd-road-almeda-park-h-w-2026-02-01","sourceKey":"3rd-road-almeda-park-h-w-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"3rd Road (Almeda Park)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-02-01","endDate":"2026-12-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"3rd-road-khar-west-3-wise-monkey-hotel-road-h-w-2024-10-16","sourceKey":"3rd-road-khar-west-3-wise-monkey-hotel-road-h-w-2024-10-16","firstSeen":"2026-07-04","state":{"roadName":"3rd Road Khar West (3 Wise Monkey Hotel Road)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-16","endDate":"2025-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"3rd-road-tps-vi-h-w-2024-12-16","sourceKey":"3rd-road-tps-vi-h-w-2024-12-16","firstSeen":"2026-07-04","state":{"roadName":"3rd Road TPS VI","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-16","endDate":"2026-01-01","lengthM":193,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"3rd-road-y-shape-h-w-2023-12-01","sourceKey":"3rd-road-y-shape-h-w-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"3rd road (Y Shape)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2026-01-10","lengthM":560,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"4th-road-bandra-west-h-w-2026-01-20","sourceKey":"4th-road-bandra-west-h-w-2026-01-20","firstSeen":"2026-07-04","state":{"roadName":"4th Road, Bandra West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-20","endDate":"2026-05-31","lengthM":171,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"4th-road-tps-vi-h-w-2024-12-16","sourceKey":"4th-road-tps-vi-h-w-2024-12-16","firstSeen":"2026-07-04","state":{"roadName":"4th Road TPS VI","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-16","endDate":"2025-05-31","lengthM":108,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5-th-kamathipura-lane-e-2026-05-04","sourceKey":"5-th-kamathipura-lane-e-2026-05-04","firstSeen":"2026-07-04","state":{"roadName":"5 th Kamathipura Lane","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-05-04","endDate":"2026-05-31","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5-th-khetwadi-lane-d-2025-11-12","sourceKey":"5-th-khetwadi-lane-d-2025-11-12","firstSeen":"2026-07-04","state":{"roadName":"5 th Khetwadi Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-12","endDate":"2026-02-28","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5th-cross-road-l-t-garden-to-inaya-chs-k-w-2025-11-10","sourceKey":"5th-cross-road-l-t-garden-to-inaya-chs-k-w-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"5th Cross Road (L T Garden to Inaya CHS)","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-11-10","endDate":"2027-04-15","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5th-kumbharwada-road-c-x","sourceKey":"5th-kumbharwada-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"5th Kumbharwada Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":215,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5th-lane-h-w-2025-11-01","sourceKey":"5th-lane-h-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"5th Lane","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":244,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5th-road-khar-h-w-2023-04-27","sourceKey":"5th-road-khar-h-w-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"5th Road (Khar)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2024-02-28","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5th-road-khar-west-h-w-2026-01-21","sourceKey":"5th-road-khar-west-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"5th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-21","endDate":"2027-03-01","lengthM":322,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"5th-road-tps-vi-h-w-2025-03-01","sourceKey":"5th-road-tps-vi-h-w-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"5th Road TPS VI","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-03-01","endDate":"2026-01-31","lengthM":128,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"60-feet-gandhinagar-road-r-s-2025-12-02","sourceKey":"60-feet-gandhinagar-road-r-s-2025-12-02","firstSeen":"2026-07-04","state":{"roadName":"60 feet Gandhinagar Road","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-12-02","endDate":"2027-05-31","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"60-ft-dp-road-k-w-2025-04-27","sourceKey":"60-ft-dp-road-k-w-2025-04-27","firstSeen":"2026-07-04","state":{"roadName":"60 ft DP Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-04-27","endDate":"2026-03-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"60-pmgp-road-m-e-2024-12-01","sourceKey":"60-pmgp-road-m-e-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"60' PMGP Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-01","endDate":"2026-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-08-15","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"6th-road-khar-west-h-w-2024-11-07","sourceKey":"6th-road-khar-west-h-w-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"6th Road, Khar West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-07","endDate":"2025-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"6th-road-tps-vi-h-w-2025-11-15","sourceKey":"6th-road-tps-vi-h-w-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"6th Road TPS VI","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-11-15","endDate":"2027-02-25","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"7th-cross-road-m-w-2023-10-23","sourceKey":"7th-cross-road-m-w-2023-10-23","firstSeen":"2026-07-04","state":{"roadName":"7th Cross Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-23","endDate":"2024-02-28","lengthM":205,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"7th-road-bandra-west-h-w-2024-10-18","sourceKey":"7th-road-bandra-west-h-w-2024-10-18","firstSeen":"2026-07-04","state":{"roadName":"7th Road, Bandra West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-18","endDate":"2025-05-28","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"7th-road-khar-h-w-2026-11-01","sourceKey":"7th-road-khar-h-w-2026-11-01","firstSeen":"2026-07-04","state":{"roadName":"7th road, Khar","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-11-01","endDate":"2026-05-30","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"8th-kamathipura-lane-e-2026-04-23","sourceKey":"8th-kamathipura-lane-e-2026-04-23","firstSeen":"2026-07-04","state":{"roadName":"8th Kamathipura Lane","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-04-23","endDate":"2026-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"8th-road-khar-w-13th-road-to-6th-road-h-w-2025-11-01","sourceKey":"8th-road-khar-w-13th-road-to-6th-road-h-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"8th Road, Khar (W) [13th Road to 6th Road]","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-11-01","endDate":"2026-12-15","lengthM":196,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"8th-road-santacruz-west-sv-rd-to-linking-rd-h-w-x","sourceKey":"8th-road-santacruz-west-sv-rd-to-linking-rd-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"8th Road, Santacruz West (SV Rd to Linking Rd)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2027-02-16","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"9-th-khetwadi-lane-d-2024-12-12","sourceKey":"9-th-khetwadi-lane-d-2024-12-12","firstSeen":"2026-07-04","state":{"roadName":"9 th Khetwadi Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-12","endDate":"2025-12-31","lengthM":132,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"90-d-p-road-shivajinagar-m-e-2025-10-01","sourceKey":"90-d-p-road-shivajinagar-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"90' D P Road Shivajinagar","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-01","endDate":"2027-03-20","lengthM":540,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"90-feet-road-behind-fish-market-and-opposite-fish-market-shivram-park-s-2024-10-01","sourceKey":"90-feet-road-behind-fish-market-and-opposite-fish-market-shivram-park-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"90 feet Road behind Fish Market and opposite fish Market, Shivram Park","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":250,"pqcPercentProgress":94,"pqcCompletedOn":null},"changes":[]},
{"id":"90-feet-road-to-sarvovar-hotel-khadi-no-3-l-2024-03-10","sourceKey":"90-feet-road-to-sarvovar-hotel-khadi-no-3-l-2024-03-10","firstSeen":"2026-07-04","state":{"roadName":"90 feet road to sarvovar hotel khadi no 3","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-03-10","endDate":"2025-05-31","lengthM":215,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"9th-road-linking-road-to-2nd-hasnabad-road-h-w-2025-03-15","sourceKey":"9th-road-linking-road-to-2nd-hasnabad-road-h-w-2025-03-15","firstSeen":"2026-07-04","state":{"roadName":"9th Road (Linking road to 2nd Hasnabad Road)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-03-15","endDate":"2027-02-10","lengthM":530,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a-b-compound-road-no-1-l-2024-12-16","sourceKey":"a-b-compound-road-no-1-l-2024-12-16","firstSeen":"2026-07-04","state":{"roadName":"A. B. compound road No. 1","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-16","endDate":"2025-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a-b-compound-road-no-2-l-2024-11-11","sourceKey":"a-b-compound-road-no-2-l-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"A. B. compound road No. 2","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-11","endDate":"2025-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a-b-nair-road-k-w-2023-10-20","sourceKey":"a-b-nair-road-k-w-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"A.B.Nair Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-05-24","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a-block-to-b-block-road-sandesh-nagar-road-to-mn-road-l-2025-10-10","sourceKey":"a-block-to-b-block-road-sandesh-nagar-road-to-mn-road-l-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"A Block to B Block road( Sandesh nagar road to MN road)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-10","endDate":"2026-05-20","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a-g-pawar-lane-e-x","sourceKey":"a-g-pawar-lane-e-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"A.G.Pawar Lane","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-10","lengthM":490,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-28","field":"startDate","from":null,"to":"2026-10-01"}]},
{"id":"a-h-wadia-road-from-hotel-rolex-to-lbs-marg-l-2025-10-01","sourceKey":"a-h-wadia-road-from-hotel-rolex-to-lbs-marg-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"A.H. Wadia Road (From Hotel Rolex to LBS Marg)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":350,"pqcPercentProgress":48.57,"pqcCompletedOn":null},"changes":[]},
{"id":"a-k-nayak-road-a-2025-10-05","sourceKey":"a-k-nayak-road-a-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"A. K. Nayak Road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-05","endDate":"2026-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a-n-tiwari-road-k-e-x","sourceKey":"a-n-tiwari-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"A N Tiwari Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a-p-road-side-strip-k-w-2023-03-25","sourceKey":"a-p-road-side-strip-k-w-2023-03-25","firstSeen":"2026-07-04","state":{"roadName":"A.P.Road Side Strip","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-03-25","endDate":"2026-05-31","lengthM":1150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"a1-bakery-road-goregaon-west-p-s-2024-10-10","sourceKey":"a1-bakery-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"A1 Bakery Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aacharya-tulsi-marg-goregaon-west-p-s-2024-10-10","sourceKey":"aacharya-tulsi-marg-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Aacharya Tulsi Marg, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aagashe-path-g-n-2024-11-25","sourceKey":"aagashe-path-g-n-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Aagashe Path","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-25","endDate":"2026-04-30","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aaram-society-road-h-e-2023-12-01","sourceKey":"aaram-society-road-h-e-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Aaram Society Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2026-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aasha-nagar-road-side-strip-kandivali-e-r-s-2026-10-01","sourceKey":"aasha-nagar-road-side-strip-kandivali-e-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Aasha nagar Road Side Strip, Kandivali(E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2027-01-30","lengthM":870,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aashirwad-hotel-road-malad-east-p-n-x","sourceKey":"aashirwad-hotel-road-malad-east-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Aashirwad Hotel Road, Malad (East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Deleted","startDate":null,"endDate":null,"lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aatmaram-mhatre-road-r-n-2024-10-01","sourceKey":"aatmaram-mhatre-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Aatmaram Mhatre Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aba-karmarkar-road-goregaon-east-p-s-2023-04-07","sourceKey":"aba-karmarkar-road-goregaon-east-p-s-2023-04-07","firstSeen":"2026-07-04","state":{"roadName":"Aba Karmarkar Road, Goregaon East","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-04-07","endDate":"2024-05-24","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"abbasaheb-shinde-marg-h-e-2023-10-01","sourceKey":"abbasaheb-shinde-marg-h-e-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Abbasaheb Shinde Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2023-10-01","endDate":"2026-05-31","lengthM":580,"pqcPercentProgress":86.21,"pqcCompletedOn":null},"changes":[]},
{"id":"abbasi-marg-e-2025-10-14","sourceKey":"abbasi-marg-e-2025-10-14","firstSeen":"2026-07-04","state":{"roadName":"Abbasi Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-14","endDate":"2025-12-15","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"abdul-hamid-garden-road-malad-e-p-n-2024-10-21","sourceKey":"abdul-hamid-garden-road-malad-e-p-n-2024-10-21","firstSeen":"2026-07-04","state":{"roadName":"Abdul Hamid Garden Road, Malad (E)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-21","endDate":"2026-05-30","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"abdul-hamid-road-to-gaykwad-nalla-mhada-colony-gate-no-8-p-n-2024-02-10","sourceKey":"abdul-hamid-road-to-gaykwad-nalla-mhada-colony-gate-no-8-p-n-2024-02-10","firstSeen":"2026-07-04","state":{"roadName":"Abdul Hamid Road to Gaykwad Nalla. Mhada Colony Gate no 8","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-10","endDate":"2026-05-31","lengthM":530,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"abdul-rehman-street-b-x","sourceKey":"abdul-rehman-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Abdul Rehman Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":725,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"abhechand-gandhi-marg-b-2025-01-31","sourceKey":"abhechand-gandhi-marg-b-2025-01-31","firstSeen":"2026-07-04","state":{"roadName":"Abhechand Gandhi Marg","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-31","endDate":"2026-02-15","lengthM":184,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"abhechand-gandhi-marg-cross-lane-b-2025-01-31","sourceKey":"abhechand-gandhi-marg-cross-lane-b-2025-01-31","firstSeen":"2026-07-04","state":{"roadName":"Abhechand Gandhi Marg Cross Lane","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-31","endDate":"2025-05-31","lengthM":30,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"abhuday-nagar-road-no-1-f-s-2025-11-05","sourceKey":"abhuday-nagar-road-no-1-f-s-2025-11-05","firstSeen":"2026-07-04","state":{"roadName":"Abhuday Nagar Road No.1","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-05","endDate":"2026-05-31","lengthM":250,"pqcPercentProgress":70,"pqcCompletedOn":null},"changes":[]},
{"id":"abhuday-nagar-road-no-3-f-s-2025-11-05","sourceKey":"abhuday-nagar-road-no-3-f-s-2025-11-05","firstSeen":"2026-07-04","state":{"roadName":"Abhuday Nagar Road No.3","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-05","endDate":"2026-05-31","lengthM":449,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"abhuday-nagar-road-no-4-f-s-2026-02-01","sourceKey":"abhuday-nagar-road-no-4-f-s-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Abhuday Nagar Road No.4","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-02-01","endDate":"2027-03-31","lengthM":575,"pqcPercentProgress":21.74,"pqcCompletedOn":null},"changes":[]},
{"id":"accomodation-street-a-2024-12-01","sourceKey":"accomodation-street-a-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Accomodation Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-01","endDate":"2025-04-30","lengthM":131.3,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"achutrao-patwardhan-marg-t-2025-01-01","sourceKey":"achutrao-patwardhan-marg-t-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Achutrao Patwardhan Marg","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-01","endDate":"2026-04-08","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"adarsh-dugdhalay-road-malad-w-p-n-2024-03-14","sourceKey":"adarsh-dugdhalay-road-malad-w-p-n-2024-03-14","firstSeen":"2026-07-04","state":{"roadName":"Adarsh Dugdhalay Road Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2024-03-14","endDate":"2026-12-31","lengthM":1650,"pqcPercentProgress":89.7,"pqcCompletedOn":null},"changes":[]},
{"id":"adarsh-dugdhalya-cross-road-malad-w-p-n-2025-11-01","sourceKey":"adarsh-dugdhalya-cross-road-malad-w-p-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Adarsh Dugdhalya cross Road Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"adarsh-lane-road-h-e-2026-01-05","sourceKey":"adarsh-lane-road-h-e-2026-01-05","firstSeen":"2026-07-04","state":{"roadName":"Adarsh Lane Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-05","endDate":"2026-05-27","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"adarsh-nagar-road-from-balasaheb-devras-marg-to-h-p-petrol-pump-jn-k-w-2023-11-23","sourceKey":"adarsh-nagar-road-from-balasaheb-devras-marg-to-h-p-petrol-pump-jn-k-w-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Adarsh Nagar Road (From Balasaheb Devras Marg to H.P.Petrol Pump jn )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-23","endDate":"2024-05-24","lengthM":445,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"adi-marzban-street-a-2024-12-02","sourceKey":"adi-marzban-street-a-2024-12-02","firstSeen":"2026-07-04","state":{"roadName":"Adi Marzban Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-02","endDate":"2025-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"adukiya-road-kandivali-w-r-s-2024-10-01","sourceKey":"adukiya-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Adukiya Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"agarwadi-village-road-m-e-2024-10-10","sourceKey":"agarwadi-village-road-m-e-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Agarwadi village Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-10-10","endDate":"2027-03-30","lengthM":580,"pqcPercentProgress":79.31,"pqcCompletedOn":null},"changes":[]},
{"id":"agarwal-hospital-road-t-2023-11-02","sourceKey":"agarwal-hospital-road-t-2023-11-02","firstSeen":"2026-07-04","state":{"roadName":"Agarwal Hospital road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-02","endDate":"2024-05-01","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ahimsa-marg-h-w-2026-01-01","sourceKey":"ahimsa-marg-h-w-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Ahimsa Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2026-01-01","endDate":"2027-03-31","lengthM":306,"pqcPercentProgress":31.05,"pqcCompletedOn":null},"changes":[]},
{"id":"ajmal-road-and-ajmal-cross-road-k-e-2025-01-01","sourceKey":"ajmal-road-and-ajmal-cross-road-k-e-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Ajmal Road and Ajmal Cross Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-15","lengthM":198,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ajmera-prestine-road-yogi-nagar-r-c-2024-10-01","sourceKey":"ajmera-prestine-road-yogi-nagar-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ajmera Prestine Road, Yogi Nagar","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-21","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ajmera-regalia-chs-road-yogi-nagar-r-c-2024-12-01","sourceKey":"ajmera-regalia-chs-road-yogi-nagar-r-c-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Ajmera Regalia CHS Road, Yogi Nagar","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-31","lengthM":319,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"akurli-cross-road-lokhandwala-complex-kandivali-e-r-s-2025-10-01","sourceKey":"akurli-cross-road-lokhandwala-complex-kandivali-e-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Akurli Cross Road , Lokhandwala Complex, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":334,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"akurli-cross-road-no-03-kandivali-e-r-s-2023-11-01","sourceKey":"akurli-cross-road-no-03-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Akurli cross road no.03, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"akurli-cross-road-no-1-kandivali-e-r-s-2025-10-01","sourceKey":"akurli-cross-road-no-1-kandivali-e-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Akurli Cross Road no 1, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"akurli-road-apex-hospital-kandivali-e-r-s-2024-10-15","sourceKey":"akurli-road-apex-hospital-kandivali-e-r-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Akurli Road (Apex Hospital), Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-10-15","endDate":"2025-01-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"akurli-road-from-budhvihar-to-lodha-building-r-s-x","sourceKey":"akurli-road-from-budhvihar-to-lodha-building-r-s-2026-04-14","firstSeen":"2026-10-24","state":{"roadName":"Akurli Road (from Budhvihar to Lodha Building)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2026-04-14","endDate":"2026-10-15","lengthM":157,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Not Started","to":"Completed"},{"on":"2026-10-27","field":"startDate","from":null,"to":"2026-04-14"}]},
{"id":"akurli-road-kandivali-e-r-s-2023-11-01","sourceKey":"akurli-road-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Akurli Road, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":800,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"alibhai-premji-marg-d-2026-10-01","sourceKey":"alibhai-premji-marg-d-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Alibhai Premji Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":430,"pqcPercentProgress":19.77,"pqcCompletedOn":null},"changes":[]},
{"id":"almeida-park-marg-bandra-west-h-w-2024-10-01","sourceKey":"almeida-park-marg-bandra-west-h-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Almeida Park Marg, Bandra West","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":417,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"amarnath-singh-roaad-h-w-2024-10-17","sourceKey":"amarnath-singh-roaad-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Amarnath Singh Roaad","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-05-31","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"amarshi-road-p-n-2023-10-18","sourceKey":"amarshi-road-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Amarshi Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2024-02-01","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"amartaru-road-k-e-2023-12-11","sourceKey":"amartaru-road-k-e-2023-12-11","firstSeen":"2026-07-04","state":{"roadName":"Amartaru Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-11","endDate":"2025-05-16","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ambapada-road-from-mahul-village-to-ambapada-village-m-w-2026-04-01","sourceKey":"ambapada-road-from-mahul-village-to-ambapada-village-m-w-2026-04-01","firstSeen":"2026-07-04","state":{"roadName":"Ambapada Road from Mahul Village to Ambapada village","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-04-01","endDate":"2026-12-12","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ambar-lok-rachana-society-road-t-2025-10-01","sourceKey":"ambar-lok-rachana-society-road-t-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ambar Lok Rachana Society Road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ambedkar-circle-ghatkopar-e-n-x","sourceKey":"ambedkar-circle-ghatkopar-e-n-x","firstSeen":"2026-07-04","state":{"roadName":"Ambedkar Circle,Ghatkopar(E)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":null,"lengthM":150,"pqcPercentProgress":73.33,"pqcCompletedOn":null},"changes":[]},
{"id":"ambedkar-nagar-internal-roads-off-sg-barve-marg-kurla-west-l-2023-12-09","sourceKey":"ambedkar-nagar-internal-roads-off-sg-barve-marg-kurla-west-l-2023-12-09","firstSeen":"2026-07-04","state":{"roadName":"Ambedkar Nagar Internal Roads Off SG Barve Marg Kurla West","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-09","endDate":"2025-05-30","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ambika-nagr-road-t-2026-01-01","sourceKey":"ambika-nagr-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Ambika Nagr Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-05","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ambujwadi-phase-ii-part-b-p-n-2024-10-01","sourceKey":"ambujwadi-phase-ii-part-b-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ambujwadi Phase II Part-B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":800,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ambujwadi-road-malad-w-p-n-2024-12-15","sourceKey":"ambujwadi-road-malad-w-p-n-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"Ambujwadi Road Malad W).","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-12-15","endDate":"2026-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"anand-nagar-internal-road-k-e-x","sourceKey":"anand-nagar-internal-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Anand Nagar Internal Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2027-02-21","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"anandji-lane-n-x","sourceKey":"anandji-lane-n-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Anandji Lane","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-12-31","lengthM":200,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-09-29","field":"status","from":"On Hold","to":"In Progress"},{"on":"2026-09-29","field":"startDate","from":null,"to":"2026-01-01"}]},
{"id":"anandrao-surve-marg-b-x","sourceKey":"anandrao-surve-marg-b-x","firstSeen":"2026-07-04","state":{"roadName":"Anandrao Surve Marg","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"andheri-court-lane-k-e-2026-01-01","sourceKey":"andheri-court-lane-k-e-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Andheri Court Lane","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-01","endDate":"2026-12-21","lengthM":183,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"anik-wadala-side-strip-from-l-ward-boundary-to-extern-express-highway-jn-l-2023-10-10","sourceKey":"anik-wadala-side-strip-from-l-ward-boundary-to-extern-express-highway-jn-l-2023-10-10","firstSeen":"2026-07-04","state":{"roadName":"Anik Wadala side strip from 'L'Ward Boundary to Extern express highway Jn","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-10","endDate":"2024-05-23","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"anil-desai-road-borivali-west-r-c-x","sourceKey":"anil-desai-road-borivali-west-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Anil Desai road , Borivali(West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":590,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"anita-nagar-road-kandivali-e-r-s-2023-11-01","sourceKey":"anita-nagar-road-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Anita Nagar Road, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-02-22","lengthM":760,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"annasagar-scrap-market-l-x","sourceKey":"annasagar-scrap-market-l-x","firstSeen":"2026-07-04","state":{"roadName":"Annasagar Scrap Market","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":null,"lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"annasaheb-daundkar-marg-a-x","sourceKey":"annasaheb-daundkar-marg-a-x","firstSeen":"2026-07-04","state":{"roadName":"Annasaheb Daundkar Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"annasaheb-vartak-road-r-c-2024-10-01","sourceKey":"annasaheb-vartak-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Annasaheb Vartak road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":610,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ansal-vihar-road-r-c-x","sourceKey":"ansal-vihar-road-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Ansal Vihar Road","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":1450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"anstey-marg-d-x","sourceKey":"anstey-marg-d-x","firstSeen":"2026-07-04","state":{"roadName":"Anstey Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-04-30","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"anthony-road-h-w-2023-10-01","sourceKey":"anthony-road-h-w-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Anthony Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-02-28","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"apna-bazar-road-k-w-x","sourceKey":"apna-bazar-road-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Apna Bazar Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"appapada-road-p-n-2024-02-15","sourceKey":"appapada-road-p-n-2024-02-15","firstSeen":"2026-07-04","state":{"roadName":"Appapada Road.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-15","endDate":"2024-05-01","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aqsa-masjid-road-k-w-x","sourceKey":"aqsa-masjid-road-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Aqsa Masjid road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":740,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"arjunsingh-hanspal-lane-from-lbs-to-satyajivan-society-l-2023-12-01","sourceKey":"arjunsingh-hanspal-lane-from-lbs-to-satyajivan-society-l-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Arjunsingh Hanspal Lane (From LBS to Satyajivan Society)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-01","endDate":"2025-04-20","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"arvind-hari-raut-marg-g-n-2025-10-05","sourceKey":"arvind-hari-raut-marg-g-n-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Arvind Hari Raut Marg","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-05","endDate":"2026-05-31","lengthM":103,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"arvind-malkhan-road-r-s-2023-10-12","sourceKey":"arvind-malkhan-road-r-s-2023-10-12","firstSeen":"2026-07-04","state":{"roadName":"Arvind malkhan road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-12","endDate":"2024-11-30","lengthM":705,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"asara-colony-road-inluding-cross-road-r-c-2025-02-01","sourceKey":"asara-colony-road-inluding-cross-road-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Asara Colony Road inluding cross road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":321,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ash-lane-a-x","sourceKey":"ash-lane-a-x","firstSeen":"2026-07-04","state":{"roadName":"Ash Lane","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":null,"lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ashirwad-hotel-to-uncles-corner-dahisar-west-r-n-2023-10-16","sourceKey":"ashirwad-hotel-to-uncles-corner-dahisar-west-r-n-2023-10-16","firstSeen":"2026-07-04","state":{"roadName":"Ashirwad Hotel to Uncles Corner, Dahisar (West)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-16","endDate":"2024-12-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ashok-chopra-marg-k-w-2023-11-16","sourceKey":"ashok-chopra-marg-k-w-2023-11-16","firstSeen":"2026-07-04","state":{"roadName":"Ashok Chopra Marg","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-16","endDate":"2025-05-24","lengthM":355,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ashok-nagar-police-chowky-road-t-2025-11-13","sourceKey":"ashok-nagar-police-chowky-road-t-2025-11-13","firstSeen":"2026-07-04","state":{"roadName":"Ashok Nagar Police chowky Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-13","endDate":"2026-03-27","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ashok-nagar-road-1-kandivali-e-r-s-2026-10-01","sourceKey":"ashok-nagar-road-1-kandivali-e-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Ashok nagar Road 1, Kandivali(E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2026-11-20","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ashok-nagar-road-bhandup-east-s-2025-10-01","sourceKey":"ashok-nagar-road-bhandup-east-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ashok Nagar Road, Bhandup East","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ashtavinayak-road-new-mhb-colony-r-c-2024-10-01","sourceKey":"ashtavinayak-road-new-mhb-colony-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ashtavinayak road New MHB Colony","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"asmi-dream-back-side-road-goregaon-w-p-s-2023-11-01","sourceKey":"asmi-dream-back-side-road-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Asmi Dream back side road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-01-25","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"atmaram-merchant-road-c-2025-10-07","sourceKey":"atmaram-merchant-road-c-2025-10-07","firstSeen":"2026-07-04","state":{"roadName":"Atmaram Merchant Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-07","endDate":"2027-01-18","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"atmiya-marg-ashok-nagar-kandivali-e-r-s-2023-10-12","sourceKey":"atmiya-marg-ashok-nagar-kandivali-e-r-s-2023-10-12","firstSeen":"2026-07-04","state":{"roadName":"Atmiya Marg,Ashok Nagar,Kandivali(E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-12","endDate":"2024-11-30","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"august-kranti-marg-d-x","sourceKey":"august-kranti-marg-d-x","firstSeen":"2026-07-04","state":{"roadName":"August Kranti Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-30","lengthM":595,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"August Kranti Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-30","lengthM":595,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"aurbindo-road-dahisar-west-r-n-2023-10-18","sourceKey":"aurbindo-road-dahisar-west-r-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Aurbindo Road , Dahisar West","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-18","endDate":"2024-03-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"aurbindo-road-r-n-2025-10-01","sourceKey":"aurbindo-road-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Aurbindo Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":198,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"auxillium-convent-road-h-w-x","sourceKey":"auxillium-convent-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Auxillium Convent Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":176,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"awabai-kashinath-path-d-2026-10-01","sourceKey":"awabai-kashinath-path-d-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Awabai Kashinath Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":200,"pqcPercentProgress":25,"pqcCompletedOn":null},"changes":[]},
{"id":"axis-bank-lane-k-w-2024-10-01","sourceKey":"axis-bank-lane-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Axis Bank Lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":305,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ayyappa-temple-road-goregaon-w-p-s-2023-03-03","sourceKey":"ayyappa-temple-road-goregaon-w-p-s-2023-03-03","firstSeen":"2026-07-04","state":{"roadName":"Ayyappa Temple Road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-03-03","endDate":"2024-01-25","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"azad-lane-k-w-x","sourceKey":"azad-lane-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Azad lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":313,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"azad-road-kamgar-kalyan-to-k-e-ward-office-k-e-2025-02-05","sourceKey":"azad-road-kamgar-kalyan-to-k-e-ward-office-k-e-2025-02-05","firstSeen":"2026-07-04","state":{"roadName":"Azad Road (Kamgar Kalyan To K/E Ward Office)","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-02-05","endDate":"2026-04-02","lengthM":124.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"azad-road-verma-nagar-road-gundavli-k-e-2026-01-22","sourceKey":"azad-road-verma-nagar-road-gundavli-k-e-2026-01-22","firstSeen":"2026-07-04","state":{"roadName":"Azad Road,Verma Nagar Road Gundavli","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-22","endDate":"2026-11-30","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"b-block-fire-brigade-road-m-e-2025-10-01","sourceKey":"b-block-fire-brigade-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"B‐Block Fire Brigade Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-02-20","lengthM":270,"pqcPercentProgress":77.78,"pqcCompletedOn":null},"changes":[]},
{"id":"b-g-kher-marg-d-x","sourceKey":"b-g-kher-marg-d-x","firstSeen":"2026-07-04","state":{"roadName":"B G Kher Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"B G Kher Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"b-j-patel-road-p-n-2024-10-01","sourceKey":"b-j-patel-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"B J Patel Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":585,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"b-k-c-road-l-x","sourceKey":"b-k-c-road-l-x","firstSeen":"2026-07-04","state":{"roadName":"B.K.C Road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-25","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"baba-maharaj-singh-cross-road-no-5-t-2023-11-29","sourceKey":"baba-maharaj-singh-cross-road-no-5-t-2023-11-29","firstSeen":"2026-07-04","state":{"roadName":"Baba Maharaj singh Cross Road No. 5","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-29","endDate":"2024-05-30","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"babaji-jamsandekar-marg-g-s-2025-11-15","sourceKey":"babaji-jamsandekar-marg-g-s-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Babaji Jamsandekar Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-15","endDate":"2026-05-31","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"babarpada-road-gorai-village-borivali-w-r-c-2024-10-01","sourceKey":"babarpada-road-gorai-village-borivali-w-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Babarpada Road, Gorai Village, Borivali (W)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-15","lengthM":1638,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"babu-genu-road-c-2026-10-01","sourceKey":"babu-genu-road-c-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Babu Genu Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-10-01","endDate":"2027-03-15","lengthM":205,"pqcPercentProgress":17.07,"pqcCompletedOn":null},"changes":[]},
{"id":"babubhai-chinoy-marg-a-2025-10-01","sourceKey":"babubhai-chinoy-marg-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Babubhai Chinoy Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"babula-tank-x-road-b-2024-11-05","sourceKey":"babula-tank-x-road-b-2024-11-05","firstSeen":"2026-07-04","state":{"roadName":"Babula Tank X-Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-05","endDate":"2025-03-31","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"babulnath-1st-x-lane-d-2025-10-01","sourceKey":"babulnath-1st-x-lane-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Babulnath 1st x lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-02-28","lengthM":165,"pqcPercentProgress":59.39,"pqcCompletedOn":null},"changes":[]},
{"id":"babulnath-2nd-x-lane-d-2025-11-14","sourceKey":"babulnath-2nd-x-lane-d-2025-11-14","firstSeen":"2026-07-04","state":{"roadName":"Babulnath 2nd x lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-14","endDate":"2026-05-31","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"babulnath-3rd-x-lane-d-2025-11-11","sourceKey":"babulnath-3rd-x-lane-d-2025-11-11","firstSeen":"2026-07-04","state":{"roadName":"Babulnath 3rd x lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-11","endDate":"2026-05-31","lengthM":130,"pqcPercentProgress":65.38,"pqcCompletedOn":null},"changes":[]},
{"id":"babulnath-road-d-x","sourceKey":"babulnath-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Babulnath Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-04-10","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bachchani-nagar-road-malad-east-p-n-2023-11-05","sourceKey":"bachchani-nagar-road-malad-east-p-n-2023-11-05","firstSeen":"2026-07-04","state":{"roadName":"Bachchani Nagar Road, Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-05","endDate":"2024-05-01","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bai-dinabai-street-d-2026-10-01","sourceKey":"bai-dinabai-street-d-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bai Dinabai Street","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bajaj-road-k-w-2025-10-01","sourceKey":"bajaj-road-k-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bajaj road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":720,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"baji-prabhu-deshpande-marg-k-e-2023-04-20","sourceKey":"baji-prabhu-deshpande-marg-k-e-2023-04-20","firstSeen":"2026-07-04","state":{"roadName":"Baji Prabhu Deshpande Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-20","endDate":"2025-01-01","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bajiprabhu-deshpande-marg-from-ahilyabai-holkar-road-to-shivaji-nagar-road-no-10-m-e-x","sourceKey":"bajiprabhu-deshpande-marg-from-ahilyabai-holkar-road-to-shivaji-nagar-road-no-10-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Bajiprabhu Deshpande Marg (From Ahilyabai Holkar road to Shivaji Nagar road No 10)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2027-03-20","lengthM":770,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bajiprabhu-deshpande-marg-to-ramdev-mourya-marg-road-between-plot-no-45-44-shivaji-nagar-m-e-2024-10-01","sourceKey":"bajiprabhu-deshpande-marg-to-ramdev-mourya-marg-road-between-plot-no-45-44-shivaji-nagar-m-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bajiprabhu Deshpande Marg to Ramdev Mourya Marg Road between plot no 45 & 44, Shivaji Nagar","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bajiprabhu-deshpande-marg-to-ramdev-mourya-marg-road-between-plot-no-46-44-shivaji-nagar-m-e-x","sourceKey":"bajiprabhu-deshpande-marg-to-ramdev-mourya-marg-road-between-plot-no-46-44-shivaji-nagar-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bajiprabhu Deshpande Marg to Ramdev Mourya Marg Road between plot no 46 & 44, Shivaji Nagar","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-10","lengthM":70,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-27","field":"startDate","from":null,"to":"2025-10-01"}]},
{"id":"bajiprabhu-deshpande-road-k-w-2025-10-01","sourceKey":"bajiprabhu-deshpande-road-k-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bajiprabhu Deshpande Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":485,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bakeram-tiwari-marg-t-2025-01-02","sourceKey":"bakeram-tiwari-marg-t-2025-01-02","firstSeen":"2026-07-04","state":{"roadName":"Bakeram Tiwari Marg","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-02","endDate":"2026-04-05","lengthM":176,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bal-rajeshwar-road-t-2024-01-16","sourceKey":"bal-rajeshwar-road-t-2024-01-16","firstSeen":"2026-07-04","state":{"roadName":"Bal Rajeshwar Road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-16","endDate":"2026-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balaji-mandir-marg-balaji-lane-ghatkopar-east-n-2023-05-10","sourceKey":"balaji-mandir-marg-balaji-lane-ghatkopar-east-n-2023-05-10","firstSeen":"2026-07-04","state":{"roadName":"Balaji Mandir Marg (Balaji Lane), Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-05-10","endDate":"2024-03-26","lengthM":116,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balance-portion-of-azad-nagar-road-k-w-2024-10-01","sourceKey":"balance-portion-of-azad-nagar-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Balance Portion of Azad Nagar Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-07","lengthM":319,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balance-portion-of-lallubhai-road-k-w-2024-10-01","sourceKey":"balance-portion-of-lallubhai-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Balance Portion of Lallubhai Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balance-roads-of-161-layout-k-w-2025-05-10","sourceKey":"balance-roads-of-161-layout-k-w-2025-05-10","firstSeen":"2026-07-04","state":{"roadName":"Balance roads of 161 Layout","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-05-10","endDate":"2026-03-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balaram-baboo-khedekar-road-scheme-no-57-road-no-33-a-sewree-wadala-tilak-road-to-mmgs-road-f-n-2025-11-19","sourceKey":"balaram-baboo-khedekar-road-scheme-no-57-road-no-33-a-sewree-wadala-tilak-road-to-mmgs-road-f-n-2025-11-19","firstSeen":"2026-07-04","state":{"roadName":"Balaram Baboo Khedekar Road, Scheme No-57,Road No-33-A, (Sewree- wadala) (Tilak Road to MMGS Road)","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2025-11-19","endDate":"2027-05-31","lengthM":355,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balaram-thakur-marg-t-2024-12-21","sourceKey":"balaram-thakur-marg-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Balaram Thakur Marg","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2025-12-31","lengthM":229,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balkrishna-tawade-marg-and-cross-road-r-n-2025-10-01","sourceKey":"balkrishna-tawade-marg-and-cross-road-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Balkrishna Tawade Marg and Cross road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balnced-portion-of-marwah-road-kids-preschool-to-n-g-complex-l-2023-10-01","sourceKey":"balnced-portion-of-marwah-road-kids-preschool-to-n-g-complex-l-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Balnced portion of Marwah Road (Kids Preschool to N G complex)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-01","endDate":"2024-02-01","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balraj-sahani-k-w-x","sourceKey":"balraj-sahani-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Balraj Sahani","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":153,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balu-changu-patil-marg-1-b-2025-10-01","sourceKey":"balu-changu-patil-marg-1-b-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Balu Changu Patil Marg-1","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balu-changu-patil-marg-2-b-2026-10-01","sourceKey":"balu-changu-patil-marg-2-b-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Balu Changu Patil Marg-2","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":112,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balu-changu-patil-marg-3-b-2025-10-01","sourceKey":"balu-changu-patil-marg-3-b-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Balu Changu Patil Marg-3","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"balu-changu-patil-marg-4-b-2025-01-15","sourceKey":"balu-changu-patil-marg-4-b-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"Balu Changu Patil Marg-4","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-15","endDate":"2025-05-31","lengthM":45,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"banaji-street-a-2025-11-05","sourceKey":"banaji-street-a-2025-11-05","firstSeen":"2026-07-04","state":{"roadName":"Banaji Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-05","endDate":"2026-04-30","lengthM":82,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bandarpakhadi-road-kandivali-w-r-s-2023-11-01","sourceKey":"bandarpakhadi-road-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Bandarpakhadi road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-02-22","lengthM":509,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bandarpakhadi-school-road-r-s-2025-12-02","sourceKey":"bandarpakhadi-school-road-r-s-2025-12-02","firstSeen":"2026-07-04","state":{"roadName":"Bandarpakhadi School Road","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-12-02","endDate":"2027-05-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bandra-reclamation-road-h-w-2026-01-20","sourceKey":"bandra-reclamation-road-h-w-2026-01-20","firstSeen":"2026-07-04","state":{"roadName":"Bandra Reclamation Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-20","endDate":"2026-05-20","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"banganga-tank-lane-bt-22-to-bt-25-d-x","sourceKey":"banganga-tank-lane-bt-22-to-bt-25-d-x","firstSeen":"2026-07-04","state":{"roadName":"Banganga Tank Lane (BT/22 to BT/25)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"banjara-hotel-road-and-cross-road-r-n-2024-10-01","sourceKey":"banjara-hotel-road-and-cross-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Banjara Hotel Road and cross road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":741,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bank-of-maharastra-lane-k-w-2024-10-01","sourceKey":"bank-of-maharastra-lane-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bank of Maharastra Lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":580,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"baptista-road-k-w-2023-11-17","sourceKey":"baptista-road-k-w-2023-11-17","firstSeen":"2026-07-04","state":{"roadName":"Baptista Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-17","endDate":"2024-11-01","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bapu-bagve-road-dahisar-w-maheshwari-chs-to-flyover-bridge-r-n-x","sourceKey":"bapu-bagve-road-dahisar-w-maheshwari-chs-to-flyover-bridge-r-n-2025-03-13","firstSeen":"2026-07-04","state":{"roadName":"Bapu Bagve Road Dahisar (W) - Maheshwari CHS to flyover bridge","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-03-13","endDate":"2025-12-31","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"Not Started","to":"Completed"},{"on":"2026-10-13","field":"startDate","from":null,"to":"2025-03-13"}]},
{"id":"bapu-prabhakar-nachane-road-k-w-2024-10-01","sourceKey":"bapu-prabhakar-nachane-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bapu Prabhakar Nachane Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bapubhai-vashi-road-k-w-2024-10-01","sourceKey":"bapubhai-vashi-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bapubhai Vashi Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":444,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"barjorji-bharucha-marg-a-x","sourceKey":"barjorji-bharucha-marg-a-x","firstSeen":"2026-07-04","state":{"roadName":"Barjorji Bharucha Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-17","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-17","before":{"roadName":"Barjorji Bharucha Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"baroda-street-b-2025-10-20","sourceKey":"baroda-street-b-2025-10-20","firstSeen":"2026-07-04","state":{"roadName":"Baroda Street","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-20","endDate":"2027-03-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"basant-nagar-road-m-w-x","sourceKey":"basant-nagar-road-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Basant Nagar Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"basera-soc-road-m-e-x","sourceKey":"basera-soc-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Basera Soc. Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-20","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-20","field":"startDate","from":null,"to":"2025-10-01"}]},
{"id":"basuwala-colony-road-off-g-g-mahalkari-road-malad-e-p-n-2024-05-01","sourceKey":"basuwala-colony-road-off-g-g-mahalkari-road-malad-e-p-n-2024-05-01","firstSeen":"2026-07-04","state":{"roadName":"Basuwala colony Road off G.G. Mahalkari road , Malad (E)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-05-01","endDate":"2025-05-01","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bd-shinde-marg-t-2026-01-01","sourceKey":"bd-shinde-marg-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"BD Shinde Marg","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-05-15","lengthM":350,"pqcPercentProgress":51.43,"pqcCompletedOn":null},"changes":[]},
{"id":"beasant-road-k-w-2024-10-01","sourceKey":"beasant-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Beasant Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":321,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"behram-baug-road-k-w-2024-01-05","sourceKey":"behram-baug-road-k-w-2024-01-05","firstSeen":"2026-07-04","state":{"roadName":"Behram Baug Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-05","endDate":"2026-05-31","lengthM":640,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-23","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"best-staff-quarter-road-beside-gorai-pumping-station-r-c-2024-10-01","sourceKey":"best-staff-quarter-road-beside-gorai-pumping-station-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Best Staff Quarter Road (Beside Gorai Pumping station)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":71,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhadran-nagar-internal-road-malad-west-p-n-2023-10-12","sourceKey":"bhadran-nagar-internal-road-malad-west-p-n-2023-10-12","firstSeen":"2026-07-04","state":{"roadName":"Bhadran Nagar Internal Road Malad (West)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-12","endDate":"2026-05-31","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhagatsingh-road-k-w-2024-10-01","sourceKey":"bhagatsingh-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhagatsingh Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":365,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhagavantrao-paralkar-marg-f-s-2025-11-20","sourceKey":"bhagavantrao-paralkar-marg-f-s-2025-11-20","firstSeen":"2026-07-04","state":{"roadName":"Bhagavantrao Paralkar Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-20","endDate":"2027-03-31","lengthM":250,"pqcPercentProgress":78,"pqcCompletedOn":null},"changes":[]},
{"id":"bhagoji-waghmare-marg-g-s-2025-11-08","sourceKey":"bhagoji-waghmare-marg-g-s-2025-11-08","firstSeen":"2026-07-04","state":{"roadName":"Bhagoji Waghmare Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-08","endDate":"2026-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhagwan-mahavir-mandir-lane-ghatkopar-east-n-x","sourceKey":"bhagwan-mahavir-mandir-lane-ghatkopar-east-n-x","firstSeen":"2026-07-04","state":{"roadName":"Bhagwan Mahavir Mandir lane,Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhai-bhagat-road-k-w-x","sourceKey":"bhai-bhagat-road-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Bhai Bhagat Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhai-magandas-marg-pangully-d-2024-10-01","sourceKey":"bhai-magandas-marg-pangully-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhai Magandas Marg (Pangully)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhai-tambe-marg-h-e-2025-02-02","sourceKey":"bhai-tambe-marg-h-e-2025-02-02","firstSeen":"2026-07-04","state":{"roadName":"Bhai Tambe Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-02-02","endDate":"2026-01-29","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhakti-bhavan-marg-from-v-n-purav-marg-to-hemu-kalani-marg-towards-r-c-marg-m-w-2023-11-01","sourceKey":"bhakti-bhavan-marg-from-v-n-purav-marg-to-hemu-kalani-marg-towards-r-c-marg-m-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Bhakti Bhavan Marg from V.N. Purav Marg to Hemu Kalani Marg & towards R.C. Marg","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2026-01-10","lengthM":556,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhakti-dhyansadhana-marg-r-n-2024-10-01","sourceKey":"bhakti-dhyansadhana-marg-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhakti-Dhyansadhana Marg","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhandari-street-c-2025-10-01","sourceKey":"bhandari-street-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhandari Street","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-01","endDate":"2026-04-10","lengthM":345,"pqcPercentProgress":65.22,"pqcCompletedOn":null},"changes":[]},
{"id":"bhandup-village-road-bhandup-west-s-2025-10-01","sourceKey":"bhandup-village-road-bhandup-west-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhandup Village road, Bhandup West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":400,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"bhanushali-wadi-l-x","sourceKey":"bhanushali-wadi-l-x","firstSeen":"2026-09-29","state":{"roadName":"Bhanushali wadi","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":null,"lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-23","field":"status","from":"Not Started","to":"In Progress"}]},
{"id":"bhanushankar-yadnik-marg-a-x","sourceKey":"bhanushankar-yadnik-marg-a-x","firstSeen":"2026-07-04","state":{"roadName":"Bhanushankar Yadnik marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2026-05-30","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bharat-nagar-internal-road-h-e-x","sourceKey":"bharat-nagar-internal-road-h-e-x","firstSeen":"2026-07-04","state":{"roadName":"Bharat Nagar Internal Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2026-06-23","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bharat-nagar-road-mankhurd-station-m-e-2024-12-01","sourceKey":"bharat-nagar-road-mankhurd-station-m-e-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Bharat Nagar Road (Mankhurd Station)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-01","endDate":"2026-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhariravnath-mandir-road-scheme-no-57-road-no-33-a-sewree-wadala-david-barretto-road-to-tilak-road-f-n-2025-11-21","sourceKey":"bhariravnath-mandir-road-scheme-no-57-road-no-33-a-sewree-wadala-david-barretto-road-to-tilak-road-f-n-2025-11-21","firstSeen":"2026-07-04","state":{"roadName":"Bhariravnath Mandir Road Scheme No-57,Road No-33-A, (Sewree- wadala) (David Barretto Road to Tilak Road)","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2025-11-21","endDate":"2027-05-31","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhaskar-bhpoi-marg-p-n-2023-10-12","sourceKey":"bhaskar-bhpoi-marg-p-n-2023-10-12","firstSeen":"2026-07-04","state":{"roadName":"Bhaskar Bhpoi Marg","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-12","endDate":"2026-05-31","lengthM":8750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhaskar-lane-c-2025-11-01","sourceKey":"bhaskar-lane-c-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Bhaskar Lane","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-01-31","lengthM":40,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhausaheb-hire-cross-road-mpt-12-1-to-12-4-d-x","sourceKey":"bhausaheb-hire-cross-road-mpt-12-1-to-12-4-d-x","firstSeen":"2026-07-04","state":{"roadName":"Bhausaheb Hire Cross Road (MPT 12/1 to 12/4)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-01","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhavani-lane-ghatkopar-east-n-x","sourceKey":"bhavani-lane-ghatkopar-east-n-x","firstSeen":"2026-07-04","state":{"roadName":"Bhavani lane,Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":118,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhikaji-lad-marg-r-n-2024-10-01","sourceKey":"bhikaji-lad-marg-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhikaji Lad Marg","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":141,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhogadevi-marg-g-s-2024-11-26","sourceKey":"bhogadevi-marg-g-s-2024-11-26","firstSeen":"2026-07-04","state":{"roadName":"Bhogadevi Marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-26","endDate":"2025-12-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhojraj-damji-patel-marg-n-2024-11-12","sourceKey":"bhojraj-damji-patel-marg-n-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"Bhojraj Damji Patel Marg","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-12","endDate":"2026-05-31","lengthM":188,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhoomi-park-road-p-n-2023-02-01","sourceKey":"bhoomi-park-road-p-n-2023-02-01","firstSeen":"2026-07-04","state":{"roadName":"Bhoomi Park Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-02-01","endDate":"2024-01-01","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhoomiya-mata-mandir-marg-h-e-2026-01-01","sourceKey":"bhoomiya-mata-mandir-marg-h-e-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Bhoomiya Mata Mandir Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-29","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhramhan-sabha-hall-road-malad-w-p-n-2024-12-01","sourceKey":"bhramhan-sabha-hall-road-malad-w-p-n-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Bhramhan Sabha Hall Road, Malad (W)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhulabhai-desai-kandivali-w-r-s-2024-10-01","sourceKey":"bhulabhai-desai-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhulabhai Desai , Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bhulabhai-desai-marg-d-x","sourceKey":"bhulabhai-desai-marg-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bhulabhai Desai Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-10","lengthM":1500,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-27","field":"startDate","from":null,"to":"2025-10-01"}]},
{"id":"bhuleshwar-road-c-x","sourceKey":"bhuleshwar-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"Bhuleshwar Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-03-10","lengthM":374,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bibijan-street-m-ali-road-to-dhobi-street-b-x","sourceKey":"bibijan-street-m-ali-road-to-dhobi-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Bibijan Street (M Ali Road to Dhobi Street)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"billibong-school-lane-k-w-2025-10-10","sourceKey":"billibong-school-lane-k-w-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Billibong School Lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-10","endDate":"2026-05-25","lengthM":297,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bima-nagar-road-k-e-2023-11-10","sourceKey":"bima-nagar-road-k-e-2023-11-10","firstSeen":"2026-07-04","state":{"roadName":"Bima Nagar Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-10","endDate":"2024-01-20","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bimbisar-road-no-1-goregaon-east-p-s-2025-10-01","sourceKey":"bimbisar-road-no-1-goregaon-east-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bimbisar Road No.1, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-31","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bimbisar-road-no-2-goregaon-east-p-s-2025-01-01","sourceKey":"bimbisar-road-no-2-goregaon-east-p-s-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Bimbisar Road No.2, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":52,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bmc-colony-road-dindoshi-malad-east-p-n-2024-04-28","sourceKey":"bmc-colony-road-dindoshi-malad-east-p-n-2024-04-28","firstSeen":"2026-07-04","state":{"roadName":"BMC Colony Road, Dindoshi, Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-04-28","endDate":"2026-05-31","lengthM":630,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bmc-colony-road-malvani-malad-w-p-n-2023-10-18","sourceKey":"bmc-colony-road-malvani-malad-w-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"BMC Colony Road, Malvani, Malad ( W )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2025-01-01","lengthM":690,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bomanji-master-street-c-2024-12-06","sourceKey":"bomanji-master-street-c-2024-12-06","firstSeen":"2026-07-04","state":{"roadName":"Bomanji Master Street","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-06","endDate":"2025-03-27","lengthM":122,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"bombay-hospital-lane-a-2024-10-01","sourceKey":"bombay-hospital-lane-a-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bombay Hospital Lane","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":205.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bora-bazar-street-a-2024-10-01","sourceKey":"bora-bazar-street-a-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bora Bazar Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"borbhat-lane-d-2025-11-17","sourceKey":"borbhat-lane-d-2025-11-17","firstSeen":"2026-07-04","state":{"roadName":"Borbhat Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-17","endDate":"2026-05-31","lengthM":160,"pqcPercentProgress":93.75,"pqcCompletedOn":null},"changes":[]},
{"id":"bp-cross-road-no-3-t-2025-11-13","sourceKey":"bp-cross-road-no-3-t-2025-11-13","firstSeen":"2026-07-04","state":{"roadName":"BP Cross Road No. 3","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-13","endDate":"2026-03-30","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bp-cross-road-no-4-t-2026-01-01","sourceKey":"bp-cross-road-no-4-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"BP Cross Road No. 4","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-14","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"brahmadev-khot-marg-e-x","sourceKey":"brahmadev-khot-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Brahmadev Khot Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":76.9,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"brahmakumari-marg-a-2024-11-30","sourceKey":"brahmakumari-marg-a-2024-11-30","firstSeen":"2026-07-04","state":{"roadName":"Brahmakumari Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-11-30","endDate":"2025-04-30","lengthM":104,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bread-market-lane-a-2025-10-01","sourceKey":"bread-market-lane-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Bread Market lane","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":56,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"building-no-26-to-77-sainath-mandir-road-m-w-2026-01-28","sourceKey":"building-no-26-to-77-sainath-mandir-road-m-w-2026-01-28","firstSeen":"2026-07-04","state":{"roadName":"Building No 26 to  77 ,Sainath Mandir Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-01-28","endDate":"2026-12-31","lengthM":335,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"building-no-40-to-ndr-19-ganesh-garden-road-m-w-2026-02-25","sourceKey":"building-no-40-to-ndr-19-ganesh-garden-road-m-w-2026-02-25","firstSeen":"2026-07-04","state":{"roadName":"Building No 40 to NDR 19 ,Ganesh Garden Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-02-25","endDate":"2026-12-31","lengthM":255,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"building-no-43-to-46-station-road-m-w-2026-01-19","sourceKey":"building-no-43-to-46-station-road-m-w-2026-01-19","firstSeen":"2026-07-04","state":{"roadName":"Building No 43 to  46, Station Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-01-19","endDate":"2026-12-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"building-no-46-to-66-kala-wadia-clinic-road-m-w-2026-02-04","sourceKey":"building-no-46-to-66-kala-wadia-clinic-road-m-w-2026-02-04","firstSeen":"2026-07-04","state":{"roadName":"Building No 46 to  66 ,Kala Wadia clinic Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-02-04","endDate":"2026-12-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"building-no-54-to-ndr-11-ganesh-garden-road-m-w-2026-02-04","sourceKey":"building-no-54-to-ndr-11-ganesh-garden-road-m-w-2026-02-04","firstSeen":"2026-07-04","state":{"roadName":"Building No 54 to NDR 11, Ganesh Garden Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-02-04","endDate":"2026-11-30","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"bylane-between-venus-jupiter-a-2024-11-23","sourceKey":"bylane-between-venus-jupiter-a-2024-11-23","firstSeen":"2026-07-04","state":{"roadName":"Bylane between Venus & Jupiter","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-11-23","endDate":"2025-03-31","lengthM":139.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"byramji-gamadia-marg-d-x","sourceKey":"byramji-gamadia-marg-d-x","firstSeen":"2026-07-04","state":{"roadName":"Byramji Gamadia Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-g-nagpal-road-t-2023-11-01","sourceKey":"c-g-nagpal-road-t-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"C G Nagpal Road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":465,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-s-complex-internal-road-r-n-2024-10-01","sourceKey":"c-s-complex-internal-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"C.S.complex internal Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-s-road-dahisar-east-r-n-2025-10-15","sourceKey":"c-s-road-dahisar-east-r-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"C.S.Road, Dahisar East","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-15","endDate":"2026-01-05","lengthM":790,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-s-road-no-02-hambirrao-mohite-marg-road-from-sanji-hotel-to-matruchhaya-college-dahisar-e-r-n-2023-11-01","sourceKey":"c-s-road-no-02-hambirrao-mohite-marg-road-from-sanji-hotel-to-matruchhaya-college-dahisar-e-r-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"C.S. Road No. 02 ( Hambirrao Mohite Marg) Road from Sanji Hotel to Matruchhaya College, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2024-03-31","lengthM":235,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-s-road-no-03-road-from-bablipada-junction-to-ocean-heaven-hotel-dahisar-e-r-n-x","sourceKey":"c-s-road-no-03-road-from-bablipada-junction-to-ocean-heaven-hotel-dahisar-e-r-n-x","firstSeen":"2026-07-04","state":{"roadName":"C.S. Road No. 03 Road from Bablipada junction to Ocean Heaven Hotel, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-s-road-no-04-guruvarya-dadoji-konddev-marg-from-pritam-chsl-to-krishna-vatika-chsl-dahisar-e-r-n-x","sourceKey":"c-s-road-no-04-guruvarya-dadoji-konddev-marg-from-pritam-chsl-to-krishna-vatika-chsl-dahisar-e-r-n-x","firstSeen":"2026-07-04","state":{"roadName":"C.S. Road No. 04 Guruvarya Dadoji Konddev Marg from Pritam CHSL to Krishna Vatika CHSL, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-s-road-no-3-samadhan-hotel-to-nl-bridge-r-n-2025-10-15","sourceKey":"c-s-road-no-3-samadhan-hotel-to-nl-bridge-r-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"C.S. Road No.3 (Samadhan hotel to NL bridge)","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-15","endDate":"2026-04-15","lengthM":324,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-s-road-no-5-r-n-2025-11-01","sourceKey":"c-s-road-no-5-r-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"C.S. Road No.5","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-24","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"c-sector-karbala-maidan-m-e-x","sourceKey":"c-sector-karbala-maidan-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"C‐Sector Karbala Maidan","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2027-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cama-estate-road-goregaon-east-p-s-2023-11-01","sourceKey":"cama-estate-road-goregaon-east-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Cama Estate Road, Goregaon East","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"capt-prakash-pethe-jog-singh-deora-marg-a-2026-01-06","sourceKey":"capt-prakash-pethe-jog-singh-deora-marg-a-2026-01-06","firstSeen":"2026-07-04","state":{"roadName":"Capt. Prakash Pethe (Jog Singh Deora Marg)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-01-06","endDate":"2026-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"capt-prakash-pethe-road-a-2025-11-25","sourceKey":"capt-prakash-pethe-road-a-2025-11-25","firstSeen":"2026-07-04","state":{"roadName":"Capt. Prakash Pethe road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-25","endDate":"2026-12-22","lengthM":230,"pqcPercentProgress":78.26,"pqcCompletedOn":null},"changes":[]},
{"id":"captain-prakash-pethe-a-x","sourceKey":"captain-prakash-pethe-backbay-depo-jog-singh-deora-marg-a-x","firstSeen":"2026-10-13","state":{"roadName":"Captain Prakash Pethe (Backbay Depo\nJog Singh Deora Marg)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"roadName","from":"Captain Prakash Pethe","to":"Captain Prakash Pethe (Backbay Depo\nJog Singh Deora Marg)"}]},
{"id":"captain-prakash-pethe-president-hotel-to-sadhu-tl-vaswani-a-x","sourceKey":"captain-prakash-pethe-president-hotel-to-sadhu-tl-vaswani-a-x","firstSeen":"2026-10-13","state":{"roadName":"Captain prakash pethe President Hotel To Sadhu TL Vaswani","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"captain-samant-marg-rajsarathi-chs-road-k-w-x","sourceKey":"captain-samant-marg-rajsarathi-chs-road-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Captain Samant Marg +Rajsarathi CHS Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":null,"endDate":null,"lengthM":950,"pqcPercentProgress":92.63,"pqcCompletedOn":null},"changes":[]},
{"id":"carter-road-02-r-c-2025-02-01","sourceKey":"carter-road-02-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Carter Road 02","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2026-05-12","lengthM":525,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"carter-road-no-01-r-c-2025-02-01","sourceKey":"carter-road-no-01-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Carter Road no. 01","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2026-05-25","lengthM":235,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"carter-road-no-03-mota-ambaji-temple-r-c-2025-02-01","sourceKey":"carter-road-no-03-mota-ambaji-temple-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Carter Road no. 03 (Mota Ambaji temple )","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2026-04-07","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"carter-road-no-04-r-c-2024-10-01","sourceKey":"carter-road-no-04-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Carter Road no. 04","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"carter-road-no-07-r-c-2025-10-01","sourceKey":"carter-road-no-07-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Carter Road no. 07","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-17","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"carter-road-no-08-r-c-2025-02-01","sourceKey":"carter-road-no-08-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Carter Road no. 08","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2026-04-16","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cawasji-patel-street-a-2025-10-05","sourceKey":"cawasji-patel-street-a-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Cawasji Patel street","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-05","endDate":"2026-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cci-colony-road-goregaon-w-p-s-2023-11-01","sourceKey":"cci-colony-road-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"CCI Colony Road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":215,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ceaser-road-side-strip-k-w-2023-11-01","sourceKey":"ceaser-road-side-strip-k-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Ceaser Road Side Strip","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":865,"pqcPercentProgress":88.44,"pqcCompletedOn":null},"changes":[]},
{"id":"cement-godown-road-goregaon-east-p-s-2023-12-01","sourceKey":"cement-godown-road-goregaon-east-p-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Cement Godown Road, Goregaon East","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-01","endDate":"2024-05-24","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"centrel-avenue-road-h-w-2025-02-02","sourceKey":"centrel-avenue-road-h-w-2025-02-02","firstSeen":"2026-07-04","state":{"roadName":"Centrel Avenue Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-02-02","endDate":"2026-03-30","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chamarbaug-x-lane-i-f-s-2024-11-16","sourceKey":"chamarbaug-x-lane-i-f-s-2024-11-16","firstSeen":"2026-07-04","state":{"roadName":"Chamarbaug X Lane-I","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-16","endDate":"2025-03-31","lengthM":167,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chamarbaug-x-lane-ii-f-s-2024-11-16","sourceKey":"chamarbaug-x-lane-ii-f-s-2024-11-16","firstSeen":"2026-07-04","state":{"roadName":"Chamarbaug X Lane II","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-16","endDate":"2025-01-31","lengthM":56,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chamdawadi-road-no-01-h-e-2026-01-10","sourceKey":"chamdawadi-road-no-01-h-e-2026-01-10","firstSeen":"2026-07-04","state":{"roadName":"Chamdawadi Road No. - 01","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-10","endDate":"2026-05-07","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chamdawadi-road-no-02-h-e-2026-01-12","sourceKey":"chamdawadi-road-no-02-h-e-2026-01-12","firstSeen":"2026-07-04","state":{"roadName":"Chamdawadi Road No. - 02","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-12","endDate":"2026-05-15","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chamdawadi-road-no-03-h-e-2026-01-15","sourceKey":"chamdawadi-road-no-03-h-e-2026-01-15","firstSeen":"2026-07-04","state":{"roadName":"Chamdawadi Road No. - 03","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-15","endDate":"2026-05-23","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chamdawadi-road-no-04-h-e-2026-01-10","sourceKey":"chamdawadi-road-no-04-h-e-2026-01-10","firstSeen":"2026-07-04","state":{"roadName":"Chamdawadi Road No. - 04","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-10","endDate":"2026-05-17","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"champsi-bhimji-road-e-2025-10-10","sourceKey":"champsi-bhimji-road-e-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Champsi Bhimji Road","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-10","endDate":"2026-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chandanwadi-road-c-2024-11-20","sourceKey":"chandanwadi-road-c-2024-11-20","firstSeen":"2026-07-04","state":{"roadName":"Chandanwadi Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-20","endDate":"2026-03-20","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"chandawarkar-road-f-n-x","sourceKey":"chandawarkar-road-f-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Chandawarkar Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-15","endDate":"2027-05-31","lengthM":360,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-28","field":"startDate","from":null,"to":"2025-10-15"}]},
{"id":"chandawarkar-x-road-f-n-x","sourceKey":"chandawarkar-x-road-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Chandawarkar X Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":128,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chandrakant-kotecha-road-t-2023-04-04","sourceKey":"chandrakant-kotecha-road-t-2023-04-04","firstSeen":"2026-07-04","state":{"roadName":"Chandrakant Kotecha Road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-04-04","endDate":"2024-03-01","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chandrmani-buddhavihar-marg-e-x","sourceKey":"chandrmani-buddhavihar-marg-e-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chandrmani Buddhavihar Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-10","lengthM":395,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-28","field":"startDate","from":null,"to":"2026-10-01"}]},
{"id":"chapel-lane-santacruz-west-h-w-2024-10-01","sourceKey":"chapel-lane-santacruz-west-h-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chapel Lane (Santacruz West)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-10","lengthM":315,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chapel-road-h-w-x","sourceKey":"chapel-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Chapel Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":null,"lengthM":403,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"charai-village-road-m-w-2026-02-01","sourceKey":"charai-village-road-m-w-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Charai Village Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-02-01","endDate":"2026-05-20","lengthM":42,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"charatsingh-colony-k-e-2025-10-01","sourceKey":"charatsingh-colony-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Charatsingh Colony","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-09","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrabhuj-school-road-kandivali-e-r-s-2023-11-20","sourceKey":"chatrabhuj-school-road-kandivali-e-r-s-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Chatrabhuj School road, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-20","endDate":"2026-05-31","lengthM":395,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrapati-shivaji-maharaj-road-g-n-2024-11-26","sourceKey":"chatrapati-shivaji-maharaj-road-g-n-2024-11-26","firstSeen":"2026-07-04","state":{"roadName":"Chatrapati Shivaji Maharaj Road","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-26","endDate":"2025-04-29","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-a-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-a-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part A","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-b-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-b-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-c-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-c-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part C","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-d-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-d-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part D","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-e-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-e-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part E","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-f-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-f-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part F","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-g-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-g-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part G","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chatrpati-shivaji-raje-sankul-mhada-layout-part-h-p-n-2024-10-01","sourceKey":"chatrpati-shivaji-raje-sankul-mhada-layout-part-h-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chatrpati Shivaji Raje Sankul Mhada Layout Part H","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chaugule-nagar-road-r-c-x","sourceKey":"chaugule-nagar-road-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"CHAUGULE NAGAR ROAD","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":null,"endDate":null,"lengthM":540,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Completed","to":"In Progress"}]},
{"id":"chedda-nagar-road-no-2-m-w-2023-12-30","sourceKey":"chedda-nagar-road-no-2-m-w-2023-12-30","firstSeen":"2026-07-04","state":{"roadName":"Chedda Nagar Road no 2","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-30","endDate":"2024-05-25","lengthM":191,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chedda-nagar-road-no-3-m-w-2023-11-20","sourceKey":"chedda-nagar-road-no-3-m-w-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Chedda Nagar Road no 3","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-20","endDate":"2025-05-15","lengthM":394,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chedda-nagar-road-no-4-m-w-2023-10-16","sourceKey":"chedda-nagar-road-no-4-m-w-2023-10-16","firstSeen":"2026-07-04","state":{"roadName":"Chedda Nagar Road no 4","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-16","endDate":"2025-12-31","lengthM":429,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chembur-camp-road-from-adani-pillar-box-omkar-medical-to-gurukrupa-general-stores-m-w-x","sourceKey":"chembur-camp-road-from-adani-pillar-box-omkar-medical-to-gurukrupa-general-stores-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Chembur Camp Road from Adani Pillar Box (Omkar Medical) to Gurukrupa General Stores","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-12-30","lengthM":77,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-20","before":{"roadName":"Chembur Camp Road from Adani Pillar Box (Omkar Medical) to Gurukrupa General Stores","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2026-12-30","lengthM":77,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"chembur-camp-road-from-bmc-toilet-to-excellent-fabricators-m-w-2025-01-01","sourceKey":"chembur-camp-road-from-bmc-toilet-to-excellent-fabricators-m-w-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Chembur Camp Road from BMC Toilet to Excellent Fabricators","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-01-01","endDate":"2026-05-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-29","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"chembur-camp-road-from-mangaldeep-jwellers-to-bmc-toilet-smart-way-beauty-parlour-m-w-x","sourceKey":"chembur-camp-road-from-mangaldeep-jwellers-to-bmc-toilet-smart-way-beauty-parlour-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Chembur Camp Road from Mangaldeep Jwellers to BMC Toilet (Smart Way Beauty Parlour)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-12-30","lengthM":194,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-20","before":{"roadName":"Chembur Camp Road from Mangaldeep Jwellers to BMC Toilet (Smart Way Beauty Parlour)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2026-12-30","lengthM":194,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"chembur-camp-road-from-sarvoday-school-to-c-g-road-mini-star-stores-m-w-2025-01-01","sourceKey":"chembur-camp-road-from-sarvoday-school-to-c-g-road-mini-star-stores-m-w-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Chembur Camp Road from Sarvoday School to C. G. Road (Mini Star Stores)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-01-01","endDate":"2026-12-30","lengthM":773,"pqcPercentProgress":45.28,"pqcCompletedOn":null},"changes":[]},
{"id":"chetana-college-road-h-e-2023-11-20","sourceKey":"chetana-college-road-h-e-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Chetana College Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-20","endDate":"2024-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chhatrapati-shivaji-maharaj-road-extn-h-e-2024-01-01","sourceKey":"chhatrapati-shivaji-maharaj-road-extn-h-e-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Chhatrapati Shivaji Maharaj Road Extn.","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-30","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chheda-nagar-road-no-1-m-w-2023-04-01","sourceKey":"chheda-nagar-road-no-1-m-w-2023-04-01","firstSeen":"2026-07-04","state":{"roadName":"Chheda Nagar Road No. 1","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-04-01","endDate":"2024-02-28","lengthM":553,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chhitabhai-patel-road-kandivali-e-r-s-2024-10-01","sourceKey":"chhitabhai-patel-road-kandivali-e-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chhitabhai Patel Road, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":241,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"children-complex-road-h-e-2024-10-01","sourceKey":"children-complex-road-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Children complex road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chimanji-rajoji-marg-e-2024-11-16","sourceKey":"chimanji-rajoji-marg-e-2024-11-16","firstSeen":"2026-07-04","state":{"roadName":"Chimanji Rajoji Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-16","endDate":"2025-04-30","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chimat-pada-road-k-e-x","sourceKey":"chimat-pada-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Chimat Pada Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-21","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-09-21","before":{"roadName":"Chimat Pada Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2026-12-31","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"chincholi-bunder-extention-road-goregaon-west-p-s-2024-10-01","sourceKey":"chincholi-bunder-extention-road-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chincholi Bunder Extention Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":368,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chincholi-bunder-road-extention-goregaon-w-p-s-2023-11-01","sourceKey":"chincholi-bunder-road-extention-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Chincholi Bunder Road Extention, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-01-25","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chincholi-bunder-road-side-strips-goregaon-w-p-s-x","sourceKey":"chincholi-bunder-road-side-strips-goregaon-w-p-s-x","firstSeen":"2026-07-04","state":{"roadName":"Chincholi Bunder Road Side Strips, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":1050,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chinchpada-road-r-c-2025-02-01","sourceKey":"chinchpada-road-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Chinchpada Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chiranjilal-murarka-road-goregaon-east-p-s-2023-11-01","sourceKey":"chiranjilal-murarka-road-goregaon-east-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Chiranjilal Murarka Road, Goregaon East","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-25","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"chitale-path-g-n-2025-10-01","sourceKey":"chitale-path-g-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Chitale Path","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-03-31","lengthM":305,"pqcPercentProgress":32.79,"pqcCompletedOn":null},"changes":[]},
{"id":"church-pakhadi-road-no-2-k-e-2024-12-24","sourceKey":"church-pakhadi-road-no-2-k-e-2024-12-24","firstSeen":"2026-07-04","state":{"roadName":"Church Pakhadi Road no.2","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-24","endDate":"2026-10-30","lengthM":292,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"church-pakhadi-road-no-3-k-e-2024-10-14","sourceKey":"church-pakhadi-road-no-3-k-e-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Church Pakhadi Road no.3","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2024-10-14","endDate":"2026-04-08","lengthM":278,"pqcPercentProgress":28.78,"pqcCompletedOn":null},"changes":[]},
{"id":"church-road-dwarka-hotel-lbs-to-holly-cross-church-gate-l-2025-01-27","sourceKey":"church-road-dwarka-hotel-lbs-to-holly-cross-church-gate-l-2025-01-27","firstSeen":"2026-07-04","state":{"roadName":"Church road (Dwarka hotel LBS to Holly cross church gate)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-27","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"church-road-h-e-2024-10-01","sourceKey":"church-road-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Church Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-23","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"church-road-main-k-e-2025-11-09","sourceKey":"church-road-main-k-e-2025-11-09","firstSeen":"2026-07-04","state":{"roadName":"Church Road (Main)","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-09","endDate":"2026-11-20","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"church-road-vile-parle-west-k-w-2024-10-01","sourceKey":"church-road-vile-parle-west-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Church road Vile Parle West","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":433,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ciba-road-goregaon-east-p-s-2023-12-01","sourceKey":"ciba-road-goregaon-east-p-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Ciba Road, Goregaon East","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-01","endDate":"2024-05-24","lengthM":335,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cinemax-road-goregaon-west-p-s-2023-11-01","sourceKey":"cinemax-road-goregaon-west-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Cinemax Road, Goregaon West","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"clive-road-no-1-b-2025-03-30","sourceKey":"clive-road-no-1-b-2025-03-30","firstSeen":"2026-07-04","state":{"roadName":"Clive Road no.1","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-03-30","endDate":"2025-05-15","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cochin-street-a-2026-10-01","sourceKey":"cochin-street-a-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Cochin Street","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":176,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-bmc-school-to-plot-no-37b-m-w-x","sourceKey":"collector-colony-road-from-bmc-school-to-plot-no-37b-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from BMC School to Plot No. 37B","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":176,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-plot-no-101-to-plot-no-1-aarya-samaj-mandir-m-w-2025-01-01","sourceKey":"collector-colony-road-from-plot-no-101-to-plot-no-1-aarya-samaj-mandir-m-w-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Plot No. 101 to Plot No. 1 (Aarya Samaj Mandir)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-01-01","endDate":"2025-12-31","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-plot-no-103-aayush-saraswati-bldg-to-plot-no-37-safal-classic-chs-m-w-2023-10-02","sourceKey":"collector-colony-road-from-plot-no-103-aayush-saraswati-bldg-to-plot-no-37-safal-classic-chs-m-w-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Plot No. 103 (Aayush saraswati Bldg.) to Plot No. 37 (Safal Classic CHS)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-02","endDate":"2024-05-30","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-plot-no-37-safal-classic-chs-to-plot-no-77a-m-w-2024-11-01","sourceKey":"collector-colony-road-from-plot-no-37-safal-classic-chs-to-plot-no-77a-m-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Plot No. 37 (Safal Classic CHS) to Plot No. 77A","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-15","lengthM":378,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-plot-no-48a-to-aayush-aangan-bldg-m-w-2023-10-02","sourceKey":"collector-colony-road-from-plot-no-48a-to-aayush-aangan-bldg-m-w-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Plot No. 48A to Aayush Aangan Bldg.","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-02","endDate":"2024-05-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-plot-no-54a-to-plot-no-56b-m-w-2023-10-02","sourceKey":"collector-colony-road-from-plot-no-54a-to-plot-no-56b-m-w-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Plot No. 54A to Plot No. 56B","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-02","endDate":"2024-05-30","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-plot-no-78-collector-colony-nalla-to-siddhi-garima-bldg-m-w-2023-10-30","sourceKey":"collector-colony-road-from-plot-no-78-collector-colony-nalla-to-siddhi-garima-bldg-m-w-2023-10-30","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Plot No. 78 (Collector Colony Nalla) to Siddhi Garima Bldg.","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-10-30","endDate":"2026-11-16","lengthM":450,"pqcPercentProgress":57.78,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-plot-no-89a-collector-colony-nalla-to-plot-no-105b-m-w-2024-10-14","sourceKey":"collector-colony-road-from-plot-no-89a-collector-colony-nalla-to-plot-no-105b-m-w-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Plot No. 89A (Collector Colony Nalla) to Plot No. 105B","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-10-14","endDate":"2025-05-31","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-r-c-marg-to-to-plot-no-96a-ameya-towers-m-w-2023-10-18","sourceKey":"collector-colony-road-from-r-c-marg-to-to-plot-no-96a-ameya-towers-m-w-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from R.C. Marg to to Plot No. 96A (Ameya Towers)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-18","endDate":"2026-05-31","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"collector-colony-road-from-rochiram-thadani-school-to-plot-no-66b-rukum-villa-m-w-2023-10-02","sourceKey":"collector-colony-road-from-rochiram-thadani-school-to-plot-no-66b-rukum-villa-m-w-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Rochiram Thadani School to Plot No. 66B (Rukum Villa)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-02","endDate":"2024-04-30","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"collector-colony-road-from-swami-vivekanand-highschool-to-plot-no-72a-m-w-2023-10-02","sourceKey":"collector-colony-road-from-swami-vivekanand-highschool-to-plot-no-72a-m-w-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Collector Colony Road from Swami Vivekanand Highschool to Plot No. 72A","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-02","endDate":"2024-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"construction-of-approach-ramp-from-rangsharda-road-to-western-express-highway-at-bandra-w-in-h-w-ward-h-w-2026-02-09","sourceKey":"construction-of-approach-ramp-from-rangsharda-road-to-western-express-highway-at-bandra-w-in-h-w-ward-h-w-2026-02-09","firstSeen":"2026-07-04","state":{"roadName":"Construction of approach ramp from Rangsharda Road to Western Express Highway at Bandra (W) in H/W ward","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2026-02-09","endDate":"2026-05-31","lengthM":63,"pqcPercentProgress":71.43,"pqcCompletedOn":null},"changes":[]},
{"id":"convent-avenue-road-h-w-x","sourceKey":"convent-avenue-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Convent Avenue Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2027-03-18","lengthM":277,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"convent-road-h-w-2025-01-09","sourceKey":"convent-road-h-w-2025-01-09","firstSeen":"2026-07-04","state":{"roadName":"Convent Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-09","endDate":"2025-05-15","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"convent-street-a-2024-11-26","sourceKey":"convent-street-a-2024-11-26","firstSeen":"2026-07-04","state":{"roadName":"Convent Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-26","endDate":"2025-04-30","lengthM":111.3,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cooperage-road-a-x","sourceKey":"cooperage-road-a-x","firstSeen":"2026-07-04","state":{"roadName":"Cooperage Road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"copper-smith-road-e-x","sourceKey":"copper-smith-road-e-x","firstSeen":"2026-07-04","state":{"roadName":"Copper Smith Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cottage-lane-santacruz-west-h-w-2024-10-18","sourceKey":"cottage-lane-santacruz-west-h-w-2024-10-18","firstSeen":"2026-07-04","state":{"roadName":"Cottage Lane (Santacruz West)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-18","endDate":"2025-05-31","lengthM":92,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"craft-lane-h-w-2026-01-21","sourceKey":"craft-lane-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"Craft Lane","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-21","endDate":"2026-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cresent-tower-to-garima-global-building-c-t-s-no-650-3-k-w-2023-12-10","sourceKey":"cresent-tower-to-garima-global-building-c-t-s-no-650-3-k-w-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"Cresent Tower to Garima Global Building (C.T.S no 650/3 )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-10","endDate":"2024-05-24","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cross-road-joining-nanasaheb-dharmadhikari-marg-to-madhusudan-kalelkar-marg-a-opp-jade-garden-h-e-2024-10-16","sourceKey":"cross-road-joining-nanasaheb-dharmadhikari-marg-to-madhusudan-kalelkar-marg-a-opp-jade-garden-h-e-2024-10-16","firstSeen":"2026-07-04","state":{"roadName":"Cross Road joining Nanasaheb Dharmadhikari Marg to Madhusudan Kalelkar Marg a) Opp Jade Garden","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-16","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cross-road-joining-nanasaheb-dharmadhikari-marg-to-madhusudan-kalelkar-marg-b-jasmine-building-h-e-2024-10-01","sourceKey":"cross-road-joining-nanasaheb-dharmadhikari-marg-to-madhusudan-kalelkar-marg-b-jasmine-building-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Cross Road joining Nanasaheb Dharmadhikari Marg to Madhusudan Kalelkar Marg b) Jasmine Building","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cross-roads-joing-n-s-dharmadhikari-to-abasaheb-shinde-marg-h-e-2024-10-16","sourceKey":"cross-roads-joing-n-s-dharmadhikari-to-abasaheb-shinde-marg-h-e-2024-10-16","firstSeen":"2026-07-04","state":{"roadName":"Cross Roads Joing N S Dharmadhikari to Abasaheb Shinde Marg","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-16","endDate":"2025-05-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"crystal-tower-to-jvlr-near-rambaug-police-station-powai-s-x","sourceKey":"crystal-tower-to-jvlr-near-rambaug-police-station-powai-s-x","firstSeen":"2026-07-04","state":{"roadName":"Crystal tower to JVLR, Near Rambaug police station, Powai","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-15","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"currimbhoy-marg-a-2025-10-05","sourceKey":"currimbhoy-marg-a-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Currimbhoy Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-05","endDate":"2026-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"custom-colony-road-powai-s-2024-02-22","sourceKey":"custom-colony-road-powai-s-2024-02-22","firstSeen":"2026-07-04","state":{"roadName":"Custom Colony Road, Powai","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-02-22","endDate":"2024-06-10","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"cyril-road-exten-h-w-2023-11-01","sourceKey":"cyril-road-exten-h-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Cyril Road Exten","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-b-reality-internal-road-from-fire-station-to-new-bmc-school-m-w-x","sourceKey":"d-b-reality-internal-road-from-fire-station-to-new-bmc-school-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"D. B. Reality Internal Road from Fire Station to New BMC School","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2026-11-30","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-colony-lane-no-1-n-2023-12-11","sourceKey":"d-colony-lane-no-1-n-2023-12-11","firstSeen":"2026-07-04","state":{"roadName":"D Colony Lane No. 1","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-11","endDate":"2024-05-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-colony-lane-no-2-n-2026-01-01","sourceKey":"d-colony-lane-no-2-n-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"D Colony lane no.2","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-31","lengthM":136,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-colony-lane-no-3-n-2024-01-11","sourceKey":"d-colony-lane-no-3-n-2024-01-11","firstSeen":"2026-07-04","state":{"roadName":"D Colony Lane No.3","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-11","endDate":"2024-05-31","lengthM":136,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-lima-street-e-x","sourceKey":"d-lima-street-e-x","firstSeen":"2026-07-04","state":{"roadName":"D’lima Street","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-monte-p-n-2023-10-26","sourceKey":"d-monte-p-n-2023-10-26","firstSeen":"2026-07-04","state":{"roadName":"D'Monte","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-26","endDate":"2024-05-01","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-monte-park-road-ext-h-w-2024-12-01","sourceKey":"d-monte-park-road-ext-h-w-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"D'monte park Road Ext","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-01","endDate":"2026-04-24","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-n-dubey-road-dahisar-e-r-n-2023-11-23","sourceKey":"d-n-dubey-road-dahisar-e-r-n-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"D.N.Dubey Road, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-23","endDate":"2024-11-30","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-n-mhatre-cross-road-north-side-borivali-w-r-c-2024-10-01","sourceKey":"d-n-mhatre-cross-road-north-side-borivali-w-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"D.N. Mhatre cross Road, North Side Borivali (W).","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-n-mhatre-cross-road-south-side-borivali-w-r-c-2024-10-01","sourceKey":"d-n-mhatre-cross-road-south-side-borivali-w-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"D.N. Mhatre cross Road, South Side Borivali (W).","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-n-nagar-school-road-k-w-2023-05-11","sourceKey":"d-n-nagar-school-road-k-w-2023-05-11","firstSeen":"2026-07-04","state":{"roadName":"D N Nagar School Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-05-11","endDate":"2024-05-24","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-n-nagar-to-shitladevi-road-k-w-2024-10-01","sourceKey":"d-n-nagar-to-shitladevi-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"D N Nagar to Shitladevi Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":276,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-n-road-a-x","sourceKey":"d-n-road-a-x","firstSeen":"2026-07-04","state":{"roadName":"D.N. Road","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-13","before":{"roadName":"D.N. Road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"d-p-road-near-harshgiri-building-r-n-2025-01-15","sourceKey":"d-p-road-near-harshgiri-building-r-n-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"D. P Road Near Harshgiri Building","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-01-15","endDate":"2025-04-15","lengthM":88,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-p-road-no-9-l-x","sourceKey":"d-p-road-no-9-l-x","firstSeen":"2026-07-04","state":{"roadName":"D P road no 9","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":554,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"d-s-babrekar-marg-g-n-x","sourceKey":"d-s-babrekar-marg-g-n-x","firstSeen":"2026-07-04","state":{"roadName":"D S Babrekar Marg","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dada-bhai-cross-road-no-1-h-w-2024-10-17","sourceKey":"dada-bhai-cross-road-no-1-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Dada Bhai Cross Road No 1","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dada-bhai-cross-road-no-2-h-w-2024-10-17","sourceKey":"dada-bhai-cross-road-no-2-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Dada Bhai Cross Road No 2","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-04-30","lengthM":186,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dada-bhai-cross-road-no-3-c-shape-h-w-2024-10-17","sourceKey":"dada-bhai-cross-road-no-3-c-shape-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Dada Bhai Cross Road No 3 (C Shape)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dada-saheb-pendse-road-goregaon-e-p-s-2023-11-01","sourceKey":"dada-saheb-pendse-road-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Dada Saheb Pendse Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-25","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dada-save-road-ashok-nagar-kandivali-e-r-s-2023-11-01","sourceKey":"dada-save-road-ashok-nagar-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Dada Save Road, Ashok Nagar, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dadabhai-road-andheri-west-j-p-road-to-bhavans-college-k-w-2023-11-03","sourceKey":"dadabhai-road-andheri-west-j-p-road-to-bhavans-college-k-w-2023-11-03","firstSeen":"2026-07-04","state":{"roadName":"Dadabhai Road Andheri west ( J.P.Road to Bhavans College)","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-03","endDate":"2024-05-24","lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dadiseth-agiyari-lane-c-x","sourceKey":"dadiseth-agiyari-lane-c-x","firstSeen":"2026-07-04","state":{"roadName":"Dadiseth Agiyari Lane","ward":"C","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":485,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Dadiseth Agiyari Lane","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":485,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"dadishet-1st-cross-lane-d-2024-10-01","sourceKey":"dadishet-1st-cross-lane-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dadishet 1st cross lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-11-27","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dadishet-2nd-cross-lane-d-2026-10-01","sourceKey":"dadishet-2nd-cross-lane-d-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dadishet 2nd cross lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":150,"pqcPercentProgress":40,"pqcCompletedOn":null},"changes":[]},
{"id":"dadishet-road-d-2025-12-10","sourceKey":"dadishet-road-d-2025-12-10","firstSeen":"2026-07-04","state":{"roadName":"Dadishet Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-12-10","endDate":"2026-04-15","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dadishethi-road-p-n-2024-10-01","sourceKey":"dadishethi-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dadishethi Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":530,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dahiwalkar-buwa-marg-f-s-2024-12-01","sourceKey":"dahiwalkar-buwa-marg-f-s-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Dahiwalkar Buwa Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-01","endDate":"2026-05-01","lengthM":755,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dalavi-nagar-road-r-c-2024-10-01","sourceKey":"dalavi-nagar-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dalavi Nagar Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":137,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dalvi-road-from-honda-showroom-to-rangnath-keskar-dahisar-w-r-n-2023-10-24","sourceKey":"dalvi-road-from-honda-showroom-to-rangnath-keskar-dahisar-w-r-n-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Dalvi Road from Honda Showroom to Rangnath Keskar, Dahisar(W)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2024-05-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"damale-colony-road-kanjur-east-s-2024-01-04","sourceKey":"damale-colony-road-kanjur-east-s-2024-01-04","firstSeen":"2026-07-04","state":{"roadName":"Damale Colony Road, Kanjur East","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-04","endDate":"2025-05-15","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"damodar-mhatre-road-r-n-2024-10-01","sourceKey":"damodar-mhatre-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Damodar Mhatre Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-27","lengthM":98,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"damodar-sukhadwala-marg-a-2024-12-01","sourceKey":"damodar-sukhadwala-marg-a-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Damodar Sukhadwala Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-31","lengthM":196.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"damu-nagar-road-kandivali-e-r-s-2023-11-01","sourceKey":"damu-nagar-road-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Damu Nagar Road, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"darabsha-lane-d-2025-11-01","sourceKey":"darabsha-lane-d-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Darabsha Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":150,"pqcPercentProgress":46.67,"pqcCompletedOn":null},"changes":[]},
{"id":"dargah-road-bhandup-west-s-x","sourceKey":"dargah-road-bhandup-west-s-x","firstSeen":"2026-07-04","state":{"roadName":"Dargah Road, Bhandup (West)","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daryasthan-street-b-2025-11-10","sourceKey":"daryasthan-street-b-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"Daryasthan Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-10","endDate":"2026-04-15","lengthM":191,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"datta-jagdamba-marg-k-e-x","sourceKey":"datta-jagdamba-marg-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Datta Jagdamba Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"datta-mandir-road-h-e-2024-10-01","sourceKey":"datta-mandir-road-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Datta Mandir road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2024-10-01","endDate":"2027-05-03","lengthM":875,"pqcPercentProgress":80,"pqcCompletedOn":null},"changes":[]},
{"id":"datta-mandir-road-kandivali-w-r-s-2023-10-10","sourceKey":"datta-mandir-road-kandivali-w-r-s-2023-10-10","firstSeen":"2026-07-04","state":{"roadName":"Datta Mandir Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-10","endDate":"2024-11-30","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"datta-raul-marg-g-n-2025-10-08","sourceKey":"datta-raul-marg-g-n-2025-10-08","firstSeen":"2026-07-04","state":{"roadName":"Datta Raul Marg","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-08","endDate":"2027-05-24","lengthM":430,"pqcPercentProgress":53.49,"pqcCompletedOn":null},"changes":[]},
{"id":"dattamandir-road-bottel-neck-patche-p-n-2023-11-02","sourceKey":"dattamandir-road-bottel-neck-patche-p-n-2023-11-02","firstSeen":"2026-07-04","state":{"roadName":"Dattamandir Road (Bottel neck Patche)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-02","endDate":"2024-05-01","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dattani-park-road-side-strip-kandivali-east-r-s-2026-10-01","sourceKey":"dattani-park-road-side-strip-kandivali-east-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Dattani park Road Side Strip, Kandivali East","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2027-03-15","lengthM":1050,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dattapada-cross-road-1-r-c-2024-10-01","sourceKey":"dattapada-cross-road-1-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dattapada Cross Road 1","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":305,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dattapada-cross-road-2-r-c-2024-10-01","sourceKey":"dattapada-cross-road-2-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dattapada Cross Road 2","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":127,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dattaram-koyande-marg-e-x","sourceKey":"dattaram-koyande-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Dattaram Koyande marg","ward":"E","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":490,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Dattaram Koyande marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":490,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"dattaram-waikar-marg-k-e-2023-10-31","sourceKey":"dattaram-waikar-marg-k-e-2023-10-31","firstSeen":"2026-07-04","state":{"roadName":"Dattaram Waikar Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-31","endDate":"2025-02-20","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dattatray-road-h-w-x","sourceKey":"dattatray-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Dattatray Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dattatray-road-navjeevan-society-road-h-w-x","sourceKey":"dattatray-road-navjeevan-society-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Dattatray Road (Navjeevan Society Road)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":166,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-01-r-c-2025-02-01","sourceKey":"daulat-nagar-road-no-01-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Daulat Nagar Road No-01","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-02-r-c-2024-10-01","sourceKey":"daulat-nagar-road-no-02-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Daulat Nagar Road No-02","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-03-r-c-2025-02-01","sourceKey":"daulat-nagar-road-no-03-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Daulat nagar Road no. 03","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-12-28","lengthM":507,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-04-r-c-2025-12-01","sourceKey":"daulat-nagar-road-no-04-r-c-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Daulat nagar Road no. 04","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-12-01","endDate":"2026-05-28","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-05-r-c-2024-10-01","sourceKey":"daulat-nagar-road-no-05-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Daulat nagar Road no. 05","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-07-borivali-east-r-c-2023-12-01","sourceKey":"daulat-nagar-road-no-07-borivali-east-r-c-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"DAULAT NAGAR ROAD No.07, Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-01","endDate":"2025-05-31","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-08-borivali-east-r-c-2023-11-20","sourceKey":"daulat-nagar-road-no-08-borivali-east-r-c-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"DAULAT NAGAR ROAD No.08, Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-20","endDate":"2025-05-31","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-10-borivali-east-r-c-2023-11-26","sourceKey":"daulat-nagar-road-no-10-borivali-east-r-c-2023-11-26","firstSeen":"2026-07-04","state":{"roadName":"DAULAT NAGAR ROAD No.10\r\n , Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-26","endDate":"2026-04-05","lengthM":339,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-4-borivali-east-r-c-2023-11-01","sourceKey":"daulat-nagar-road-no-4-borivali-east-r-c-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Daulat NAGAR ROAD No.4 , Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-11-15","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-6-borivali-east-r-c-2023-12-01","sourceKey":"daulat-nagar-road-no-6-borivali-east-r-c-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Daulat NAGAR ROAD No.6 ,\r\n Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-01","endDate":"2025-12-01","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"daulat-nagar-road-no-9-borivali-east-r-c-x","sourceKey":"daulat-nagar-road-no-9-borivali-east-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Daulat NAGAR ROAD No.9 , Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dayabhai-patel-marg-goregaon-west-p-s-2025-03-01","sourceKey":"dayabhai-patel-marg-goregaon-west-p-s-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"Dayabhai Patel Marg, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-03-01","endDate":"2027-02-09","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dayaldas-main-road-part-1-k-e-2025-10-05","sourceKey":"dayaldas-main-road-part-1-k-e-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Dayaldas Main Road ( Part 1)","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-10-05","endDate":"2026-12-31","lengthM":320,"pqcPercentProgress":81.25,"pqcCompletedOn":null},"changes":[]},
{"id":"dayaldas-main-road-part-2-k-e-2023-12-10","sourceKey":"dayaldas-main-road-part-2-k-e-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"Dayaldas Main Road ( Part 2)","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-10","endDate":"2025-02-17","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"deepakwadi-road-h-e-2025-12-10","sourceKey":"deepakwadi-road-h-e-2025-12-10","firstSeen":"2026-07-04","state":{"roadName":"Deepakwadi Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-10","endDate":"2026-04-06","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"deodhar-road-f-n-2025-10-27","sourceKey":"deodhar-road-f-n-2025-10-27","firstSeen":"2026-07-04","state":{"roadName":"Deodhar Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-27","endDate":"2027-05-31","lengthM":312,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"deonar-colony-road-m-e-2025-11-17","sourceKey":"deonar-colony-road-m-e-2025-11-17","firstSeen":"2026-07-04","state":{"roadName":"Deonar Colony Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-17","endDate":"2026-01-08","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"deonar-village-road-m-e-2024-11-08","sourceKey":"deonar-village-road-m-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Deonar Village Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-11-08","endDate":"2027-01-21","lengthM":1400,"pqcPercentProgress":45,"pqcCompletedOn":null},"changes":[]},
{"id":"derasar-to-dead-r-c-2024-01-09","sourceKey":"derasar-to-dead-r-c-2024-01-09","firstSeen":"2026-07-04","state":{"roadName":"Derasar to Dead","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-01-09","endDate":"2024-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"deshbhakta-achyuta-balvanta-kolhatkar-marg-khetwadi-main-road-d-x","sourceKey":"deshbhakta-achyuta-balvanta-kolhatkar-marg-khetwadi-main-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Deshbhakta Achyuta Balvanta Kolhatkar Marg (Khetwadi Main Road)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-30","lengthM":370,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"deshmukh-lane-d-x","sourceKey":"deshmukh-lane-d-x","firstSeen":"2026-07-04","state":{"roadName":"Deshmukh lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-04-30","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dev-nagar-derasar-marg-r-c-2024-10-10","sourceKey":"dev-nagar-derasar-marg-r-c-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Dev Nagar Derasar Marg","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2026-05-03","lengthM":655,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"development-of-36-60m-wide-dp-road-from-zamalal-chowk-to-collector-colony-road-m-w-2026-02-23","sourceKey":"development-of-36-60m-wide-dp-road-from-zamalal-chowk-to-collector-colony-road-m-w-2026-02-23","firstSeen":"2026-07-04","state":{"roadName":"Development of 36.60m wide DP Road from Zamalal Chowk to Collector Colony Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-23","endDate":"2027-03-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"devi-dayal-road-road-side-strips-t-x","sourceKey":"devi-dayal-road-road-side-strips-t-x","firstSeen":"2026-07-04","state":{"roadName":"Devi Dayal Road Road (Side Strips)","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":975,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"devji-bhimji-and-laxmi-narayan-road-kandivali-w-r-s-2025-10-01","sourceKey":"devji-bhimji-and-laxmi-narayan-road-kandivali-w-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Devji Bhimji and Laxmi Narayan Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dewoolwadi-road-k-e-2025-01-21","sourceKey":"dewoolwadi-road-k-e-2025-01-21","firstSeen":"2026-07-04","state":{"roadName":"Dewoolwadi Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-21","endDate":"2025-06-09","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dhammakutir-marg-l-2023-11-01","sourceKey":"dhammakutir-marg-l-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Dhammakutir Marg","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2025-03-28","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dharivali-road-p-n-x","sourceKey":"dharivali-road-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Dharivali Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Deleted","startDate":null,"endDate":null,"lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dharmakshetra-building-road-back-side-of-amba-mata-road-r-c-2024-10-01","sourceKey":"dharmakshetra-building-road-back-side-of-amba-mata-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dharmakshetra Building Road (Back Side of Amba Mata Road)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":269,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dharmashala-road-b-x","sourceKey":"dharmashala-road-b-x","firstSeen":"2026-07-04","state":{"roadName":"Dharmashala Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":62,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dheeraj-enclave-cross-road-from-dheeraj-enclave-main-road-to-dead-end-borivali-east-r-c-2023-11-01","sourceKey":"dheeraj-enclave-cross-road-from-dheeraj-enclave-main-road-to-dead-end-borivali-east-r-c-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"DHEERAJ ENCLAVE CROSS ROAD FROM Dheeraj\r\n Enclave Main Road TO DEAD END, Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dhobi-street-b-x","sourceKey":"dhobi-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Dhobi Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":232,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dhobighat-road-h-e-2024-10-01","sourceKey":"dhobighat-road-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dhobighat Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2027-05-03","lengthM":610,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dholkar-lane-e-x","sourceKey":"dholkar-lane-e-x","firstSeen":"2026-07-04","state":{"roadName":"Dholkar Lane","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-01-31","lengthM":83.9,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dhumman-galli-f-n-2025-11-24","sourceKey":"dhumman-galli-f-n-2025-11-24","firstSeen":"2026-07-04","state":{"roadName":"Dhumman Galli","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2025-11-24","endDate":"2026-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dingeshwar-talav-road-kandivali-w-r-s-2023-11-01","sourceKey":"dingeshwar-talav-road-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Dingeshwar Talav Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":235,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dinsha-master-road-f-n-2024-11-27","sourceKey":"dinsha-master-road-f-n-2024-11-27","firstSeen":"2026-07-04","state":{"roadName":"Dinsha Master Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-27","endDate":"2025-05-31","lengthM":267,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dispensary-road-t-2024-12-15","sourceKey":"dispensary-road-t-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"Dispensary Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-15","endDate":"2026-03-15","lengthM":214,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dixit-road-k-e-2023-10-04","sourceKey":"dixit-road-k-e-2023-10-04","firstSeen":"2026-07-04","state":{"roadName":"Dixit Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-04","endDate":"2024-05-18","lengthM":385,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dmart-lane-k-w-2024-10-01","sourceKey":"dmart-lane-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dmart lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":238,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dockyard-road-extenstion-e-2025-11-07","sourceKey":"dockyard-road-extenstion-e-x","firstSeen":"2026-07-04","state":{"roadName":"Dockyard Road Extenstion","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-12-31","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"In Progress","to":"Not Started"},{"on":"2026-10-28","field":"startDate","from":"2025-11-07","to":null}]},
{"id":"dog-kennel-road-hindu-smashan-bhumi-deonar-to-dr-apj-abdul-kalam-garden-m-e-2023-10-20","sourceKey":"dog-kennel-road-hindu-smashan-bhumi-deonar-to-dr-apj-abdul-kalam-garden-m-e-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"Dog Kennel Road (hindu Smashan Bhumi, Deonar to Dr. APJ Abdul Kalam Garden)","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-20","endDate":"2025-05-31","lengthM":132,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dontad-street-b-x","sourceKey":"dontad-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Dontad Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dosti-acres-hill-road-f-n-2025-10-10","sourceKey":"dosti-acres-hill-road-f-n-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Dosti Acres Hill Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-10","endDate":"2027-03-31","lengthM":235,"pqcPercentProgress":21.28,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-ambedkar-road-17th-rd-to-silver-rock-h-w-2026-01-21","sourceKey":"dr-ambedkar-road-17th-rd-to-silver-rock-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"Dr. Ambedkar Road (17th Rd to Silver Rock)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2026-01-21","endDate":"2026-05-30","lengthM":240,"pqcPercentProgress":12.5,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-ambedkar-road-h-w-2026-01-21","sourceKey":"dr-ambedkar-road-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"Dr Ambedkar Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-01-21","endDate":"2026-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-ambedkar-road-palimala-jn-to-zigzag-rd-h-w-x","sourceKey":"dr-ambedkar-road-palimala-jn-to-zigzag-rd-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Dr. Ambedkar Road (Palimala Jn to Zigzag Rd)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2027-04-20","lengthM":215,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-arucha-shah-haquim-path-d-2025-11-14","sourceKey":"dr-arucha-shah-haquim-path-d-2025-11-14","firstSeen":"2026-07-04","state":{"roadName":"Dr. Arucha Shah Haquim Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-14","endDate":"2026-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-cawasji-hormasji-street-c-x","sourceKey":"dr-cawasji-hormasji-street-c-x","firstSeen":"2026-07-04","state":{"roadName":"Dr.Cawasji Hormasji Street","ward":"C","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-03-31","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Dr.Cawasji Hormasji Street","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"dr-kuwarsi-raysi-marg-masjid-siding-road-b-2024-10-01","sourceKey":"dr-kuwarsi-raysi-marg-masjid-siding-road-b-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dr. Kuwarsi Raysi Marg (Masjid Siding Road)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-08","lengthM":466,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-m-kane-marg-a-2025-11-15","sourceKey":"dr-m-kane-marg-a-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Dr.M.Kane Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-15","endDate":"2026-05-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-p-g-solanki-path-d-x","sourceKey":"dr-p-g-solanki-path-d-x","firstSeen":"2026-07-04","state":{"roadName":"Dr. P. G.Solanki Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-peter-dias-road-h-w-2023-10-01","sourceKey":"dr-peter-dias-road-h-w-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dr Peter Dias Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-05-31","lengthM":515,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-sayedina-burahnuddin-marg-kandivali-w-r-s-2024-10-01","sourceKey":"dr-sayedina-burahnuddin-marg-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dr. Sayedina Burahnuddin Marg, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-v-raghunath-marg-h-w-2024-12-01","sourceKey":"dr-v-raghunath-marg-h-w-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Dr. V Raghunath Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-10","lengthM":133,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-veigas-street-c-2024-11-03","sourceKey":"dr-veigas-street-c-2024-11-03","firstSeen":"2026-07-04","state":{"roadName":"Dr. Veigas Street","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-11-03","endDate":"2026-05-30","lengthM":330,"pqcPercentProgress":62.12,"pqcCompletedOn":null},"changes":[]},
{"id":"dr-wilson-path-d-2024-10-01","sourceKey":"dr-wilson-path-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dr. Wilson Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-20","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dream-park-road-kandivali-e-r-s-2026-01-01","sourceKey":"dream-park-road-kandivali-e-r-s-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Dream Park Road, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2026-01-01","endDate":"2027-04-30","lengthM":829.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"duct-line-road-bhandup-w-s-x","sourceKey":"duct-line-road-bhandup-w-s-x","firstSeen":"2026-07-04","state":{"roadName":"Duct Line Road,Bhandup(W).","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":1100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dudh-sagar-road-goregaon-e-p-s-2023-03-31","sourceKey":"dudh-sagar-road-goregaon-e-p-s-2023-03-31","firstSeen":"2026-07-04","state":{"roadName":"Dudh Sagar Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-03-31","endDate":"2024-01-24","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dumayne-road-a-2024-11-15","sourceKey":"dumayne-road-a-2024-11-15","firstSeen":"2026-07-04","state":{"roadName":"Dumayne Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-15","endDate":"2025-03-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"dunccan-cross-lane-e-x","sourceKey":"dunccan-cross-lane-e-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Dunccan Cross Lane","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-10-01","endDate":"2027-03-15","lengthM":125,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-28","field":"startDate","from":null,"to":"2026-10-01"}]},
{"id":"durgadevi-street-c-2025-10-25","sourceKey":"durgadevi-street-c-2025-10-25","firstSeen":"2026-07-04","state":{"roadName":"Durgadevi Street","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-25","endDate":"2027-05-21","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"east-avenue-road-h-w-2025-01-01","sourceKey":"east-avenue-road-h-w-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"East Avenue Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-01","endDate":"2026-05-31","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"eksar-road-r-c-x","sourceKey":"eksar-road-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Eksar Road","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":null,"endDate":null,"lengthM":1180,"pqcPercentProgress":95.34,"pqcCompletedOn":null},"changes":[]},
{"id":"ekta-bhoomi-road-r-c-2024-10-01","sourceKey":"ekta-bhoomi-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ekta Bhoomi Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-01-13","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ekta-nagar-cross-road-between-1-3-m-e-2026-04-01","sourceKey":"ekta-nagar-cross-road-between-1-3-m-e-2026-04-01","firstSeen":"2026-07-04","state":{"roadName":"Ekta Nagar Cross Road (between 1&3)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-04-01","endDate":"2027-02-05","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ekta-nagar-road-no-1-m-e-x","sourceKey":"ekta-nagar-road-no-1-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Ekta Nagar Road No 1","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-02-28","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ekta-nagar-road-no-2-m-e-x","sourceKey":"ekta-nagar-road-no-2-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Ekta Nagar Road No 2","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-04-30","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ekta-nagar-road-no-3-m-e-2025-10-01","sourceKey":"ekta-nagar-road-no-3-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ekta Nagar Road No 3","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":560,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"evershine-millenium-paradise-road-kandivali-e-r-s-2024-10-01","sourceKey":"evershine-millenium-paradise-road-kandivali-e-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Evershine Millenium Paradise Road, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":273,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"evershine-nagar-road-from-mini-punjab-to-movie-times-p-n-2024-10-01","sourceKey":"evershine-nagar-road-from-mini-punjab-to-movie-times-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Evershine nagar, Road from Mini Punjab to Movie Times","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":555,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"evershine-nagar-road-from-people-gym-to-dead-end-p-n-2024-10-01","sourceKey":"evershine-nagar-road-from-people-gym-to-dead-end-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Evershine nagar road from people gym to dead end","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"evershine-nagar-ryan-school-road-p-n-2024-10-01","sourceKey":"evershine-nagar-ryan-school-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Evershine Nagar, Ryan School Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-25","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ew-road-k-w-2025-04-30","sourceKey":"ew-road-k-w-2025-04-30","firstSeen":"2026-07-04","state":{"roadName":"EW Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-04-30","endDate":"2026-03-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"extension-of-baji-prabhu-deshpande-marg-from-road-no-10-to-road-no-15-m-e-2025-02-01","sourceKey":"extension-of-baji-prabhu-deshpande-marg-from-road-no-10-to-road-no-15-m-e-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Extension Of Baji Prabhu Deshpande Marg From Road No 10 to Road no.15","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-02-01","endDate":"2027-05-31","lengthM":570,"pqcPercentProgress":84.21,"pqcCompletedOn":null},"changes":[]},
{"id":"fagunmal-motwani-gully-t-2025-10-01","sourceKey":"fagunmal-motwani-gully-t-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Fagunmal Motwani Gully","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-01","lengthM":233,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"famous-studio-lane-g-s-2024-12-14","sourceKey":"famous-studio-lane-g-s-2024-12-14","firstSeen":"2026-07-04","state":{"roadName":"Famous Studio Lane","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-14","endDate":"2025-05-31","lengthM":186,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"farid-estate-road-kandivali-e-r-s-2023-11-01","sourceKey":"farid-estate-road-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Farid Estate Road, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"fattebagh-road-kandivali-w-r-s-2024-10-01","sourceKey":"fattebagh-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Fattebagh Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"fazal-road-a-2025-10-05","sourceKey":"fazal-road-a-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Fazal Road","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2025-10-05","endDate":"2026-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"free-press-journal-marg-a-2026-11-24","sourceKey":"free-press-journal-marg-a-2026-11-24","firstSeen":"2026-07-04","state":{"roadName":"Free press Journal Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-11-24","endDate":"2027-05-31","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"front-of-shiv-mandir-road-goregaon-west-p-s-2024-10-10","sourceKey":"front-of-shiv-mandir-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Front of Shiv Mandir Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":37,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"fulaji-buwa-nagre-path-d-x","sourceKey":"fulaji-buwa-nagre-path-d-x","firstSeen":"2026-07-04","state":{"roadName":"Fulaji Buwa Nagre Path","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"fun-republic-road-side-strips-k-w-2024-01-05","sourceKey":"fun-republic-road-side-strips-k-w-2024-01-05","firstSeen":"2026-07-04","state":{"roadName":"Fun Republic Road ( Side strips )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-05","endDate":"2024-05-31","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"g-b-indulakar-marg-k-e-x","sourceKey":"g-b-indulakar-marg-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"G. B. Indulakar Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"g-b-jukar-k-w-x","sourceKey":"g-b-jukar-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"G B Jukar","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":null,"lengthM":292,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"g-block-deonar-colony-m-e-2024-10-01","sourceKey":"g-block-deonar-colony-m-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"G block Deonar Colony","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-28","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"g-d-ambekar-marg-asphalt-stretches-f-s-2026-01-01","sourceKey":"g-d-ambekar-marg-asphalt-stretches-f-s-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"G.D.Ambekar Marg (Asphalt Stretches)","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-01-01","endDate":"2027-01-30","lengthM":390,"pqcPercentProgress":61.54,"pqcCompletedOn":null},"changes":[]},
{"id":"g-d-somani-cross-lane-2-a-2024-11-29","sourceKey":"g-d-somani-cross-lane-2-a-2024-11-29","firstSeen":"2026-07-04","state":{"roadName":"G.D. Somani Cross Lane-2","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-29","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"g-v-scheme-road-no-1-t-2023-04-09","sourceKey":"g-v-scheme-road-no-1-t-2023-04-09","firstSeen":"2026-07-04","state":{"roadName":"G.V. Scheme Road No.1","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-04-09","endDate":"2024-05-01","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"g-v-scheme-road-no-2-side-strips-t-2023-11-23","sourceKey":"g-v-scheme-road-no-2-side-strips-t-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"G.V.Scheme Road No. 2 (Side  Strips)","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-23","endDate":"2025-12-31","lengthM":295,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganapati-tower-junction-thakur-village-kandivali-e-r-s-2024-01-01","sourceKey":"ganapati-tower-junction-thakur-village-kandivali-e-r-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Ganapati Tower Junction, Thakur Village, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-01-01","endDate":"2024-11-30","lengthM":30,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganesh-dham-gully-t-2024-10-10","sourceKey":"ganesh-dham-gully-t-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Ganesh Dham Gully","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-10","endDate":"2026-01-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganesh-gully-f-s-2026-02-16","sourceKey":"ganesh-gully-f-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"Ganesh Gully","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-02-16","endDate":"2026-12-31","lengthM":120,"pqcPercentProgress":29.17,"pqcCompletedOn":null},"changes":[]},
{"id":"ganesh-gully-internal-road-f-s-2025-11-05","sourceKey":"ganesh-gully-internal-road-f-s-2025-11-05","firstSeen":"2026-07-04","state":{"roadName":"Ganesh Gully Internal Road","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-05","endDate":"2027-02-28","lengthM":600,"pqcPercentProgress":95,"pqcCompletedOn":null},"changes":[]},
{"id":"ganesh-hari-parundekar-marg-e-x","sourceKey":"ganesh-hari-parundekar-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Ganesh Hari Parundekar Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":490,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Ganesh Hari Parundekar Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":490,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"ganesh-mandir-road-h-e-2025-10-15","sourceKey":"ganesh-mandir-road-h-e-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Ganesh Mandir Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-15","endDate":"2026-05-21","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganesh-peth-road-g-n-x","sourceKey":"ganesh-peth-road-g-n-x","firstSeen":"2026-07-04","state":{"roadName":"Ganesh Peth Road","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganeshwadi-road-m-e-2025-10-01","sourceKey":"ganeshwadi-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ganeshwadi Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-30","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganga-bawdi-road-e-x","sourceKey":"ganga-bawdi-road-e-x","firstSeen":"2026-07-04","state":{"roadName":"Ganga Bawdi Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-02-28","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganpat-dyma-marg-h-e-2024-10-01","sourceKey":"ganpat-dyma-marg-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ganpat Dyma marg","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-30","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganpatrao-kadam-marg-part-portion-g-s-x","sourceKey":"ganpatrao-kadam-marg-part-portion-g-s-x","firstSeen":"2026-07-04","state":{"roadName":"Ganpatrao kadam marg (part portion)","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ganpatrao-kokate-marg-g-s-x","sourceKey":"ganpatrao-kokate-marg-g-s-x","firstSeen":"2026-07-04","state":{"roadName":"Ganpatrao Kokate Marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":212,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gaodevi-road-gillbirt-road-k-w-2025-10-10","sourceKey":"gaodevi-road-gillbirt-road-k-w-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Gaodevi Road (Gillbirt Road)","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-10","endDate":"2026-05-31","lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gaodevi-talav-road-k-e-2024-12-02","sourceKey":"gaodevi-talav-road-k-e-2024-12-02","firstSeen":"2026-07-04","state":{"roadName":"Gaodevi Talav Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-12-02","endDate":"2025-05-23","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gaondevi-road-ghatkopar-west-n-2025-02-25","sourceKey":"gaondevi-road-ghatkopar-west-n-2025-02-25","firstSeen":"2026-07-04","state":{"roadName":"Gaondevi Road, Ghatkopar (West)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-02-25","endDate":"2027-05-31","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"gaondevi-road-kandivali-w-r-s-2023-11-01","sourceKey":"gaondevi-road-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Gaondevi Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":240,"pqcPercentProgress":77.08,"pqcCompletedOn":null},"changes":[]},
{"id":"gaothan-road-no-1-m-w-2026-01-05","sourceKey":"gaothan-road-no-1-m-w-2026-01-05","firstSeen":"2026-07-04","state":{"roadName":"Gaothan Road No. 1","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-05","endDate":"2026-03-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gaothan-road-no-2-m-w-2024-11-14","sourceKey":"gaothan-road-no-2-m-w-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Gaothan Road No. 2","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-14","endDate":"2025-05-15","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gaothan-road-no-3-m-w-2026-11-25","sourceKey":"gaothan-road-no-3-m-w-2026-11-25","firstSeen":"2026-07-04","state":{"roadName":"Gaothan Road No. 3","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-11-25","endDate":"2027-05-10","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"garden-avenue-lane-ghatkopar-east-n-x","sourceKey":"garden-avenue-lane-ghatkopar-east-n-x","firstSeen":"2026-07-04","state":{"roadName":"Garden Avenue lane, Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"garden-road-a-ward-a-x","sourceKey":"garden-road-a-ward-a-x","firstSeen":"2026-07-04","state":{"roadName":"Garden Road A ward","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"garden-road-k-w-2024-10-20","sourceKey":"garden-road-k-w-2024-10-20","firstSeen":"2026-07-04","state":{"roadName":"Garden Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-20","endDate":"2025-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"garibdas-street-b-x","sourceKey":"garibdas-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Garibdas Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"garodia-nagar-plot-no-73-74-to-plot-no-95-n-2024-11-11","sourceKey":"garodia-nagar-plot-no-73-74-to-plot-no-95-n-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Garodia Nagar, Plot No 73/74 to plot No 95","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-11","endDate":"2026-12-31","lengthM":335,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gaurav-garden-road-kandivali-w-r-s-2023-10-09","sourceKey":"gaurav-garden-road-kandivali-w-r-s-2023-10-09","firstSeen":"2026-07-04","state":{"roadName":"Gaurav Garden Road , kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-09","endDate":"2024-11-30","lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gautam-buddha-marg-malad-w-p-n-2024-10-01","sourceKey":"gautam-buddha-marg-malad-w-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gautam Buddha Marg, Malad(W)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gautam-nagar-rd-from-dr-babasaheb-ambedkar-udyan-to-shivshakti-mandal-m-e-2025-10-01","sourceKey":"gautam-nagar-rd-from-dr-babasaheb-ambedkar-udyan-to-shivshakti-mandal-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gautam Nagar Rd from Dr. Babasaheb ambedkar udyan to Shivshakti Mandal","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-25","lengthM":290,"pqcPercentProgress":13.79,"pqcCompletedOn":null},"changes":[]},
{"id":"gautam-nagar-road-side-strip-m-e-2025-10-01","sourceKey":"gautam-nagar-road-side-strip-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gautam Nagar Road (Side Strip)","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-01","endDate":"2026-11-30","lengthM":275,"pqcPercentProgress":50.91,"pqcCompletedOn":null},"changes":[]},
{"id":"gavanpada-road-m-e-x","sourceKey":"gavanpada-road-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Gavanpada Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"On Hold","startDate":null,"endDate":"2027-01-08","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gayan-samrat-ustad-azmat-hussain-khaan-dilrang-marg-a-2024-12-12","sourceKey":"gayan-samrat-ustad-azmat-hussain-khaan-dilrang-marg-a-2024-12-12","firstSeen":"2026-07-04","state":{"roadName":"Gayan Samrat Ustad Azmat Hussain khaan Dilrang marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-12","endDate":"2025-05-31","lengthM":123,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gayaprasad-dhanuka-road-goregaon-w-p-s-2023-11-01","sourceKey":"gayaprasad-dhanuka-road-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Gayaprasad Dhanuka Road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-25","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gazdar-street-c-2025-11-01","sourceKey":"gazdar-street-c-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Gazdar Street","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-20","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"geeta-nagar-approach-road-a-x","sourceKey":"geeta-nagar-approach-road-a-x","firstSeen":"2026-07-04","state":{"roadName":"Geeta Nagar approach Road","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":685,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-13","before":{"roadName":"Geeta Nagar approach Road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":685,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"gen-a-k-vaidya-marg-5d-h-w-2026-01-20","sourceKey":"gen-a-k-vaidya-marg-5d-h-w-2026-01-20","firstSeen":"2026-07-04","state":{"roadName":"Gen. A. K. Vaidya Marg (5D)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-20","endDate":"2026-05-30","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ggs-road-t-2024-12-15","sourceKey":"ggs-road-t-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"GGS Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-12-15","endDate":"2027-05-14","lengthM":2000,"pqcPercentProgress":38.5,"pqcCompletedOn":null},"changes":[]},
{"id":"ghas-gully-e-x","sourceKey":"ghas-gully-e-x","firstSeen":"2026-07-04","state":{"roadName":"Ghas Gully","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ghati-pada-road-t-2023-04-12","sourceKey":"ghati-pada-road-t-2023-04-12","firstSeen":"2026-07-04","state":{"roadName":"Ghati Pada road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-04-12","endDate":"2024-05-01","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ghodapdeo-road-no-4-e-2025-12-01","sourceKey":"ghodapdeo-road-no-4-e-x","firstSeen":"2026-07-04","state":{"roadName":"Ghodapdeo Road No. 4","ward":"E","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-03-31","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-14","field":"startDate","from":"2025-12-01","to":null},{"on":"2026-10-17","field":"status","from":"Deleted","to":"Completed"},{"on":"2026-10-17","field":"startDate","from":null,"to":"2025-12-01"},{"on":"2026-10-28","field":"status","from":"Completed","to":"Deleted"},{"on":"2026-10-28","field":"startDate","from":"2025-12-01","to":null}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Ghodapdeo Road No. 4","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-12-01","endDate":"2027-03-31","lengthM":275,"pqcPercentProgress":55,"pqcCompletedOn":null}},{"on":"2026-10-28","before":{"roadName":"Ghodapdeo Road No. 4","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-12-01","endDate":"2027-03-31","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null}}],"aliases":["ghodapdeo-road-no-4-e-x"]},
{"id":"gilder-cross-lane-d-2025-10-15","sourceKey":"gilder-cross-lane-d-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Gilder Cross Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-15","endDate":"2026-01-31","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gilder-lane-d-x","sourceKey":"gilder-lane-d-x","firstSeen":"2026-07-04","state":{"roadName":"Gilder Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-04-15","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gmlr-east-side-strip-goregaon-e-p-s-2023-10-10","sourceKey":"gmlr-east-side-strip-goregaon-e-p-s-2023-10-10","firstSeen":"2026-07-04","state":{"roadName":"GMLR East Side Strip, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-10","endDate":"2026-03-23","lengthM":960,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gmlr-west-side-strip-goregaon-w-p-s-2023-11-04","sourceKey":"gmlr-west-side-strip-goregaon-w-p-s-2023-11-04","firstSeen":"2026-07-04","state":{"roadName":"GMLR West Side Strip, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-04","endDate":"2026-03-21","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"godavari-mhatre-road-r-n-2025-10-01","sourceKey":"godavari-mhatre-road-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Godavari Mhatre Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-25","lengthM":118,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"godrej-internal-road-from-shell-colony-road-to-sahkar-nagar-road-no-1-m-w-2025-12-15","sourceKey":"godrej-internal-road-from-shell-colony-road-to-sahkar-nagar-road-no-1-m-w-2025-12-15","firstSeen":"2026-07-04","state":{"roadName":"Godrej Internal Road from Shell Colony Road to Sahkar Nagar Road No.1","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-12-15","endDate":"2026-03-31","lengthM":115,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gogatewadi-road-goregaon-east-p-s-2025-10-01","sourceKey":"gogatewadi-road-goregaon-east-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gogatewadi Road, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":253,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gokhale-road-k-e-x","sourceKey":"gokhale-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Gokhale Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gokhale-road-kandivali-w-r-s-2023-10-26","sourceKey":"gokhale-road-kandivali-w-r-s-2023-10-26","firstSeen":"2026-07-04","state":{"roadName":"Gokhale Road, Kandivali(W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-26","endDate":"2024-11-30","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gokul-hall-marg-f-n-2024-12-04","sourceKey":"gokul-hall-marg-f-n-2024-12-04","firstSeen":"2026-07-04","state":{"roadName":"Gokul hall Marg","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-04","endDate":"2025-03-31","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gokuldas-pasta-road-f-s-2025-11-10","sourceKey":"gokuldas-pasta-road-f-s-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"Gokuldas Pasta Road","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-10","endDate":"2026-05-31","lengthM":207,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"golden-krida-mandal-r-c-x","sourceKey":"golden-krida-mandal-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Golden Krida Mandal","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":279,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gopinath-munde-garden-road-r-n-2024-10-01","sourceKey":"gopinath-munde-garden-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gopinath Munde Garden Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":281,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gorai-beach-road-r-c-2024-10-01","sourceKey":"gorai-beach-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gorai Beach Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":425,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"govan-road-r-n-2025-11-03","sourceKey":"govan-road-r-n-2025-11-03","firstSeen":"2026-07-04","state":{"roadName":"Govan Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-11-03","endDate":"2026-02-20","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"govandi-station-road-a-m-e-2024-10-10","sourceKey":"govandi-station-road-a-m-e-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Govandi Station Road a","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-10","endDate":"2026-05-30","lengthM":232,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"govind-mangesh-lad-marg-f-n-2025-10-15","sourceKey":"govind-mangesh-lad-marg-f-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Govind Mangesh Lad Marg","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-10-15","endDate":"2026-05-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"govind-nagar-int-road-2-r-c-2024-10-01","sourceKey":"govind-nagar-int-road-2-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Govind Nagar Int. Road 2","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":66,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"govind-nagar-main-road-borivali-west-r-c-2024-10-01","sourceKey":"govind-nagar-main-road-borivali-west-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Govind Nagar Main road Borivali West.","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":106,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"govind-shroff-marg-goregaon-west-p-s-2025-03-01","sourceKey":"govind-shroff-marg-goregaon-west-p-s-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"Govind Shroff Marg, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-03-01","endDate":"2026-02-20","lengthM":312,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"granthalay-marg-g-n-2025-01-01","sourceKey":"granthalay-marg-g-n-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Granthalay Marg","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-15","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"green-street-a-2025-10-01","sourceKey":"green-street-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Green Street","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-11-30","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gregorious-school-road-m-w-2024-11-14","sourceKey":"gregorious-school-road-m-w-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Gregorious School Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-14","endDate":"2025-05-15","lengthM":178,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"grotto-church-road-h-e-2025-01-01","sourceKey":"grotto-church-road-h-e-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Grotto Church Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-01","endDate":"2026-05-30","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gujar-lane-h-w-2026-03-25","sourceKey":"gujar-lane-h-w-2026-03-25","firstSeen":"2026-07-04","state":{"roadName":"Gujar Lane","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-03-25","endDate":"2026-05-31","lengthM":112,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-cross-no-12-k-w-2023-10-09","sourceKey":"gulmohar-cross-no-12-k-w-2023-10-09","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Cross no 12","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-09","endDate":"2024-05-24","lengthM":370,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-cross-road-10-k-w-x","sourceKey":"gulmohar-cross-road-10-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Cross Road 10","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":144,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-cross-road-11-k-w-x","sourceKey":"gulmohar-cross-road-11-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Cross Road 11","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":142,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-cross-road-no-05-k-w-2024-10-01","sourceKey":"gulmohar-cross-road-no-05-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Cross Road No.05","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":156,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-cross-road-no-06-k-w-2024-11-01","sourceKey":"gulmohar-cross-road-no-06-k-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Cross Road No.06","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-11-01","endDate":"2025-05-24","lengthM":162,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-cross-road-no-09-k-w-2025-10-01","sourceKey":"gulmohar-cross-road-no-09-k-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Cross Road no.09","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-20","lengthM":144,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-road-ganesh-sai-mandir-to-posha-nakhawa-school-k-w-2025-11-30","sourceKey":"gulmohar-road-ganesh-sai-mandir-to-posha-nakhawa-school-k-w-2025-11-30","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Road (Ganesh Sai Mandir to Posha Nakhawa School)","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-11-30","endDate":"2026-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gulmohar-road-no-07-k-w-x","sourceKey":"gulmohar-road-no-07-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Gulmohar Road no.07","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gundavali-gaothan-road-opp-triveni-bld-behind-municipal-chowkey-k-e-2024-12-16","sourceKey":"gundavali-gaothan-road-opp-triveni-bld-behind-municipal-chowkey-k-e-2024-12-16","firstSeen":"2026-07-04","state":{"roadName":"Gundavali Gaothan Road (opp. Triveni Bld & Behind Municipal Chowkey)","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-16","endDate":"2025-06-09","lengthM":151.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"guru-govind-singh-roof-top-k-e-2023-10-04","sourceKey":"guru-govind-singh-roof-top-k-e-2023-10-04","firstSeen":"2026-07-04","state":{"roadName":"Guru Govind Singh (Roof Top)","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-04","endDate":"2024-05-31","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gurudwara-road-h-e-2024-10-22","sourceKey":"gurudwara-road-h-e-2024-10-22","firstSeen":"2026-07-04","state":{"roadName":"Gurudwara Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-22","endDate":"2025-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gurudwara-road-h-w-h-w-2025-12-15","sourceKey":"gurudwara-road-h-w-h-w-2025-12-15","firstSeen":"2026-07-04","state":{"roadName":"Gurudwara Road, H/W","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-12-15","endDate":"2026-05-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gurudwara-road-p-north-p-n-2024-12-01","sourceKey":"gurudwara-road-p-north-p-n-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Gurudwara Road P/North","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-31","lengthM":105,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gurugangeshwar-road-h-w-2023-11-01","sourceKey":"gurugangeshwar-road-h-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Gurugangeshwar Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-01","endDate":"2026-02-02","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gurunanak-marg-g-n-2024-12-12","sourceKey":"gurunanak-marg-g-n-2024-12-12","firstSeen":"2026-07-04","state":{"roadName":"Gurunanak Marg","ward":"G/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2024-12-12","endDate":"2025-04-30","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gvs-road-3-t-2026-01-01","sourceKey":"gvs-road-3-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"GVS Road 3","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-14","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gvs-road-4-t-2026-01-01","sourceKey":"gvs-road-4-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"GVS Road 4","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-10","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gvs-road-5-t-2026-01-01","sourceKey":"gvs-road-5-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"GVS Road 5","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-04-23","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"gymkhana-road-goregaon-e-p-s-2023-11-01","sourceKey":"gymkhana-road-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Gymkhana road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"h-block-deonar-colony-m-e-2024-11-05","sourceKey":"h-block-deonar-colony-m-e-2024-11-05","firstSeen":"2026-07-04","state":{"roadName":"H block Deonar Colony","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-05","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"h-colony-road-c-shape-road-n-2023-12-30","sourceKey":"h-colony-road-c-shape-road-n-2023-12-30","firstSeen":"2026-07-04","state":{"roadName":"H colony road(C shape road)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-30","endDate":"2024-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"h-cross-road-c-x","sourceKey":"h-cross-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"H Cross Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-03","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"h-p-keluskar-marg-l-2024-12-09","sourceKey":"h-p-keluskar-marg-l-2024-12-09","firstSeen":"2026-07-04","state":{"roadName":"H.P. Keluskar Marg","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-12-09","endDate":"2025-10-18","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"h-r-mahajani-road-f-n-2025-11-04","sourceKey":"h-r-mahajani-road-f-n-2025-11-04","firstSeen":"2026-07-04","state":{"roadName":"H R Mahajani Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2025-11-04","endDate":"2026-05-31","lengthM":547,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"h-s-rupavate-road-side-strip-p-s-2026-02-16","sourceKey":"h-s-rupavate-road-side-strip-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"H. S. Rupavate Road (Side Strip)","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"haji-bacchu-ali-road-b-2025-10-27","sourceKey":"haji-bacchu-ali-road-b-2025-10-27","firstSeen":"2026-07-04","state":{"roadName":"Haji Bacchu Ali Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-27","endDate":"2025-12-15","lengthM":39,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"haji-bapu-road-patch-malad-e-part-a-p-n-2024-10-01","sourceKey":"haji-bapu-road-patch-malad-e-part-a-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Haji Bapu Road Patch, Malad (E )-Part A","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"haji-bapu-road-patch-malad-e-part-b-p-n-2024-10-21","sourceKey":"haji-bapu-road-patch-malad-e-part-b-p-n-2024-10-21","firstSeen":"2026-07-04","state":{"roadName":"Haji Bapu Road Patch, Malad (E )-Part B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-21","endDate":"2026-05-31","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"haji-jahoor-qureshi-marg-k-w-2025-10-05","sourceKey":"haji-jahoor-qureshi-marg-k-w-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Haji Jahoor Qureshi Marg","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-05","endDate":"2026-05-30","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"haji-malang-road-m-w-2026-10-15","sourceKey":"haji-malang-road-m-w-2026-10-15","firstSeen":"2026-07-04","state":{"roadName":"Haji Malang Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-10-15","endDate":"2027-01-15","lengthM":168,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hanuman-mandir-road-r-s-2025-10-01","sourceKey":"hanuman-mandir-road-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Hanuman Mandir Road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":1180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hanuman-tekdi-road-h-e-2026-02-06","sourceKey":"hanuman-tekdi-road-h-e-2026-02-06","firstSeen":"2026-07-04","state":{"roadName":"Hanuman Tekdi Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-02-06","endDate":"2026-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hanuman-tekdi-to-sant-ramdas-road-dahisar-e-r-n-2023-11-01","sourceKey":"hanuman-tekdi-to-sant-ramdas-road-dahisar-e-r-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Hanuman Tekdi to Sant Ramdas Road, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2024-12-30","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hardevbaba-garden-road-from-n-b-patil-marg-to-bmc-garden-m-w-2026-05-02","sourceKey":"hardevbaba-garden-road-from-n-b-patil-marg-to-bmc-garden-m-w-2026-05-02","firstSeen":"2026-07-04","state":{"roadName":"Hardevbaba Garden Road from N.B. Patil Marg to BMC Garden","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2026-05-02","endDate":"2026-05-15","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"harihareshwar-marg-l-2023-11-01","sourceKey":"harihareshwar-marg-l-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Harihareshwar Marg","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-01","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"harimandir-road-goregaon-west-p-s-2023-11-01","sourceKey":"harimandir-road-goregaon-west-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Harimandir Road, Goregaon West","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2026-03-18","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"harishankar-joshi-road-r-n-2024-10-10","sourceKey":"harishankar-joshi-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Harishankar Joshi Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":616,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"harishchandra-mahajan-marg-r-n-x","sourceKey":"harishchandra-mahajan-marg-r-n-x","firstSeen":"2026-07-04","state":{"roadName":"Harishchandra Mahajan Marg","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-03-18","lengthM":343,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"harishchandra-yelawe-marg-g-n-x","sourceKey":"harishchandra-yelawe-marg-g-n-x","firstSeen":"2026-07-04","state":{"roadName":"Harishchandra Yelawe Marg","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"harminder-singh-road-k-w-2023-03-25","sourceKey":"harminder-singh-road-k-w-2023-03-25","firstSeen":"2026-07-04","state":{"roadName":"Harminder Singh Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-03-25","endDate":"2024-12-31","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"harne-guruji-marg-h-e-2024-10-01","sourceKey":"harne-guruji-marg-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Harne Guruji Marg","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2026-01-02","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hasnat-school-road-marol-k-e-2024-10-30","sourceKey":"hasnat-school-road-marol-k-e-2024-10-30","firstSeen":"2026-07-04","state":{"roadName":"Hasnat School Road Marol","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-30","endDate":"2025-03-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hatiskar-marg-g-s-2025-11-25","sourceKey":"hatiskar-marg-g-s-2025-11-25","firstSeen":"2026-07-04","state":{"roadName":"Hatiskar Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-25","endDate":"2026-05-25","lengthM":335,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hazarat-abbas-street-b-x","sourceKey":"hazarat-abbas-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Hazarat Abbas Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hemukalani-main-road-kandivali-w-r-s-2023-11-01","sourceKey":"hemukalani-main-road-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Hemukalani main Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":720,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-08","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"henry-marg-a-x","sourceKey":"henry-marg-a-x","firstSeen":"2026-07-04","state":{"roadName":"Henry Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hill-top-road-k-e-2024-11-01","sourceKey":"hill-top-road-k-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Hill Top Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-03-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"himanshu-rai-road-p-n-2023-10-18","sourceKey":"himanshu-rai-road-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Himanshu Rai Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2024-05-01","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hindu-colony-road-no-6-f-n-x","sourceKey":"hindu-colony-road-no-6-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Hindu Colony Road No.6","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":null,"lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hinduja-college-lane-d-2024-10-01","sourceKey":"hinduja-college-lane-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Hinduja college lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":115,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hirabua-gawde-extension-marg-k-w-2025-04-20","sourceKey":"hirabua-gawde-extension-marg-k-w-2025-04-20","firstSeen":"2026-07-04","state":{"roadName":"Hirabua Gawde Extension Marg","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-04-20","endDate":"2026-03-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hirachand-desai-marg-n-2026-03-04","sourceKey":"hirachand-desai-marg-n-2026-03-04","firstSeen":"2026-07-04","state":{"roadName":"Hirachand Desai Marg","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-03-04","endDate":"2027-05-31","lengthM":350,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"holy-angels-school-road-t-2024-02-01","sourceKey":"holy-angels-school-road-t-2024-02-01","firstSeen":"2026-07-04","state":{"roadName":"Holy Angels school Road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-02-01","endDate":"2026-01-31","lengthM":298,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"holy-cross-cross-road-r-n-2024-10-01","sourceKey":"holy-cross-cross-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Holy Cross - Cross Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":386,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"holy-cross-cross-road-ymca-r-n-2024-12-01","sourceKey":"holy-cross-cross-road-ymca-r-n-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Holy Cross - Cross Road (YMCA)","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-12-01","endDate":"2025-06-09","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"holy-cross-road-from-link-road-to-kinny-s-corner-bldg-dahisar-west-r-n-2023-10-24","sourceKey":"holy-cross-road-from-link-road-to-kinny-s-corner-bldg-dahisar-west-r-n-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Holy Cross Road from Link Road to Kinny's Corner Bldg. , Dahisar West","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2025-05-31","lengthM":1050,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"homi-modi-marg-a-2025-10-01","sourceKey":"homi-modi-marg-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Homi Modi Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":240,"pqcPercentProgress":31.25,"pqcCompletedOn":null},"changes":[]},
{"id":"homji-street-a-x","sourceKey":"homji-street-a-x","firstSeen":"2026-07-04","state":{"roadName":"Homji street","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":132,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hormosji-street-a-2025-02-14","sourceKey":"hormosji-street-a-2025-02-14","firstSeen":"2026-07-04","state":{"roadName":"Hormosji Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-02-14","endDate":"2025-05-31","lengthM":83.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hospital-lane-ismile-khopkar-marg-e-x","sourceKey":"hospital-lane-ismile-khopkar-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Hospital Lane (Ismile Khopkar Marg)","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-04-10","lengthM":153.1,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hotel-orritel-west-to-maurya-house-c-t-s-no-650-3-k-w-2023-04-01","sourceKey":"hotel-orritel-west-to-maurya-house-c-t-s-no-650-3-k-w-2023-04-01","firstSeen":"2026-07-04","state":{"roadName":"Hotel Orritel West to Maurya House (C.T.S no 650/3 )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-04-01","endDate":"2026-04-10","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"hudkayya-mata-mandir-road-goregaon-west-p-s-2025-10-01","sourceKey":"hudkayya-mata-mandir-road-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Hudkayya Mata Mandir Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-08","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"husain-patel-marg-e-x","sourceKey":"husain-patel-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Husain Patel marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"husainbhai-alibhai-valji-marg-b-x","sourceKey":"husainbhai-alibhai-valji-marg-b-x","firstSeen":"2026-07-04","state":{"roadName":"Husainbhai Alibhai Valji Marg","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-cross-road-no-3-r-n-2025-10-01","sourceKey":"i-c-colony-cross-road-no-3-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Cross Road No. 3","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":483,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-cross-road-no-4-r-n-2024-10-01","sourceKey":"i-c-colony-cross-road-no-4-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Cross Road No. 4","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-cross-road-no-5-r-n-2025-10-01","sourceKey":"i-c-colony-cross-road-no-5-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Cross Road No. 5","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":216,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-crosss-road-no-3-kinny-corner-to-chhedda-apartment-dahisar-west-r-n-2023-12-01","sourceKey":"i-c-colony-crosss-road-no-3-kinny-corner-to-chhedda-apartment-dahisar-west-r-n-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Crosss Road no. 3, Kinny Corner to Chhedda Apartment, Dahisar (West)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-01","endDate":"2024-12-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-no-1-6-from-kinny-corner-to-sweetland-apt-dahisar-w-r-n-2023-10-24","sourceKey":"i-c-colony-road-no-1-6-from-kinny-corner-to-sweetland-apt-dahisar-w-r-n-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Road no. 1 & 6 from Kinny Corner to Sweetland Apt. , Dahisar(W)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2024-12-31","lengthM":305,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-no-2-from-priya-bunglow-to-adhunik-greens-bldg-dahisar-west-r-n-2023-10-23","sourceKey":"i-c-colony-road-no-2-from-priya-bunglow-to-adhunik-greens-bldg-dahisar-west-r-n-2023-10-23","firstSeen":"2026-07-04","state":{"roadName":"I.C Colony Road No. 2 , from Priya Bunglow to Adhunik Greens Bldg, Dahisar (West)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-23","endDate":"2024-10-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-no-2-r-n-2024-10-01","sourceKey":"i-c-colony-road-no-2-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Road No. 2","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":123,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-no-3-from-chheda-apt-to-silva-croft-apt-dahisar-west-r-n-2024-01-01","sourceKey":"i-c-colony-road-no-3-from-chheda-apt-to-silva-croft-apt-dahisar-west-r-n-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"I.C Colony Road No. 3 , from Chheda Apt to Silva Croft Apt, Dahisar (West)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-no-4-from-unity-house-to-anchorage-building-dahisar-w-r-n-2023-10-28","sourceKey":"i-c-colony-road-no-4-from-unity-house-to-anchorage-building-dahisar-w-r-n-2023-10-28","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Road no.4 from Unity House to Anchorage Building, Dahisar(W)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-28","endDate":"2024-12-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-no-5-abheru-niketan-to-shubh-jeevan-circle-r-n-2023-12-01","sourceKey":"i-c-colony-road-no-5-abheru-niketan-to-shubh-jeevan-circle-r-n-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Road no.5, Abheru Niketan to Shubh Jeevan Circle","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-01","endDate":"2024-12-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-r-n-2024-10-01","sourceKey":"i-c-colony-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-15","lengthM":163,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-c-colony-road-road-infront-of-ymca-ground-from-shubh-jeevan-circle-to-hcg-cancer-hospital-r-n-2023-10-24","sourceKey":"i-c-colony-road-road-infront-of-ymca-ground-from-shubh-jeevan-circle-to-hcg-cancer-hospital-r-n-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"I.C.Colony Road (Road infront of YMCA Ground) from Shubh Jeevan Circle to HCG Cancer Hospital","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2024-12-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"i-m-m-road-b-x","sourceKey":"i-m-m-road-b-x","firstSeen":"2026-07-04","state":{"roadName":"I M M Road","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":425,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"I M M Road","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":425,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"ibrahim-rahimtulla-road-m-ali-road-to-i-m-m-road-b-2025-10-01","sourceKey":"ibrahim-rahimtulla-road-m-ali-road-to-i-m-m-road-b-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ibrahim Rahimtulla Road ( M Ali Road to I M M Road)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-01","endDate":"2027-03-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"imamwada-road-b-2025-10-15","sourceKey":"imamwada-road-b-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Imamwada Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-15","endDate":"2027-03-31","lengthM":343,"pqcPercentProgress":32.07,"pqcCompletedOn":null},"changes":[]},
{"id":"indira-nagar-cross-road-janta-nagar-cross-road-m-e-2026-01-01","sourceKey":"indira-nagar-cross-road-janta-nagar-cross-road-m-e-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Indira Nagar cross road (Janta nagar cross road)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-11-30","lengthM":160,"pqcPercentProgress":9.38,"pqcCompletedOn":null},"changes":[]},
{"id":"indira-nagar-road-no-2-mandala-m-e-2026-01-01","sourceKey":"indira-nagar-road-no-2-mandala-m-e-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Indira Nagar Road No 2 Mandala","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2027-03-20","lengthM":245,"pqcPercentProgress":51.02,"pqcCompletedOn":null},"changes":[]},
{"id":"indiranagar-road-m-e-x","sourceKey":"indiranagar-road-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Indiranagar Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-30","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"indra-narayan-road-h-w-2026-02-05","sourceKey":"indra-narayan-road-h-w-2026-02-05","firstSeen":"2026-07-04","state":{"roadName":"Indra Narayan Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-02-05","endDate":"2026-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"indradarshan-road-k-w-2024-10-01","sourceKey":"indradarshan-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Indradarshan Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":162,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"indulal-d-bhuva-road-f-n-2025-11-01","sourceKey":"indulal-d-bhuva-road-f-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Indulal D Bhuva Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2027-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-colony-road-goregaon-west-p-s-2024-10-10","sourceKey":"industrial-colony-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Industrial Colony Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-plot-no-110-to-plot-no-126-r-s-2024-10-01","sourceKey":"industrial-estate-plot-no-110-to-plot-no-126-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate Plot no. 110 to plot no. 126","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-plot-no-139-136-137-149-r-s-2024-10-01","sourceKey":"industrial-estate-plot-no-139-136-137-149-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate Plot no. 139-136 & 137-149","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":352,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-plot-no-46-to-plot-no-34-r-s-2024-10-01","sourceKey":"industrial-estate-plot-no-46-to-plot-no-34-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate Plot no. 46 to plot no. 34","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2027-05-12","lengthM":444,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-rdp-2-to-babrekar-nagar-r-s-2024-10-01","sourceKey":"industrial-estate-rdp-2-to-babrekar-nagar-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate RDP - 2 to Babrekar Nagar","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":580,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-road-kandivali-w-plot-no-1-to-47-r-s-2024-10-01","sourceKey":"industrial-estate-road-kandivali-w-plot-no-1-to-47-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate Road, Kandivali (W) Plot no 1 to 47","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":790,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-road-kandivali-w-plot-no-131-to-133-r-s-2024-10-01","sourceKey":"industrial-estate-road-kandivali-w-plot-no-131-to-133-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate Road, Kandivali (W) Plot no 131 to 133","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-road-kandivali-w-plot-no-58-to-59-r-s-2024-10-01","sourceKey":"industrial-estate-road-kandivali-w-plot-no-58-to-59-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate Road, Kandivali (W) Plot no 58 to 59","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-estate-road-kandivali-w-plot-no-68-to-84-r-s-2024-10-01","sourceKey":"industrial-estate-road-kandivali-w-plot-no-68-to-84-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Estate Road, Kandivali (W)  Plot no 68 to 84","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":412,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-road-bandar-pakhadi-to-plot-no-17ab-r-s-2024-02-08","sourceKey":"industrial-road-bandar-pakhadi-to-plot-no-17ab-r-s-2024-02-08","firstSeen":"2026-07-04","state":{"roadName":"Industrial Road (Bandar pakhadi to Plot no. 17AB)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-02-08","endDate":"2024-11-30","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-road-garuda-petrol-pump-r-s-2023-10-16","sourceKey":"industrial-road-garuda-petrol-pump-r-s-2023-10-16","firstSeen":"2026-07-04","state":{"roadName":"Industrial Road (Garuda Petrol Pump)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-16","endDate":"2024-11-30","lengthM":460,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-road-mg-road-to-ba-road-r-s-2023-10-16","sourceKey":"industrial-road-mg-road-to-ba-road-r-s-2023-10-16","firstSeen":"2026-07-04","state":{"roadName":"Industrial Road (MG Road to BA Road)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-16","endDate":"2024-11-30","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-road-plot-no-64-to-59-r-s-2024-10-01","sourceKey":"industrial-road-plot-no-64-to-59-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Industrial Road Plot no 64 to 59","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"industrial-road-rdp-2-r-s-2023-10-16","sourceKey":"industrial-road-rdp-2-r-s-2023-10-16","firstSeen":"2026-07-04","state":{"roadName":"Industrial Road (RDP 2)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-16","endDate":"2024-11-30","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"infinity-mall-road-side-strip-malad-w-p-n-2025-11-01","sourceKey":"infinity-mall-road-side-strip-malad-w-p-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Infinity mall road Side Strip Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"internal-ganesh-kirti-mandal-m-e-2025-12-01","sourceKey":"internal-ganesh-kirti-mandal-m-e-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Internal Ganesh Kirti Mandal","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-12-01","endDate":"2027-05-31","lengthM":170,"pqcPercentProgress":23.53,"pqcCompletedOn":null},"changes":[]},
{"id":"iraniwadi-road-no-3-kandivali-w-r-s-2026-01-01","sourceKey":"iraniwadi-road-no-3-kandivali-w-r-s-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Iraniwadi Road No. 3, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2026-01-01","endDate":"2027-04-30","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"islampura-road-c-2025-12-10","sourceKey":"islampura-road-c-2025-12-10","firstSeen":"2026-07-04","state":{"roadName":"Islampura Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-12-10","endDate":"2026-05-30","lengthM":155,"pqcPercentProgress":23.23,"pqcCompletedOn":null},"changes":[]},
{"id":"j-b-khot-school-marg-r-c-2025-02-01","sourceKey":"j-b-khot-school-marg-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"J B Khot school marg","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2026-02-27","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-heradia-road-a-2025-11-03","sourceKey":"j-heradia-road-a-2025-11-03","firstSeen":"2026-07-04","state":{"roadName":"J. Heradia Road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-03","endDate":"2026-05-31","lengthM":388,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-k-bhasin-marg-f-n-x","sourceKey":"j-k-bhasin-marg-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"J K Bhasin Marg","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-k-paradaise-road-r-c-2025-12-03","sourceKey":"j-k-paradaise-road-r-c-2025-12-03","firstSeen":"2026-07-04","state":{"roadName":"J K Paradaise Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-12-03","endDate":"2026-03-15","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-k-sawant-marg-g-n-x","sourceKey":"j-k-sawant-marg-g-n-x","firstSeen":"2026-07-04","state":{"roadName":"J K Sawant Marg","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":365,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-l-shirshekar-marg-h-e-2023-04-27","sourceKey":"j-l-shirshekar-marg-h-e-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"J L Shirshekar Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2026-01-17","lengthM":770,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-m-marg-h-w-2026-01-20","sourceKey":"j-m-marg-h-w-2026-01-20","firstSeen":"2026-07-04","state":{"roadName":"J.M. Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-20","endDate":"2026-05-31","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-p-road-no-1-goregaon-e-p-s-2024-01-01","sourceKey":"j-p-road-no-1-goregaon-e-p-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"J.P.Road No.1, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-24","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"j-p-road-side-strips-k-w-2023-10-20","sourceKey":"j-p-road-side-strips-k-w-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"J.P.Road ( Side Strips)","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2026-05-31","lengthM":4200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-18","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"jagar-office-cross-road-no-2-goregaon-west-p-s-2024-12-15","sourceKey":"jagar-office-cross-road-no-2-goregaon-west-p-s-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"Jagar Office Cross Road no. 2, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-12-15","endDate":"2025-05-31","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jagar-office-road-unnat-nagar-4-goregaon-w-p-s-2023-10-01","sourceKey":"jagar-office-road-unnat-nagar-4-goregaon-w-p-s-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"\"Jagar\" Office Road, Unnat Nagar 4, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-01","endDate":"2024-05-24","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jagat-vidya-marg-h-e-2024-10-16","sourceKey":"jagat-vidya-marg-h-e-2024-10-16","firstSeen":"2026-07-04","state":{"roadName":"Jagat Vidya Marg","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-16","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jagdusha-nagar-road-n-2024-11-12","sourceKey":"jagdusha-nagar-road-n-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"Jagdusha Nagar Road","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-12","endDate":"2026-05-31","lengthM":581,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jagganath-pedhe-marg-old-fisheries-road-k-w-2024-10-01","sourceKey":"jagganath-pedhe-marg-old-fisheries-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jagganath Pedhe Marg ( Old Fisheries Road)","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":600,"pqcPercentProgress":95.83,"pqcCompletedOn":null},"changes":[]},
{"id":"jahangir-vima-dalal-road-f-n-2024-11-25","sourceKey":"jahangir-vima-dalal-road-f-n-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Jahangir Vima Dalal Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2024-11-25","endDate":"2025-05-31","lengthM":189,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jai-kisan-mandai-marg-m-w-2026-10-27","sourceKey":"jai-kisan-mandai-marg-m-w-2026-10-27","firstSeen":"2026-07-04","state":{"roadName":"Jai Kisan Mandai Marg","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-10-27","endDate":"2027-02-21","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jail-road-north-b-2025-01-15","sourceKey":"jail-road-north-b-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"Jail Road (North)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-15","endDate":"2025-12-02","lengthM":189,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jail-road-south-b-x","sourceKey":"jail-road-south-b-x","firstSeen":"2026-07-04","state":{"roadName":"Jail Road (South)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":179,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jail-road-west-b-x","sourceKey":"jail-road-west-b-x","firstSeen":"2026-07-04","state":{"roadName":"Jail Road (West)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":105,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-daresar-road-h-w-2023-04-27","sourceKey":"jain-daresar-road-h-w-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"Jain Daresar Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2025-02-26","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-derasar-road-f-n-x","sourceKey":"jain-derasar-road-f-n-2026-10-15","firstSeen":"2026-07-04","state":{"roadName":"Jain Derasar Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-10-15","endDate":"2027-05-31","lengthM":350,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-30","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-30","field":"startDate","from":null,"to":"2026-10-15"}]},
{"id":"jain-hospital-cross-road-no-2-goregaon-west-p-s-2026-02-15","sourceKey":"jain-hospital-cross-road-no-2-goregaon-west-p-s-2026-02-15","firstSeen":"2026-07-04","state":{"roadName":"Jain Hospital Cross Road no. 2, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-02-15","endDate":"2026-05-31","lengthM":72,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-hospital-cross-road-no-3-goregaon-west-p-s-2026-02-20","sourceKey":"jain-hospital-cross-road-no-3-goregaon-west-p-s-2026-02-20","firstSeen":"2026-07-04","state":{"roadName":"Jain Hospital Cross Road no. 3, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-02-20","endDate":"2026-05-31","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-hospital-cross-road-no-4-goregaon-west-p-s-2026-02-01","sourceKey":"jain-hospital-cross-road-no-4-goregaon-west-p-s-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Jain Hospital Cross Road no. 4, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-02-01","endDate":"2026-05-31","lengthM":62,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-hospital-cross-road-no-5-goregaon-west-p-s-2026-02-01","sourceKey":"jain-hospital-cross-road-no-5-goregaon-west-p-s-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Jain Hospital Cross Road no. 5, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-02-01","endDate":"2026-05-31","lengthM":62,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-hospital-cross-road-no-6-goregaon-west-p-s-2026-03-01","sourceKey":"jain-hospital-cross-road-no-6-goregaon-west-p-s-2026-03-01","firstSeen":"2026-07-04","state":{"roadName":"Jain Hospital Cross Road no. 6, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-03-01","endDate":"2026-05-31","lengthM":56,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-mandir-road-powai-s-2024-01-02","sourceKey":"jain-mandir-road-powai-s-2024-01-02","firstSeen":"2026-07-04","state":{"roadName":"Jain Mandir Road, Powai","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-02","endDate":"2024-05-25","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jain-mandir-road-r-c-2023-11-01","sourceKey":"jain-mandir-road-r-c-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Jain Mandir Road","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jairaj-b-temkar-marg-g-s-2024-11-29","sourceKey":"jairaj-b-temkar-marg-g-s-2024-11-29","firstSeen":"2026-07-04","state":{"roadName":"Jairaj B Temkar Marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-29","endDate":"2025-05-31","lengthM":403,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jalvayu-vihar-side-strip-junction-powai-s-2023-12-26","sourceKey":"jalvayu-vihar-side-strip-junction-powai-s-2023-12-26","firstSeen":"2026-07-04","state":{"roadName":"Jalvayu Vihar Side Strip & Junction, Powai","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-26","endDate":"2025-05-31","lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jame-jamshed-road-f-n-2024-12-24","sourceKey":"jame-jamshed-road-f-n-2024-12-24","firstSeen":"2026-07-04","state":{"roadName":"Jame Jamshed Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-24","endDate":"2026-05-31","lengthM":1074,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jamil-nagar-road-bhandup-west-s-2024-01-03","sourceKey":"jamil-nagar-road-bhandup-west-s-2024-01-03","firstSeen":"2026-07-04","state":{"roadName":"Jamil Nagar Road, Bhandup (West).","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-03","endDate":"2026-05-20","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"janata-nagar-gully-no-2-m-e-2025-10-02","sourceKey":"janata-nagar-gully-no-2-m-e-2025-10-02","firstSeen":"2026-07-04","state":{"roadName":"Janata Nagar Gully no. 2","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-02","endDate":"2026-12-31","lengthM":230,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"janata-nagar-gully-no-3-m-e-2025-10-01","sourceKey":"janata-nagar-gully-no-3-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Janata Nagar gully No 3","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":216,"pqcPercentProgress":64.81,"pqcCompletedOn":null},"changes":[]},
{"id":"janata-nagar-gully-no-4-m-e-2025-10-01","sourceKey":"janata-nagar-gully-no-4-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Janata Nagar gully No 4","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":222,"pqcPercentProgress":36.04,"pqcCompletedOn":null},"changes":[]},
{"id":"janata-nagar-gully-no-5-m-e-2025-10-01","sourceKey":"janata-nagar-gully-no-5-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Janata Nagar gully No 5","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-02","lengthM":224,"pqcPercentProgress":22.32,"pqcCompletedOn":null},"changes":[]},
{"id":"janata-nagar-main-road-m-e-x","sourceKey":"janata-nagar-main-road-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Janata Nagar Main Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"janjikar-street-m-ali-road-to-abdul-rehman-street-b-2025-11-15","sourceKey":"janjikar-street-m-ali-road-to-abdul-rehman-street-b-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Janjikar Street (M Ali Road to Abdul Rehman street)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-15","endDate":"2026-05-15","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-charkop-road-malad-w-p-n-2023-10-12","sourceKey":"jankalyan-charkop-road-malad-w-p-n-2023-10-12","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Charkop Road Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-12","endDate":"2024-05-01","lengthM":665,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-internal-road-p-n-2024-10-01","sourceKey":"jankalyan-internal-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Internal road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2024-10-01","endDate":"2026-12-31","lengthM":450,"pqcPercentProgress":88.89,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-nagar-road-from-police-chowki-dead-end-p-n-2024-10-01","sourceKey":"jankalyan-nagar-road-from-police-chowki-dead-end-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Nagar road from Police Chowki Dead End","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-15","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-nagar-road-from-police-chowki-to-bafira-road-p-n-2024-09-30","sourceKey":"jankalyan-nagar-road-from-police-chowki-to-bafira-road-p-n-2024-09-30","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Nagar road from Police Chowki to Bafira Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-09-30","endDate":"2025-05-14","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-nagar-road-from-police-chowki-to-papilon-appt-and-garden-p-n-2024-12-01","sourceKey":"jankalyan-nagar-road-from-police-chowki-to-papilon-appt-and-garden-p-n-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Nagar, road from Police Chowki to Papilon Appt and garden","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-15","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-nagar-road-kandivali-w-r-s-2024-10-01","sourceKey":"jankalyan-nagar-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Nagar Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":255,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-nagar-road-p-n-2023-11-02","sourceKey":"jankalyan-nagar-road-p-n-2023-11-02","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Nagar Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-02","endDate":"2026-05-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankalyan-nagar-thakkar-complex-road-p-n-2024-10-01","sourceKey":"jankalyan-nagar-thakkar-complex-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jankalyan Nagar, Thakkar Complex road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-15","lengthM":433,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jankidevi-school-road-k-w-2024-10-01","sourceKey":"jankidevi-school-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jankidevi School Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-30","lengthM":940,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"janta-nagar-cross-road-between-5-6-m-e-x","sourceKey":"janta-nagar-cross-road-between-5-6-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Janta Nagar Cross Road between 5 &6","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-05","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"janta-nagar-gully-no-1-m-e-2025-10-01","sourceKey":"janta-nagar-gully-no-1-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Janta Nagar gully No 1","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2027-01-10","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-08-15","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"janta-nagar-road-no-6-m-e-2025-10-01","sourceKey":"janta-nagar-road-no-6-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Janta Nagar Road no.6","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"janupada-thakur-village-road-kandivali-e-r-s-2026-10-01","sourceKey":"janupada-thakur-village-road-kandivali-e-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Janupada Thakur Village Road, Kandivali(E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2026-11-30","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jari-mari-road-h-w-2024-10-01","sourceKey":"jari-mari-road-h-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jari Mari Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-20","lengthM":314,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jathedar-harasing-marg-f-n-2025-12-09","sourceKey":"jathedar-harasing-marg-f-n-2025-12-09","firstSeen":"2026-07-04","state":{"roadName":"Jathedar Harasing Marg","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-12-09","endDate":"2026-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-10-goregaon-w-p-s-2023-11-01","sourceKey":"jawahar-nagar-road-no-10-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 10, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-12-goregaon-w-p-s-x","sourceKey":"jawahar-nagar-road-no-12-goregaon-w-p-s-x","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 12, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-12-goregaon-west-p-s-2024-10-01","sourceKey":"jawahar-nagar-road-no-12-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No.12, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-20","lengthM":265,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-13-goregaon-west-p-s-2024-10-01","sourceKey":"jawahar-nagar-road-no-13-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road no. 13, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":263,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-14-goregaon-west-p-s-2024-10-01","sourceKey":"jawahar-nagar-road-no-14-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road no. 14, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-07","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-15-p-s-2026-02-16","sourceKey":"jawahar-nagar-road-no-15-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar road no.15","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":276,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-16-goregaon-w-p-s-2024-12-26","sourceKey":"jawahar-nagar-road-no-16-goregaon-w-p-s-2024-12-26","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 16, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-12-26","endDate":"2026-05-20","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-17-goregaon-w-p-s-2024-12-05","sourceKey":"jawahar-nagar-road-no-17-goregaon-w-p-s-2024-12-05","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 17, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-12-05","endDate":"2026-04-07","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-18-goregaon-w-p-s-2023-11-01","sourceKey":"jawahar-nagar-road-no-18-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 18, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-19-goregaon-w-p-s-2025-03-25","sourceKey":"jawahar-nagar-road-no-19-goregaon-w-p-s-2025-03-25","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 19, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-03-25","endDate":"2026-03-11","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-2-goregaon-west-p-s-2024-10-01","sourceKey":"jawahar-nagar-road-no-2-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road no. 2, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-2-side-strip-p-s-2026-02-16","sourceKey":"jawahar-nagar-road-no-2-side-strip-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar road no.2 (Side Strip)","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":247,"pqcPercentProgress":56.68,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-3-goregaon-w-p-s-2024-01-01","sourceKey":"jawahar-nagar-road-no-3-goregaon-w-p-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 3, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-24","lengthM":215,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-3-goregaon-west-p-s-2025-10-01","sourceKey":"jawahar-nagar-road-no-3-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road no. 3, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2027-03-14","lengthM":249,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-nagar-road-no-4-goregaon-w-p-s-2023-11-01","sourceKey":"jawahar-nagar-road-no-4-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Nagar Road No. 4, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":265,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jawahar-ram-sumer-yadav-road-r-s-x","sourceKey":"jawahar-ram-sumer-yadav-road-r-s-x","firstSeen":"2026-07-04","state":{"roadName":"Jawahar Ram Sumer Yadav Road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jay-bhavani-road-t-2026-01-01","sourceKey":"jay-bhavani-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Jay Bhavani Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-05-15","lengthM":160,"pqcPercentProgress":81.25,"pqcCompletedOn":null},"changes":[]},
{"id":"jay-maharashtra-ganesh-maidan-mcgm-school-marg-parsiwadi-n-2024-11-12","sourceKey":"jay-maharashtra-ganesh-maidan-mcgm-school-marg-parsiwadi-n-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"Jay Maharashtra Ganesh maidan MCGM school marg, Parsiwadi","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-12","endDate":"2026-03-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jay-maharashtra-nagar-rd-no-3-borivali-east-r-c-2024-10-01","sourceKey":"jay-maharashtra-nagar-rd-no-3-borivali-east-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jay Maharashtra Nagar Rd No.3, Borivali (East)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":142,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jayant-palkar-marg-g-s-2025-11-08","sourceKey":"jayant-palkar-marg-g-s-2025-11-08","firstSeen":"2026-07-04","state":{"roadName":"Jayant Palkar Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-08","endDate":"2026-05-29","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jaydeep-nagar-road-nahur-east-s-2024-10-14","sourceKey":"jaydeep-nagar-road-nahur-east-s-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Jaydeep Nagar Road, Nahur East","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-14","endDate":"2025-04-30","lengthM":168,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jayraj-bhai-lane-d-x","sourceKey":"jayraj-bhai-lane-d-x","firstSeen":"2026-07-04","state":{"roadName":"Jayraj Bhai Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jaywant-sawant-road-from-below-sudhir-phadke-bridge-to-ranchhoddas-road-junction-dahisar-west-r-n-2025-10-05","sourceKey":"jaywant-sawant-road-from-below-sudhir-phadke-bridge-to-ranchhoddas-road-junction-dahisar-west-r-n-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Jaywant Sawant Road, From below Sudhir Phadke Bridge to Ranchhoddas Road junction Dahisar West","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-05","endDate":"2026-02-18","lengthM":990,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jbcn-school-road-k-w-2024-10-01","sourceKey":"jbcn-school-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"JBCN School road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":218,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jeevan-vikas-kendra-marg-k-e-2025-10-30","sourceKey":"jeevan-vikas-kendra-marg-k-e-2025-10-30","firstSeen":"2026-07-04","state":{"roadName":"Jeevan Vikas Kendra Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-30","endDate":"2026-05-18","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jeshtaram-kapadia-road-full-width-paver-portion-r-c-x","sourceKey":"jeshtaram-kapadia-road-full-width-paver-portion-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Jeshtaram Kapadia Road (Full Width Paver Portion)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-05-05","lengthM":186,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jethabhai-lane-n-2024-11-25","sourceKey":"jethabhai-lane-n-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Jethabhai Lane","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-11-25","endDate":"2027-03-31","lengthM":330,"pqcPercentProgress":66.67,"pqcCompletedOn":null},"changes":[]},
{"id":"jhunjhunwala-college-road-n-2023-11-01","sourceKey":"jhunjhunwala-college-road-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Jhunjhunwala College road","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-11-01","endDate":"2027-05-31","lengthM":270,"pqcPercentProgress":75,"pqcCompletedOn":null},"changes":[]},
{"id":"jijamata-road-sidesstrip-k-e-x","sourceKey":"jijamata-road-sidesstrip-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Jijamata Road Sidesstrip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":620,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jijibai-dadabhai-marg-a-2024-10-01","sourceKey":"jijibai-dadabhai-marg-a-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jijibai Dadabhai Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jitendra-road-malad-east-p-n-2023-11-02","sourceKey":"jitendra-road-malad-east-p-n-2023-11-02","firstSeen":"2026-07-04","state":{"roadName":"Jitendra Road, Malad (East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-02","endDate":"2024-05-01","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jiva-mahale-marg-side-strip-k-e-2025-01-02","sourceKey":"jiva-mahale-marg-side-strip-k-e-2025-01-02","firstSeen":"2026-07-04","state":{"roadName":"Jiva Mahale Marg Side strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-02","endDate":"2025-06-04","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jivba-atmaram-raul-marg-g-s-2024-12-13","sourceKey":"jivba-atmaram-raul-marg-g-s-2024-12-13","firstSeen":"2026-07-04","state":{"roadName":"Jivba Atmaram Raul Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-13","endDate":"2025-05-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jogeshwari-gumpha-road-k-e-2025-10-01","sourceKey":"jogeshwari-gumpha-road-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jogeshwari Gumpha road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-15","lengthM":334,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jogeshwari-gunfa-road-side-strip-k-e-2025-10-01","sourceKey":"jogeshwari-gunfa-road-side-strip-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jogeshwari Gunfa Road Side strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":550,"pqcPercentProgress":77.27,"pqcCompletedOn":null},"changes":[]},
{"id":"joggers-park-road-h-w-2024-10-19","sourceKey":"joggers-park-road-h-w-2024-10-19","firstSeen":"2026-07-04","state":{"roadName":"Joggers Park Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-19","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"joggers-park-road-including-rdp-13th-road-borivali-west-r-c-2023-11-20","sourceKey":"joggers-park-road-including-rdp-13th-road-borivali-west-r-c-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Joggers Park Road Including RDP 13th Road, Borivali(West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-20","endDate":"2025-01-31","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"john-baptista-road-h-w-x","sourceKey":"john-baptista-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"John Baptista Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":615,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jolly-board-road-side-strips-s-2024-10-01","sourceKey":"jolly-board-road-side-strips-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Jolly Board Road Side strips","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-28","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"joy-mukherjee-road-k-w-2023-11-06","sourceKey":"joy-mukherjee-road-k-w-2023-11-06","firstSeen":"2026-07-04","state":{"roadName":"Joy Mukherjee Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-06","endDate":"2025-05-31","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jss-road-d-2024-10-01","sourceKey":"jss-road-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"JSS Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-30","lengthM":770,"pqcPercentProgress":75.32,"pqcCompletedOn":null},"changes":[]},
{"id":"juhu-market-road-k-w-2026-02-01","sourceKey":"juhu-market-road-k-w-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Juhu Market Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-02-01","endDate":"2026-05-15","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"juhu-road-link-road-junction-h-w-2023-01-12","sourceKey":"juhu-road-link-road-junction-h-w-2023-01-12","firstSeen":"2026-07-04","state":{"roadName":"Juhu Road - Link Road Junction","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-01-12","endDate":"2024-02-28","lengthM":30,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jvlr-to-hira-panna-market-powai-s-x","sourceKey":"jvlr-to-hira-panna-market-powai-s-x","firstSeen":"2026-07-04","state":{"roadName":"JVLR to Hira Panna Market, Powai","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-15","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jvlr-to-monginis-factory-c-t-s-no-650-3-k-w-2023-12-10","sourceKey":"jvlr-to-monginis-factory-c-t-s-no-650-3-k-w-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"JVLR to Monginis Factory (C.T.S no 650/3 )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-10","endDate":"2024-05-24","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"jwala-mukhi-mandir-marg-l-2024-03-10","sourceKey":"jwala-mukhi-mandir-marg-l-2024-03-10","firstSeen":"2026-07-04","state":{"roadName":"Jwala mukhi mandir marg","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-03-10","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"k-dubash-marg-rampart-row-road-side-strip-a-x","sourceKey":"k-dubash-marg-rampart-row-road-side-strip-a-x","firstSeen":"2026-10-13","state":{"roadName":"K Dubash Marg (Rampart- row Road) (Side Strip)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"k-g-more-road-h-e-2025-11-01","sourceKey":"k-g-more-road-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"K. G. More Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-15","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"k-m-munshi-marg-d-2025-10-01","sourceKey":"k-m-munshi-marg-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"K M Munshi Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":450,"pqcPercentProgress":54,"pqcCompletedOn":null},"changes":[]},
{"id":"k-n-gaikwad-marg-m-w-x","sourceKey":"k-n-gaikwad-marg-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"K. N. Gaikwad Marg","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-05-05","lengthM":800,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"k-r-mhatre-marg-e-2025-11-07","sourceKey":"k-r-mhatre-marg-e-2025-11-07","firstSeen":"2026-07-04","state":{"roadName":"K R Mhatre marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-07","endDate":"2026-11-30","lengthM":240,"pqcPercentProgress":58.33,"pqcCompletedOn":null},"changes":[]},
{"id":"k-v-thakkar-road-t-2026-01-01","sourceKey":"k-v-thakkar-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"K.V. Thakkar Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-04-25","lengthM":45,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kadamwadi-road-h-e-2024-11-01","sourceKey":"kadamwadi-road-h-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kadamwadi Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2026-04-21","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kadamwadi-road-k-e-2025-10-01","sourceKey":"kadamwadi-road-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kadamwadi Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kaddsiddheshwar-road-goregaon-west-p-s-2024-10-10","sourceKey":"kaddsiddheshwar-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Kaddsiddheshwar Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kadeshwari-road-ext-h-w-x","sourceKey":"kadeshwari-road-ext-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Kadeshwari Road Ext","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":159,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kadeshwari-road-h-w-2025-01-14","sourceKey":"kadeshwari-road-h-w-2025-01-14","firstSeen":"2026-07-04","state":{"roadName":"Kadeshwari Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2025-01-14","endDate":"2026-05-10","lengthM":480,"pqcPercentProgress":79.17,"pqcCompletedOn":null},"changes":[]},
{"id":"kajupada-road-from-kale-marg-to-saba-caters-l-x","sourceKey":"kajupada-road-from-kale-marg-to-saba-caters-l-x","firstSeen":"2026-09-29","state":{"roadName":"Kajupada road from kale marg to saba caters","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kalavidyalay-road-malad-w-p-n-2023-10-18","sourceKey":"kalavidyalay-road-malad-w-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Kalavidyalay Road Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2024-05-01","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kalbadevi-road-c-2024-12-01","sourceKey":"kalbadevi-road-c-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Kalbadevi Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-12-01","endDate":"2027-05-10","lengthM":1208,"pqcPercentProgress":57.53,"pqcCompletedOn":null},"changes":[]},
{"id":"kale-marg-from-lbs-to-aklr-l-x","sourceKey":"kale-marg-from-lbs-to-aklr-l-x","firstSeen":"2026-09-29","state":{"roadName":"Kale marg(From LBS to AKLR)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":null,"lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kalina-village-road-h-e-2024-11-08","sourceKey":"kalina-village-road-h-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Kalina Village Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-08","endDate":"2026-04-30","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kalinga-vastu-lane-k-w-2023-11-23","sourceKey":"kalinga-vastu-lane-k-w-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Kalinga & Vastu Lane","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-23","endDate":"2024-05-24","lengthM":598,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kalpana-chawla-road-r-n-2024-10-01","sourceKey":"kalpana-chawla-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kalpana Chawla Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-18","lengthM":580,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kalpataru-road-k-e-2024-11-11","sourceKey":"kalpataru-road-k-e-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Kalpataru Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-11","endDate":"2025-05-20","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kalyan-street-b-2024-11-25","sourceKey":"kalyan-street-b-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Kalyan Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-25","endDate":"2026-04-15","lengthM":315,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kamal-raman-nagar-road-m-e-2025-10-01","sourceKey":"kamal-raman-nagar-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kamal Raman Nagar Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kamathipura-2nd-lane-e-x","sourceKey":"kamathipura-2nd-lane-e-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kamathipura 2nd lane","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-10","lengthM":275,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-28","field":"startDate","from":null,"to":"2026-10-01"}]},
{"id":"kamathipura-4th-lane-e-x","sourceKey":"kamathipura-4th-lane-e-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kamathipura 4th lane","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-10","lengthM":165,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-28","field":"startDate","from":null,"to":"2026-10-01"}]},
{"id":"kambekar-street-b-x","sourceKey":"kambekar-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Kambekar Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":485,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kamgar-nagar-road-l-2023-11-01","sourceKey":"kamgar-nagar-road-l-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kamgar Nagar Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-11-01","endDate":"2025-05-01","lengthM":820,"pqcPercentProgress":62.2,"pqcCompletedOn":null},"changes":[]},
{"id":"kamla-nehru-main-road-and-vasanji-lalji-road-kandivali-w-r-s-2023-11-01","sourceKey":"kamla-nehru-main-road-and-vasanji-lalji-road-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kamla Nehru Main road and Vasanji Lalji Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kamla-vihar-sports-club-road-r-s-2025-12-02","sourceKey":"kamla-vihar-sports-club-road-r-s-2025-12-02","firstSeen":"2026-07-04","state":{"roadName":"Kamla Vihar Sports Club Road","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-12-02","endDate":"2027-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kamlesh-dwivedi-marg-n-2023-10-20","sourceKey":"kamlesh-dwivedi-marg-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"Kamlesh Dwivedi Marg","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-20","endDate":"2024-01-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kamu-baba-road-goregaon-west-p-s-2025-01-01","sourceKey":"kamu-baba-road-goregaon-west-p-s-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Kamu Baba Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":164,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kane-road-h-w-x","sourceKey":"kane-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Kane Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kanoji-angre-marg-k-e-2024-02-26","sourceKey":"kanoji-angre-marg-k-e-2024-02-26","firstSeen":"2026-07-04","state":{"roadName":"Kanoji Angre Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-02-26","endDate":"2025-04-16","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kantilal-sharma-marg-c-x","sourceKey":"kantilal-sharma-marg-c-x","firstSeen":"2026-07-04","state":{"roadName":"Kantilal Sharma Marg","ward":"C","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Kantilal Sharma Marg","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"kapol-school-road-kandivali-w-r-s-2024-10-01","sourceKey":"kapol-school-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kapol School Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"karmaveer-pt-shobhnath-mishra-marg-b-road-a-2025-10-29","sourceKey":"karmaveer-pt-shobhnath-mishra-marg-b-road-a-2025-10-29","firstSeen":"2026-07-04","state":{"roadName":"Karmaveer Pt. Shobhnath Mishra Marg (B Road)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-29","endDate":"2026-05-30","lengthM":298.3,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"karmveer-bhaurao-patil-marg-f-n-x","sourceKey":"karmveer-bhaurao-patil-marg-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Karmveer Bhaurao Patil Marg","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2027-03-30","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kashibai-navrange-marg-d-2025-10-01","sourceKey":"kashibai-navrange-marg-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kashibai Navrange Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":380,"pqcPercentProgress":58.42,"pqcCompletedOn":null},"changes":[]},
{"id":"kastur-park-layout-r-c-x","sourceKey":"kastur-park-layout-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Kastur Park Layout","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":850,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kasturba-road-kandivali-w-r-s-2024-10-01","sourceKey":"kasturba-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kasturba Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":565,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kasturba-road-no-3-r-c-2023-11-01","sourceKey":"kasturba-road-no-3-r-c-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kasturba Road no 3","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":390,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Completed","to":"In Progress"}]},
{"id":"kelipada-road-kandivali-e-r-s-2024-10-01","sourceKey":"kelipada-road-kandivali-e-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kelipada Road, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kelkarwadi-road-from-ghatla-bmc-school-to-w-t-patil-marg-m-w-2024-11-11","sourceKey":"kelkarwadi-road-from-ghatla-bmc-school-to-w-t-patil-marg-m-w-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Kelkarwadi Road from Ghatla BMC School to W. T. Patil Marg","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-11-11","endDate":"2026-02-28","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kena-market-road-m-e-2023-11-01","sourceKey":"kena-market-road-m-e-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kena Market Road","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"keshavji-naik-road-b-2025-10-01","sourceKey":"keshavji-naik-road-b-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Keshavji Naik Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-01","endDate":"2027-03-31","lengthM":440,"pqcPercentProgress":25,"pqcCompletedOn":null},"changes":[]},
{"id":"keshavrao-borkar-marg-e-x","sourceKey":"keshavrao-borkar-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Keshavrao Borkar Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Keshavrao Borkar Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"ketikipada-internal-road-r-n-x","sourceKey":"ketikipada-internal-road-r-n-x","firstSeen":"2026-07-04","state":{"roadName":"Ketikipada Internal Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-03-15","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ketkipada-road-r-n-2024-12-01","sourceKey":"ketkipada-road-r-n-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Ketkipada Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khadak-street-b-x","sourceKey":"khadak-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Khadak Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":123,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khadan-gully-goregaon-west-p-s-2024-10-01","sourceKey":"khadan-gully-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Khadan Gully, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-22","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khairani-road-side-strip-l-2024-11-25","sourceKey":"khairani-road-side-strip-l-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Khairani road side strip","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-11-25","endDate":"2025-12-31","lengthM":1800,"pqcPercentProgress":33.06,"pqcCompletedOn":"2026-01-18"},"changes":[]},
{"id":"khandawala-road-no-02-extension-h-e-x","sourceKey":"khandawala-road-no-02-extension-h-e-x","firstSeen":"2026-10-20","state":{"roadName":"Khandawala Road no. 02 (Extension)","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khanderao-dongri-road-kulupwadi-masjid-r-c-x","sourceKey":"khanderao-dongri-road-kulupwadi-masjid-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Khanderao Dongri Road (Kulupwadi Masjid)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-04-03","lengthM":173,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khandia-street-e-2025-11-14","sourceKey":"khandia-street-e-x","firstSeen":"2026-07-04","state":{"roadName":"Khandia Street","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"In Progress","to":"Not Started"},{"on":"2026-10-28","field":"startDate","from":"2025-11-14","to":null}]},
{"id":"khandubai-desai-road-k-w-2024-10-01","sourceKey":"khandubai-desai-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Khandubai Desai Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-17","lengthM":231,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khandwala-road-no-01-h-e-2024-10-22","sourceKey":"khandwala-road-no-01-h-e-2024-10-22","firstSeen":"2026-07-04","state":{"roadName":"Khandwala road no. 01","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-22","endDate":"2026-02-26","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khandwala-road-no-02-h-e-2024-11-01","sourceKey":"khandwala-road-no-02-h-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Khandwala road no. 02","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2026-04-10","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khandwala-road-p-n-2023-10-02","sourceKey":"khandwala-road-p-n-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Khandwala Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-02","endDate":"2024-05-01","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khar-pipeline-road-h-e-2025-02-03","sourceKey":"khar-pipeline-road-h-e-2025-02-03","firstSeen":"2026-07-04","state":{"roadName":"Khar Pipeline Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-02-03","endDate":"2026-05-31","lengthM":750,"pqcPercentProgress":86.67,"pqcCompletedOn":null},"changes":[]},
{"id":"khareghat-road-f-n-x","sourceKey":"khareghat-road-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Khareghat Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khatau-road-a-x","sourceKey":"khatau-road-a-x","firstSeen":"2026-10-13","state":{"roadName":"Khatau Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":108,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khatushyam-road-p-n-2023-11-20","sourceKey":"khatushyam-road-p-n-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Khatushyam Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-20","endDate":"2024-05-01","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khed-gully-from-sayani-rd-to-jivba-atmaram-rd-g-s-2025-12-01","sourceKey":"khed-gully-from-sayani-rd-to-jivba-atmaram-rd-g-s-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Khed Gully (From Sayani Rd to Jivba Atmaram Rd.)","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-12-01","endDate":"2026-05-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khed-gully-g-n-2025-10-05","sourceKey":"khed-gully-g-n-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Khed Gully","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-05","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":63.04,"pqcCompletedOn":null},"changes":[]},
{"id":"kher-nagar-road-no-1-h-e-2025-11-05","sourceKey":"kher-nagar-road-no-1-h-e-2025-11-05","firstSeen":"2026-07-04","state":{"roadName":"Kher Nagar Road No-1","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-11-05","endDate":"2026-05-31","lengthM":175,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"kher-nagar-road-no-2-h-e-2025-11-01","sourceKey":"kher-nagar-road-no-2-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kher Nagar Road No-2","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-22","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kher-nagar-road-no-7-h-e-2025-11-01","sourceKey":"kher-nagar-road-no-7-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kher Nagar Road No-7","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-30","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khernagar-road-no-03-h-e-2023-12-01","sourceKey":"khernagar-road-no-03-h-e-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Khernagar Road no. 03","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2024-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khernagar-road-no-04-h-e-2025-01-01","sourceKey":"khernagar-road-no-04-h-e-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Khernagar Road no. 04","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-01","endDate":"2026-01-23","lengthM":545,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khernagar-road-no-06-h-e-2023-12-01","sourceKey":"khernagar-road-no-06-h-e-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Khernagar Road no. 06","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2025-06-09","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khernagar-road-no-08-h-e-2024-10-02","sourceKey":"khernagar-road-no-08-h-e-2024-10-02","firstSeen":"2026-07-04","state":{"roadName":"Khernagar Road no. 08","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-02","endDate":"2025-12-21","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kherwadi-maternity-road-h-e-2024-10-01","sourceKey":"kherwadi-maternity-road-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kherwadi Maternity Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-30","lengthM":215,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khetwadi-10th-lane-maulana-shaukat-ali-road-to-khetwadi-main-road-d-2025-11-01","sourceKey":"khetwadi-10th-lane-maulana-shaukat-ali-road-to-khetwadi-main-road-d-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Khetwadi 10th lane (Maulana Shaukat Ali Road to Khetwadi Main Road)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-30","lengthM":350,"pqcPercentProgress":88.86,"pqcCompletedOn":null},"changes":[]},
{"id":"khetwadi-12th-lane-khetwadi-back-road-to-khetwadi-main-road-d-x","sourceKey":"khetwadi-12th-lane-khetwadi-back-road-to-khetwadi-main-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Khetwadi 12th lane (Khetwadi Back Road to Khetwadi Main Road)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-01","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khilachand-road-kandivali-w-r-s-2024-10-01","sourceKey":"khilachand-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Khilachand Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":222,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khimaji-prajapati-marg-pipline-road-to-kale-marg-l-x","sourceKey":"khimaji-prajapati-marg-pipline-road-to-kale-marg-l-x","firstSeen":"2026-07-04","state":{"roadName":"Khimaji prajapati marg (Pipline Road to Kale Marg)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2025-05-01","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khokani-lane-n-2024-12-02","sourceKey":"khokani-lane-n-2024-12-02","firstSeen":"2026-07-04","state":{"roadName":"Khokani Lane","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-12-02","endDate":"2026-05-31","lengthM":318,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khot-gully-g-n-2025-10-01","sourceKey":"khot-gully-g-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Khot Gully","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"khushaldas-parekh-road-f-n-2025-11-01","sourceKey":"khushaldas-parekh-road-f-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Khushaldas Parekh Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":237,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kika-street-c-2025-11-10","sourceKey":"kika-street-c-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"Kika Street","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-10","endDate":"2027-05-10","lengthM":425,"pqcPercentProgress":35.29,"pqcCompletedOn":null},"changes":[]},
{"id":"kisan-kamble-marg-m-w-2026-10-05","sourceKey":"kisan-kamble-marg-m-w-2026-10-05","firstSeen":"2026-07-04","state":{"roadName":"Kisan Kamble Marg","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-10-05","endDate":"2027-03-27","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kisan-nagar-road-t-2026-01-01","sourceKey":"kisan-nagar-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Kisan Nagar Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-04-07","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kishor-kumar-ganguly-road-k-w-2024-10-01","sourceKey":"kishor-kumar-ganguly-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Kishor Kumar Ganguly Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":392,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kishorilal-ramuka-road-goregaon-west-p-s-2024-11-15","sourceKey":"kishorilal-ramuka-road-goregaon-west-p-s-2024-11-15","firstSeen":"2026-07-04","state":{"roadName":"Kishorilal Ramuka Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-11-15","endDate":"2025-05-31","lengthM":226,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kolsa-x-lane-b-x","sourceKey":"kolsa-x-lane-b-x","firstSeen":"2026-07-04","state":{"roadName":"Kolsa X Lane","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kondivita-internal-road-k-e-2024-11-22","sourceKey":"kondivita-internal-road-k-e-2024-11-22","firstSeen":"2026-07-04","state":{"roadName":"Kondivita Internal Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-22","endDate":"2025-12-30","lengthM":237,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kondivita-road-k-e-2024-12-26","sourceKey":"kondivita-road-k-e-2024-12-26","firstSeen":"2026-07-04","state":{"roadName":"Kondivita Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-12-26","endDate":"2026-05-20","lengthM":780,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kotkar-lane-goregaon-east-p-s-2024-10-10","sourceKey":"kotkar-lane-goregaon-east-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Kotkar Lane, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2026-05-31","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"krantiveer-rajguru-road-near-borbhat-lane-d-2024-10-01","sourceKey":"krantiveer-rajguru-road-near-borbhat-lane-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Krantiveer Rajguru Road (Near Borbhat lane)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"krishna-lila-soc-road-goregaon-west-p-s-2024-10-15","sourceKey":"krishna-lila-soc-road-goregaon-west-p-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Krishna Lila Soc road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-15","endDate":"2025-05-31","lengthM":221,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"krishna-vakita-road-goregaon-e-p-s-2024-10-10","sourceKey":"krishna-vakita-road-goregaon-e-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Krishna Vakita Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2024-10-10","endDate":"2026-05-31","lengthM":633,"pqcPercentProgress":38.78,"pqcCompletedOn":null},"changes":[]},
{"id":"kuber-gally-f-s-x","sourceKey":"kuber-gally-f-s-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Kuber Gally","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-02-01","endDate":"2026-05-31","lengthM":65,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-10","field":"startDate","from":null,"to":"2026-02-01"}]},
{"id":"kulupwadi-road-from-we-highway-to-joshi-nivas-hanuman-mandir-r-c-x","sourceKey":"kulupwadi-road-from-we-highway-to-joshi-nivas-hanuman-mandir-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Kulupwadi road from WE Highway to Joshi\r\n Nivas/Hanuman Mandir","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":560,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kumbharwada-road-b-x","sourceKey":"kumbharwada-road-b-x","firstSeen":"2026-07-04","state":{"roadName":"Kumbharwada Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":40,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kunchi-kurve-nagar-road-h-e-2024-11-01","sourceKey":"kunchi-kurve-nagar-road-h-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kunchi Kurve Nagar Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2026-05-30","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kurar-village-road-p-n-2023-10-18","sourceKey":"kurar-village-road-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Kurar Village road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2026-05-31","lengthM":1000,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"kusum-masala-road-goregaon-e-p-s-2023-11-01","sourceKey":"kusum-masala-road-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Kusum Masala Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"l-d-ruparel-marg-d-x","sourceKey":"l-d-ruparel-marg-d-x","firstSeen":"2026-07-04","state":{"roadName":"L D Ruparel Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":800,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"L D Ruparel Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":800,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"l-d-ruparel-x-lane-no-2-d-x","sourceKey":"l-d-ruparel-x-lane-no-2-d-x","firstSeen":"2026-07-04","state":{"roadName":"L. D. Ruparel X lane No. 2","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"l-j-cross-road-no-2-g-n-2025-11-07","sourceKey":"l-j-cross-road-no-2-g-n-2025-11-07","firstSeen":"2026-07-04","state":{"roadName":"L J Cross Road No. 2","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-07","endDate":"2026-05-30","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"l-j-road-from-sena-bhavan-to-mahim-church-g-n-x","sourceKey":"l-j-road-from-sena-bhavan-to-mahim-church-g-n-x","firstSeen":"2026-10-29","state":{"roadName":"L.J. Road from sena bhavan to Mahim church","ward":"G/N","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":null,"endDate":null,"lengthM":1700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"l-n-jadhav-marg-b-2025-12-01","sourceKey":"l-n-jadhav-marg-b-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"L.N.Jadhav Marg","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-12-01","endDate":"2026-04-20","lengthM":176,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"l-t-road-dahisar-west-r-n-2024-01-24","sourceKey":"l-t-road-dahisar-west-r-n-2024-01-24","firstSeen":"2026-07-04","state":{"roadName":"L.T.Road, Dahisar (west)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-01-24","endDate":"2025-05-31","lengthM":1075,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"l-t-road-no-2-p-s-2026-02-16","sourceKey":"l-t-road-no-2-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"L.T. Road No.2","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":206,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"laburnum-marg-d-2025-10-03","sourceKey":"laburnum-marg-d-2025-10-03","firstSeen":"2026-07-04","state":{"roadName":"Laburnum Marg","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-03","endDate":"2026-04-15","lengthM":370,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lady-fatima-marg-r-c-2024-10-10","sourceKey":"lady-fatima-marg-r-c-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Lady Fatima Marg","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":335,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lady-laxmibai-jagmohandas-marg-nepean-sea-road-d-2024-10-01","sourceKey":"lady-laxmibai-jagmohandas-marg-nepean-sea-road-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lady Laxmibai Jagmohandas Marg (Nepean sea Road)","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-10-01","endDate":"2027-05-10","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-10","field":"startDate","from":"2024-10-01","to":null},{"on":"2026-10-16","field":"status","from":"Deleted","to":"Completed"},{"on":"2026-10-16","field":"startDate","from":null,"to":"2024-10-01"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"Lady Laxmibai Jagmohandas Marg (Nepean sea Road)","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-10-01","endDate":"2027-05-10","lengthM":1950,"pqcPercentProgress":5,"pqcCompletedOn":null}}],"aliases":["lady-laxmibai-jagmohandas-marg-nepean-sea-road-d-x"]},
{"id":"lady-pochkhanwala-path-d-2024-10-01","sourceKey":"lady-pochkhanwala-path-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lady Pochkhanwala Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lahuji-ustad-road-l-2025-10-01","sourceKey":"lahuji-ustad-road-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lahuji Ustad Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":450,"pqcPercentProgress":22.22,"pqcCompletedOn":null},"changes":[]},
{"id":"lajpatrai-road-k-w-2024-10-01","sourceKey":"lajpatrai-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lajpatrai Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-30","lengthM":505,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lal-dongar-road-from-v-n-purav-marg-to-altavista-bldg-m-w-2023-11-20","sourceKey":"lal-dongar-road-from-v-n-purav-marg-to-altavista-bldg-m-w-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Lal Dongar Road from V. N. Purav Marg to Altavista Bldg.","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-11-20","endDate":"2026-11-30","lengthM":300,"pqcPercentProgress":86.67,"pqcCompletedOn":null},"changes":[]},
{"id":"lala-nigam-road-a-x","sourceKey":"lala-nigam-road-a-x","firstSeen":"2026-07-04","state":{"roadName":"Lala Nigam Road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":null,"lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lallubhai-compound-to-sathe-nagar-road-m-e-2025-10-01","sourceKey":"lallubhai-compound-to-sathe-nagar-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lallubhai Compound to Sathe Nagar Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"lalmati-road-goregaon-west-p-s-2024-10-15","sourceKey":"lalmati-road-goregaon-west-p-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Lalmati Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-15","endDate":"2025-05-31","lengthM":234,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lalwadi-road-m-w-2025-11-28","sourceKey":"lalwadi-road-m-w-2025-11-28","firstSeen":"2026-07-04","state":{"roadName":"Lalwadi Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-11-28","endDate":"2027-03-05","lengthM":190,"pqcPercentProgress":21.05,"pqcCompletedOn":null},"changes":[]},
{"id":"lane-opposite-canara-bank-ghatkopa-east-n-x","sourceKey":"lane-opposite-canara-bank-ghatkopa-east-n-x","firstSeen":"2026-07-04","state":{"roadName":"Lane Opposite Canara Bank, Ghatkopa (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"laxman-bhandari-marg-r-c-2025-01-07","sourceKey":"laxman-bhandari-marg-r-c-2025-01-07","firstSeen":"2026-07-04","state":{"roadName":"Laxman Bhandari Marg","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-01-07","endDate":"2025-05-31","lengthM":276,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"laxman-kamble-road-goregaon-west-p-s-2025-10-05","sourceKey":"laxman-kamble-road-goregaon-west-p-s-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Laxman Kamble Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-05","endDate":"2026-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"laxman-pitkar-marg-t-2026-01-01","sourceKey":"laxman-pitkar-marg-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Laxman Pitkar Marg","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-03-31","lengthM":76,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"laxmi-narayan-mandir-road-sai-baba-marg-to-anjali-medical-l-x","sourceKey":"laxmi-narayan-mandir-road-sai-baba-marg-to-anjali-medical-l-x","firstSeen":"2026-09-29","state":{"roadName":"Laxmi narayan mandir road(sai baba marg to anjali medical)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":null,"lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"}]},
{"id":"laxmi-narayan-road-f-north-f-n-x","sourceKey":"laxmi-narayan-road-f-north-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Laxmi Narayan Road ( F North)","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"laxmi-narayan-road-r-c-2025-10-01","sourceKey":"laxmi-narayan-road-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Laxmi Narayan Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-01-04","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"laxmibai-lad-road-from-bharucha-road-to-y-r-tawade-road-dahisar-e-r-n-2023-11-23","sourceKey":"laxmibai-lad-road-from-bharucha-road-to-y-r-tawade-road-dahisar-e-r-n-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Laxmibai Lad Road from Bharucha Road to Y.R.Tawade Road, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-23","endDate":"2024-11-30","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"legend-building-road-r-n-2024-10-01","sourceKey":"legend-building-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Legend Building Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":164,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lelewadi-road-from-vitthal-mandir-to-sra-building-k-e-2024-12-02","sourceKey":"lelewadi-road-from-vitthal-mandir-to-sra-building-k-e-2024-12-02","firstSeen":"2026-07-04","state":{"roadName":"Lelewadi Road from Vitthal Mandir to SRA Building","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-12-02","endDate":"2025-03-21","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-cross-road-no-2-part-a-p-n-2024-10-14","sourceKey":"liberty-garden-cross-road-no-2-part-a-p-n-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Cross Road No 2 Part A","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-14","endDate":"2025-05-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-cross-road-no-2-part-b-p-n-2024-10-14","sourceKey":"liberty-garden-cross-road-no-2-part-b-p-n-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Cross Road No 2 Part B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-14","endDate":"2025-05-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-cross-road-no-2-part-c-p-n-2024-10-14","sourceKey":"liberty-garden-cross-road-no-2-part-c-p-n-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Cross Road No 2 Part C","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-14","endDate":"2025-05-31","lengthM":62,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-cross-road-no-3-and-4-part-a-p-n-2024-10-15","sourceKey":"liberty-garden-cross-road-no-3-and-4-part-a-p-n-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Cross Road No 3 and 4 Part A","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-15","endDate":"2025-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-cross-road-no-3-and-4-part-b-p-n-2024-10-01","sourceKey":"liberty-garden-cross-road-no-3-and-4-part-b-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Cross Road No 3 and 4 Part B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-15","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-internal-layout-cross-rd-no-2-and-3-part-a-p-n-2024-11-01","sourceKey":"liberty-garden-internal-layout-cross-rd-no-2-and-3-part-a-p-n-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Internal Layout cross rd no. 2 and 3 PART A","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-25","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-internal-layout-cross-rd-no-2-and-3-part-b-p-n-2025-01-01","sourceKey":"liberty-garden-internal-layout-cross-rd-no-2-and-3-part-b-p-n-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Internal Layout cross rd no. 2 and 3 PART B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-25","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-internal-layout-cross-rd-no-2-and-3-part-c-p-n-2025-01-01","sourceKey":"liberty-garden-internal-layout-cross-rd-no-2-and-3-part-c-p-n-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Internal Layout cross rd no. 2 and 3 PART C","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-25","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-road-1-malad-w-p-n-2024-09-30","sourceKey":"liberty-garden-road-1-malad-w-p-n-2024-09-30","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Road 1,Malad (W)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-09-30","endDate":"2026-02-07","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-road-3-malad-w-p-n-2024-10-01","sourceKey":"liberty-garden-road-3-malad-w-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Road 3,Malad (W)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-04-30","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-road-no-2-malad-w-p-n-2025-11-01","sourceKey":"liberty-garden-road-no-2-malad-w-p-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Road No.2 Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"liberty-garden-road-no-4-malad-w-p-n-2025-11-01","sourceKey":"liberty-garden-road-no-4-malad-w-p-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Liberty Garden Road No.4 Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lig-colony-road-building-no-13-vinoba-bhave-nagar-road-to-principal-tasduk-hussain-marg-l-2024-01-10","sourceKey":"lig-colony-road-building-no-13-vinoba-bhave-nagar-road-to-principal-tasduk-hussain-marg-l-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"LIG Colony road building no 13 ( Vinoba Bhave nagar road to principal tasduk Hussain marg)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-01-10","endDate":"2025-03-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lig-colony-road-building-no-31-vinoba-bhave-nagar-road-to-principal-tasduk-hussain-marg-l-2024-01-10","sourceKey":"lig-colony-road-building-no-31-vinoba-bhave-nagar-road-to-principal-tasduk-hussain-marg-l-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"LIG Colony road building no 31 ( Vinoba Bhave nagar road to principal tasduk Hussain marg)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-01-10","endDate":"2025-03-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"link-road-in-andheri-west-adarsh-to-juhu-circle-k-w-2023-10-25","sourceKey":"link-road-in-andheri-west-adarsh-to-juhu-circle-k-w-2023-10-25","firstSeen":"2026-07-04","state":{"roadName":"Link Road in Andheri ( West ) Adarsh to Juhu Circle","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2023-10-25","endDate":"2026-05-31","lengthM":3290,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"link-road-in-andheri-west-oshiwara-to-adarsh-k-w-2023-10-25","sourceKey":"link-road-in-andheri-west-oshiwara-to-adarsh-k-w-2023-10-25","firstSeen":"2026-07-04","state":{"roadName":"Link Road in Andheri ( West ) Oshiwara to Adarsh","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-25","endDate":"2026-05-31","lengthM":2220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"link-road-shimpoli-to-mahaveer-nagar-borivali-west-r-c-2023-12-13","sourceKey":"link-road-shimpoli-to-mahaveer-nagar-borivali-west-r-c-2023-12-13","firstSeen":"2026-07-04","state":{"roadName":"LINK ROAD SHIMPOLI TO MAHAVEER NAGAR ,\r\n Borivali(West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-13","endDate":"2025-05-31","lengthM":1050,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"link-road-side-strips-goregaon-w-p-s-2023-11-20","sourceKey":"link-road-side-strips-goregaon-w-p-s-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Link Road Side Strips, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-20","endDate":"2026-05-31","lengthM":2122,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"link-road-south-side-service-road-r-n-2024-10-10","sourceKey":"link-road-south-side-service-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Link Road South Side Service Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-03-31","lengthM":510,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lions-soul-road-k-w-2023-03-25","sourceKey":"lions-soul-road-k-w-2023-03-25","firstSeen":"2026-07-04","state":{"roadName":"lions soul road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-03-25","endDate":"2024-05-24","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lohiya-nagar-road-a-k-w-2025-10-01","sourceKey":"lohiya-nagar-road-a-k-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lohiya Nagar Road-A","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":245,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lok-rounak-road-marol-k-e-2023-11-17","sourceKey":"lok-rounak-road-marol-k-e-2023-11-17","firstSeen":"2026-07-04","state":{"roadName":"Lok Rounak Road Marol","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-17","endDate":"2024-10-30","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lokhandwala-cross-road-01-k-w-2024-10-01","sourceKey":"lokhandwala-cross-road-01-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lokhandwala Cross Road 01","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":550,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"lokhandwala-cross-road-no-02-k-w-2024-10-01","sourceKey":"lokhandwala-cross-road-no-02-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lokhandwala Cross Road no.02","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":646,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lokhandwala-cross-road-no-03-k-w-2024-10-01","sourceKey":"lokhandwala-cross-road-no-03-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Lokhandwala Cross Road no.03","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":782,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lokmanya-tilak-marg-b-x","sourceKey":"lokmanya-tilak-marg-b-x","firstSeen":"2026-07-04","state":{"roadName":"Lokmanya Tilak Marg","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lokmanya-tilak-marg-patel-nagar-h-e-2025-12-20","sourceKey":"lokmanya-tilak-marg-patel-nagar-h-e-2025-12-20","firstSeen":"2026-07-04","state":{"roadName":"Lokmanya Tilak Marg (Patel Nagar)","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-20","endDate":"2026-03-16","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lourdes-colony-road-p-n-2026-01-13","sourceKey":"lourdes-colony-road-p-n-2026-01-13","firstSeen":"2026-07-04","state":{"roadName":"Lourdes Colony Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-01-13","endDate":"2026-05-31","lengthM":440,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lower-level-e-moses-road-g-s-x","sourceKey":"lower-level-e-moses-road-g-s-x","firstSeen":"2026-07-04","state":{"roadName":"Lower Level E Moses Road","ward":"G/S","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-03-03","lengthM":570,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"loyalka-compound-road-l-2024-12-09","sourceKey":"loyalka-compound-road-l-2024-12-09","firstSeen":"2026-07-04","state":{"roadName":"Loyalka Compound Road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-09","endDate":"2025-05-31","lengthM":508,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ls-raheja-marg-h-w-2025-01-10","sourceKey":"ls-raheja-marg-h-w-2025-01-10","firstSeen":"2026-07-04","state":{"roadName":"LS Raheja Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-10","endDate":"2026-03-01","lengthM":153,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lt-road-no-1-goregaon-west-p-s-2024-10-10","sourceKey":"lt-road-no-1-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"LT Road no. 1, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"lt-road-no-4-goregaon-west-p-s-2024-10-10","sourceKey":"lt-road-no-4-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"LT Road no. 4, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":218,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-d-keni-marg-nahur-e-s-2026-02-15","sourceKey":"m-d-keni-marg-nahur-e-s-2026-02-15","firstSeen":"2026-07-04","state":{"roadName":"M.D.Keni marg, Nahur (E),","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-02-15","endDate":"2027-05-15","lengthM":190,"pqcPercentProgress":47.37,"pqcCompletedOn":null},"changes":[]},
{"id":"m-e-sarang-street-b-x","sourceKey":"m-e-sarang-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"M.E.Sarang Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":252,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-g-cross-rd-4-kandivali-w-r-s-2026-10-01","sourceKey":"m-g-cross-rd-4-kandivali-w-r-s-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"M.G. Cross Rd-4, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":445,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-g-cross-road-no-3-from-mathuradas-road-to-m-g-road-kandivali-w-r-s-2023-11-25","sourceKey":"m-g-cross-road-no-3-from-mathuradas-road-to-m-g-road-kandivali-w-r-s-2023-11-25","firstSeen":"2026-07-04","state":{"roadName":"M.G. Cross Road No. 3 from Mathuradas road to M.G. Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-25","endDate":"2024-05-31","lengthM":242,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-g-road-h-w-x","sourceKey":"m-g-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"M G Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-g-road-n-2026-01-01","sourceKey":"m-g-road-n-x","firstSeen":"2026-07-04","state":{"roadName":"M.G. Road","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2027-04-30","lengthM":443,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-19","field":"status","from":"In Progress","to":"On Hold"},{"on":"2026-10-19","field":"startDate","from":"2026-01-01","to":null}]},
{"id":"m-g-road-side-strip-k-e-2025-10-30","sourceKey":"m-g-road-side-strip-k-e-2025-10-30","firstSeen":"2026-07-04","state":{"roadName":"M.G.Road side strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-30","endDate":"2026-05-18","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-g-road-sidestrip-2-k-e-x","sourceKey":"m-g-road-sidestrip-2-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"M G Road Sidestrip-2","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-n-road-l-2024-12-16","sourceKey":"m-n-road-l-2024-12-16","firstSeen":"2026-07-04","state":{"roadName":"M.N.Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-12-16","endDate":"2025-10-31","lengthM":620,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-p-vaidya-marg-n-2024-11-07","sourceKey":"m-p-vaidya-marg-n-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"M.P. Vaidya Marg","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-11-07","endDate":"2027-02-28","lengthM":375,"pqcPercentProgress":78.67,"pqcCompletedOn":null},"changes":[]},
{"id":"m-s-bldg-internal-road-from-bjp-office-to-bldg-no-19-m-w-2026-02-01","sourceKey":"m-s-bldg-internal-road-from-bjp-office-to-bldg-no-19-m-w-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"M. S. Bldg. Internal Road from BJP Office to Bldg. No. 19","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-02-01","endDate":"2026-05-20","lengthM":76,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-s-bldg-internal-road-from-bldg-no-25-to-bldg-no-27-m-w-2025-11-01","sourceKey":"m-s-bldg-internal-road-from-bldg-no-25-to-bldg-no-27-m-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"M. S. Bldg. Internal Road From Bldg. No. 25 to Bldg. No. 27","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-01","endDate":"2026-02-16","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"m-s-bldg-internal-road-from-bldg-no-31-to-bldg-no-33-m-w-2026-03-01","sourceKey":"m-s-bldg-internal-road-from-bldg-no-31-to-bldg-no-33-m-w-2026-03-01","firstSeen":"2026-07-04","state":{"roadName":"M. S. Bldg. Internal Road from Bldg. No. 31 to Bldg. No. 33","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-03-01","endDate":"2026-11-25","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"maa-naansharda-marg-k-e-2024-10-01","sourceKey":"maa-naansharda-marg-k-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Maa Naansharda Marg","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-22","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"madh-market-road-malad-west-p-n-x","sourceKey":"madh-market-road-malad-west-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Madh market Road , Malad (West)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Deleted","startDate":null,"endDate":null,"lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"madhavrao-gangan-marg-e-x","sourceKey":"madhavrao-gangan-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Madhavrao gangan Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"madhuban-society-road-from-mtnl-to-madhuban-society-dahisar-e-r-n-2023-11-23","sourceKey":"madhuban-society-road-from-mtnl-to-madhuban-society-dahisar-e-r-n-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Madhuban Society Road from MTNL to Madhuban Society, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-23","endDate":"2024-10-31","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"madhukar-rao-sarpodar-road-k-w-2023-11-23","sourceKey":"madhukar-rao-sarpodar-road-k-w-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Madhukar rao sarpodar Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-23","endDate":"2024-05-24","lengthM":638,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"madhur-society-road-goregaon-west-p-s-2024-10-01","sourceKey":"madhur-society-road-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Madhur Society Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-01-02","lengthM":261,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"madona-colony-road-r-n-2025-10-01","sourceKey":"madona-colony-road-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Madona Colony Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":388,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahadeo-palav-marg-ll-north-f-s-2024-11-21","sourceKey":"mahadeo-palav-marg-ll-north-f-s-2024-11-21","firstSeen":"2026-07-04","state":{"roadName":"Mahadeo Palav Marg,LL (North)","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-21","endDate":"2026-05-03","lengthM":302,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahadev-desai-road-kandivali-e-r-s-2025-10-01","sourceKey":"mahadev-desai-road-kandivali-e-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mahadev desai Road, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":585,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahadev-desai-road-r-c-2025-10-01","sourceKey":"mahadev-desai-road-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mahadev Desai Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":266,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahadev-palav-marg-g-s-x","sourceKey":"mahadev-palav-marg-g-s-x","firstSeen":"2026-07-04","state":{"roadName":"Mahadev Palav marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-20","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahakali-caves-road-k-e-2024-02-27","sourceKey":"mahakali-caves-road-k-e-2024-02-27","firstSeen":"2026-07-04","state":{"roadName":"Mahakali Caves Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-02-27","endDate":"2025-05-31","lengthM":675,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahakali-mandir-road-goregaon-w-p-s-2023-05-01","sourceKey":"mahakali-mandir-road-goregaon-w-p-s-2023-05-01","firstSeen":"2026-07-04","state":{"roadName":"Mahakali Mandir Road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-05-01","endDate":"2024-05-24","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahakavi-kalidas-road-t-2023-04-08","sourceKey":"mahakavi-kalidas-road-t-2023-04-08","firstSeen":"2026-07-04","state":{"roadName":"Mahakavi Kalidas road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-04-08","endDate":"2024-05-01","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahalaxmi-mandir-road-h-e-2023-04-27","sourceKey":"mahalaxmi-mandir-road-h-e-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"Mahalaxmi Mandir Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2024-02-28","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahapalika-sabhagruh-marg-a-x","sourceKey":"mahapalika-sabhagruh-marg-a-x","firstSeen":"2026-07-04","state":{"roadName":"Mahapalika Sabhagruh Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":null,"lengthM":127,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"maharashtra-nagar-cross-road-borivali-east-r-c-2023-11-24","sourceKey":"maharashtra-nagar-cross-road-borivali-east-r-c-2023-11-24","firstSeen":"2026-07-04","state":{"roadName":"Maharashtra Nagar Cross Road Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-24","endDate":"2024-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"maharashtra-nagar-road-bhandup-w-s-x","sourceKey":"maharashtra-nagar-road-bhandup-w-s-x","firstSeen":"2026-07-04","state":{"roadName":"Maharashtra nagar road Bhandup W","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Maharashtra nagar road Bhandup W","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2026-12-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"maharashtra-nagar-road-m-e-2025-10-01","sourceKey":"maharashtra-nagar-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Maharashtra Nagar Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":1675,"pqcPercentProgress":43.58,"pqcCompletedOn":null},"changes":[]},
{"id":"maharashtra-nagar-road-no-1-borivali-east-r-c-2023-12-15","sourceKey":"maharashtra-nagar-road-no-1-borivali-east-r-c-2023-12-15","firstSeen":"2026-07-04","state":{"roadName":"Maharashtra Nagar Road no. 1 Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-15","endDate":"2025-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"maharashtra-nagar-road-no-2-borivali-east-r-c-2023-11-24","sourceKey":"maharashtra-nagar-road-no-2-borivali-east-r-c-2023-11-24","firstSeen":"2026-07-04","state":{"roadName":"Maharashtra Nagar Road no. 2, Borivali(East)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-24","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"maharashtra-seva-sangh-t-2026-01-01","sourceKey":"maharashtra-seva-sangh-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Maharashtra Seva Sangh","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-05-11","lengthM":115,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"maharastra-nagar-road-borivali-west-r-c-2024-10-01","sourceKey":"maharastra-nagar-road-borivali-west-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Maharastra Nagar Road (Borivali West)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":235,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahatma-gandhi-vidya-marg-h-e-2026-02-01","sourceKey":"mahatma-gandhi-vidya-marg-h-e-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Mahatma Gandhi Vidya Marg","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-02-01","endDate":"2027-05-30","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahatma-phule-road-f-s-2024-11-18","sourceKey":"mahatma-phule-road-f-s-2024-11-18","firstSeen":"2026-07-04","state":{"roadName":"Mahatma Phule Road","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-18","endDate":"2026-05-31","lengthM":630,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"mahatma-society-road-h-e-2026-02-20","sourceKey":"mahatma-society-road-h-e-2026-02-20","firstSeen":"2026-07-04","state":{"roadName":"Mahatma Society Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-02-20","endDate":"2026-04-23","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahavir-platinum-to-g-m-link-road-m-e-2024-02-02","sourceKey":"mahavir-platinum-to-g-m-link-road-m-e-2024-02-02","firstSeen":"2026-07-04","state":{"roadName":"Mahavir platinum to G.M.link road","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-02-02","endDate":"2026-05-31","lengthM":455,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahila-ashram-road-f-n-2025-10-15","sourceKey":"mahila-ashram-road-f-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Mahila Ashram road.","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-15","endDate":"2026-05-31","lengthM":177,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mahul-jetty-road-m-w-2026-10-15","sourceKey":"mahul-jetty-road-m-w-2026-10-15","firstSeen":"2026-07-04","state":{"roadName":"Mahul Jetty Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-10-15","endDate":"2027-02-10","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"main-avenue-road-h-w-2024-12-01","sourceKey":"main-avenue-road-h-w-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Main Avenue Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-12-01","endDate":"2026-05-10","lengthM":930,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"main-panjrapole-road-c-2024-11-23","sourceKey":"main-panjrapole-road-c-2024-11-23","firstSeen":"2026-07-04","state":{"roadName":"Main Panjrapole Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-23","endDate":"2026-01-14","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"main-rokadia-lane-r-c-2024-10-01","sourceKey":"main-rokadia-lane-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Main Rokadia Lane","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"malik-liyakay-road-from-lbs-to-nm-road-l-2025-01-01","sourceKey":"malik-liyakay-road-from-lbs-to-nm-road-l-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Malik Liyakay Road (from LBS to NM road)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"malvani-gaon-patharewadi-to-pachkalshi-cemetary-road-malad-w-p-n-2024-04-15","sourceKey":"malvani-gaon-patharewadi-to-pachkalshi-cemetary-road-malad-w-p-n-2024-04-15","firstSeen":"2026-07-04","state":{"roadName":"Malvani Gaon Patharewadi to Pachkalshi Cemetary Road, Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-04-15","endDate":"2026-05-31","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"malviya-cross-road-k-e-2025-10-30","sourceKey":"malviya-cross-road-k-e-2025-10-30","firstSeen":"2026-07-04","state":{"roadName":"Malviya Cross Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-30","endDate":"2026-04-30","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mama-parmanand-marg-d-x","sourceKey":"mama-parmanand-marg-d-x","firstSeen":"2026-07-04","state":{"roadName":"Mama Parmanand Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"On Hold","to":"Deleted"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"Mama Parmanand Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"On Hold","startDate":null,"endDate":"2026-05-31","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"mamledar-wadi-road-no-2-p-n-2024-10-14","sourceKey":"mamledar-wadi-road-no-2-p-n-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Mamledar Wadi Road No 2","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-14","endDate":"2025-05-31","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mamledar-wadi-road-no-4-p-n-2024-10-14","sourceKey":"mamledar-wadi-road-no-4-p-n-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Mamledar Wadi Road No 4","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-14","endDate":"2025-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mamletdarwadi-main-road-p-n-2026-01-13","sourceKey":"mamletdarwadi-main-road-p-n-2026-01-13","firstSeen":"2026-07-04","state":{"roadName":"Mamletdarwadi Main Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-01-13","endDate":"2026-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mamletdarwadi-road-no-1-malad-w-p-n-x","sourceKey":"mamletdarwadi-road-no-1-malad-w-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Mamletdarwadi Road no.1 Malad (W).","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Deleted","startDate":null,"endDate":null,"lengthM":205,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mamletdarwadi-road-no-1-p-n-2026-01-13","sourceKey":"mamletdarwadi-road-no-1-p-n-2026-01-13","firstSeen":"2026-07-04","state":{"roadName":"Mamletdarwadi Road No.1","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-01-13","endDate":"2026-05-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mamletdarwadi-road-no-3-p-n-2026-01-13","sourceKey":"mamletdarwadi-road-no-3-p-n-2026-01-13","firstSeen":"2026-07-04","state":{"roadName":"Mamletdarwadi Road No.3","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-01-13","endDate":"2026-05-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manaji-rajoji-road-e-2026-04-20","sourceKey":"manaji-rajoji-road-e-2026-04-20","firstSeen":"2026-07-04","state":{"roadName":"Manaji Rajoji Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-04-20","endDate":"2026-05-31","lengthM":415,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manav-mandir-road-d-x","sourceKey":"manav-mandir-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Manav Mandir Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-22","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manav-mandir-road-goregaon-w-p-s-2024-01-01","sourceKey":"manav-mandir-road-goregaon-w-p-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Manav Mandir Road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-24","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manavstal-road-lagoon-road-part-a-p-n-2025-02-01","sourceKey":"manavstal-road-lagoon-road-part-a-p-n-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Manavstal road Lagoon road PART A","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":101,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manavstal-road-lagoon-road-part-b-p-n-2024-10-01","sourceKey":"manavstal-road-lagoon-road-part-b-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Manavstal road Lagoon road PART B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manchu-bhai-road-malad-east-p-n-2023-10-26","sourceKey":"manchu-bhai-road-malad-east-p-n-2023-10-26","firstSeen":"2026-07-04","state":{"roadName":"Manchu bhai Road, Malad (East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-26","endDate":"2024-05-01","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mandala-village-road-m-e-x","sourceKey":"mandala-village-road-m-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mandala Village Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-01","endDate":"2027-05-31","lengthM":475,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"On Hold","to":"Completed"},{"on":"2026-10-14","field":"startDate","from":null,"to":"2024-10-01"}]},
{"id":"mangaldas-road-c-x","sourceKey":"mangaldas-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"Mangaldas Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-10","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mangeshrao-sawant-road-r-n-2024-10-01","sourceKey":"mangeshrao-sawant-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mangeshrao Sawant Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-27","lengthM":71,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manikrao-lotlikar-road-f-n-2025-11-01","sourceKey":"manikrao-lotlikar-road-f-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Manikrao Lotlikar Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-01","endDate":"2027-05-31","lengthM":472,"pqcPercentProgress":45.55,"pqcCompletedOn":null},"changes":[]},
{"id":"manipada-road-h-e-2023-04-27","sourceKey":"manipada-road-h-e-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"Manipada Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2025-04-15","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manjrekar-lane-g-s-2025-10-20","sourceKey":"manjrekar-lane-g-s-2025-10-20","firstSeen":"2026-07-04","state":{"roadName":"Manjrekar Lane","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-20","endDate":"2027-03-31","lengthM":406,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manjrekar-wadi-road-k-e-2025-01-02","sourceKey":"manjrekar-wadi-road-k-e-2025-01-02","firstSeen":"2026-07-04","state":{"roadName":"Manjrekar wadi Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-02","endDate":"2025-05-24","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"manmala-tank-road-g-n-2024-12-07","sourceKey":"manmala-tank-road-g-n-2024-12-07","firstSeen":"2026-07-04","state":{"roadName":"Manmala Tank Road","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-12-07","endDate":"2026-03-31","lengthM":560,"pqcPercentProgress":56.25,"pqcCompletedOn":null},"changes":[]},
{"id":"maratha-colony-road-r-n-2024-10-10","sourceKey":"maratha-colony-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Maratha colony road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":302,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marathoan-galaxy-road-t-2024-12-21","sourceKey":"marathoan-galaxy-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Marathoan Galaxy Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2026-02-20","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marham-abdul-latif-dadamiyyan-marg-l-2024-11-25","sourceKey":"marham-abdul-latif-dadamiyyan-marg-l-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Marham Abdul latif Dadamiyyan Marg","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-11-25","endDate":"2025-05-24","lengthM":56,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marian-colony-road-r-n-2024-10-01","sourceKey":"marian-colony-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Marian Colony Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":153,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marina-enclave-road-p-n-2023-05-02","sourceKey":"marina-enclave-road-p-n-2023-05-02","firstSeen":"2026-07-04","state":{"roadName":"Marina Enclave Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-05-02","endDate":"2024-01-01","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marine-lines-1st-cross-lane-a-x","sourceKey":"marine-lines-1st-cross-lane-a-x","firstSeen":"2026-07-04","state":{"roadName":"Marine Lines 1st Cross lane","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":114,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marol-maroshi-road-k-e-2025-10-01","sourceKey":"marol-maroshi-road-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Marol Maroshi Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":1130,"pqcPercentProgress":53.1,"pqcCompletedOn":null},"changes":[]},
{"id":"marol-village-road-k-e-2025-02-01","sourceKey":"marol-village-road-k-e-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Marol Village Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-02-01","endDate":"2026-01-15","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marthoma-church-road-m-w-2025-10-13","sourceKey":"marthoma-church-road-m-w-2025-10-13","firstSeen":"2026-07-04","state":{"roadName":"Marthoma Church Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-13","endDate":"2026-01-31","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"maru-aai-mandir-marg-h-w-2026-10-05","sourceKey":"maru-aai-mandir-marg-h-w-2026-10-05","firstSeen":"2026-07-04","state":{"roadName":"Maru Aai Mandir Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-10-05","endDate":"2027-03-19","lengthM":273,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marubai-gaondevi-mandir-road-f-n-2025-11-03","sourceKey":"marubai-gaondevi-mandir-road-f-n-2025-11-03","firstSeen":"2026-07-04","state":{"roadName":"Marubai Gaondevi Mandir Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-03","endDate":"2027-01-31","lengthM":214,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marvali-village-road-m-w-2025-10-15","sourceKey":"marvali-village-road-m-w-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Marvali Village Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-15","endDate":"2026-05-17","lengthM":316,"pqcPercentProgress":94.94,"pqcCompletedOn":null},"changes":[]},
{"id":"marve-road-from-mith-chowky-to-malwani-composite-cemetary-p-n-2024-02-10","sourceKey":"marve-road-from-mith-chowky-to-malwani-composite-cemetary-p-n-2024-02-10","firstSeen":"2026-07-04","state":{"roadName":"Marve Road from Mith Chowky to Malwani Composite cemetary","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-10","endDate":"2026-05-31","lengthM":565,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marve-road-side-strips-from-nazarine-appt-to-t-junction-p-n-x","sourceKey":"marve-road-side-strips-from-nazarine-appt-to-t-junction-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Marve road side strips from Nazarine Appt. to T Junction","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":1200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"marwadi-chawl-road-l-2024-11-18","sourceKey":"marwadi-chawl-road-l-2024-11-18","firstSeen":"2026-07-04","state":{"roadName":"Marwadi Chawl Road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-18","endDate":"2025-05-31","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"masjid-gully-to-seven-bunglow-k-w-2024-10-01","sourceKey":"masjid-gully-to-seven-bunglow-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Masjid Gully to Seven bunglow","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"masjid-siding-low-level-road-b-2025-02-15","sourceKey":"masjid-siding-low-level-road-b-2025-02-15","firstSeen":"2026-07-04","state":{"roadName":"Masjid Siding Low Level Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-02-15","endDate":"2025-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"masjid-siding-road-parallel-to-y-m-road-b-2024-11-07","sourceKey":"masjid-siding-road-parallel-to-y-m-road-b-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"Masjid Siding Road (Parallel to Y.M.Road)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-07","endDate":"2025-01-31","lengthM":199,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"masjid-yasin-marg-k-w-2024-10-01","sourceKey":"masjid-yasin-marg-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Masjid Yasin Marg","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":93,"pqcPercentProgress":5.38,"pqcCompletedOn":null},"changes":[]},
{"id":"mastan-tank-lane-e-x","sourceKey":"mastan-tank-lane-e-x","firstSeen":"2026-07-04","state":{"roadName":"Mastan Tank Lane","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-10","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"masurashram-road-goregaon-east-p-s-2024-10-01","sourceKey":"masurashram-road-goregaon-east-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Masurashram Road, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":294,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mata-ramabai-ambedkar-marg-a-x","sourceKey":"mata-ramabai-ambedkar-marg-a-x","firstSeen":"2026-07-04","state":{"roadName":"Mata Ramabai Ambedkar Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-02-10","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-18","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-09-18","before":{"roadName":"Mata Ramabai Ambedkar Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-02-10","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"mata-ramabai-road-side-strips-k-w-x","sourceKey":"mata-ramabai-road-side-strips-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Mata Ramabai Road ( Side strips )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"matang-rushi-nagar-road-m-e-2026-01-01","sourceKey":"matang-rushi-nagar-road-m-e-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Matang Rushi Nagar road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2027-05-31","lengthM":362,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"mathew-road-d-x","sourceKey":"mathew-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Mathew Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mathuradas-road-no-1-kandivali-w-r-s-2024-01-15","sourceKey":"mathuradas-road-no-1-kandivali-w-r-s-2024-01-15","firstSeen":"2026-07-04","state":{"roadName":"Mathuradas Road No.1, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-01-15","endDate":"2024-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"matoshree-ramabai-ambedkar-road-p-n-2024-09-30","sourceKey":"matoshree-ramabai-ambedkar-road-p-n-2024-09-30","firstSeen":"2026-07-04","state":{"roadName":"Matoshree Ramabai Ambedkar Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-09-30","endDate":"2025-05-14","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mattubhai-annam-marg-m-w-2024-11-14","sourceKey":"mattubhai-annam-marg-m-w-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Mattubhai Annam Marg","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-14","endDate":"2025-05-20","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"matunga-road-no-2-f-n-2025-01-16","sourceKey":"matunga-road-no-2-f-n-2025-01-16","firstSeen":"2026-07-04","state":{"roadName":"Matunga Road no 2","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-01-16","endDate":"2025-05-31","lengthM":104.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"matunga-road-no-3-f-n-2024-11-27","sourceKey":"matunga-road-no-3-f-n-2024-11-27","firstSeen":"2026-07-04","state":{"roadName":"Matunga Road no 3","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-11-27","endDate":"2025-02-28","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"matunga-road-no-4-f-n-x","sourceKey":"matunga-road-no-4-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Matunga Road no 4","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":237,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"maulana-asad-madani-road-k-w-2024-02-15","sourceKey":"maulana-asad-madani-road-k-w-2024-02-15","firstSeen":"2026-07-04","state":{"roadName":"Maulana Asad Madani road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-15","endDate":"2024-11-01","lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mavji-rathod-road-b-2025-01-15","sourceKey":"mavji-rathod-road-b-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"Mavji Rathod Road","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-15","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mazgaon-koliwada-road-e-2026-01-01","sourceKey":"mazgaon-koliwada-road-e-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Mazgaon Koliwada Road","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-15","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"meena-mehta-marg-a-2025-10-01","sourceKey":"meena-mehta-marg-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Meena Mehta Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":47,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"meghraj-sethi-marg-morland-road-to-b-j-marg-e-x","sourceKey":"meghraj-sethi-marg-morland-road-to-b-j-marg-e-2025-11-20","firstSeen":"2026-07-04","state":{"roadName":"Meghraj Sethi Marg (Morland Road to B J Marg)","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-20","endDate":"2026-05-25","lengthM":640,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-14","field":"startDate","from":null,"to":"2025-11-20"}]},
{"id":"meghwadi-road-f-s-x","sourceKey":"meghwadi-road-f-s-x","firstSeen":"2026-07-04","state":{"roadName":"Meghwadi Road","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2027-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Not Started","to":"On Hold"}]},
{"id":"meredia-compound-sita-chawl-road-malad-east-p-n-2024-02-01","sourceKey":"meredia-compound-sita-chawl-road-malad-east-p-n-2024-02-01","firstSeen":"2026-07-04","state":{"roadName":"Meredia Compound & Sita Chawl road, Malad (East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-01","endDate":"2024-05-01","lengthM":97,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"merrun-street-r-s-2025-10-01","sourceKey":"merrun-street-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Merrun Street","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-01","endDate":"2026-01-20","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"metal-box-lane-g-s-2024-11-20","sourceKey":"metal-box-lane-g-s-2024-11-20","firstSeen":"2026-07-04","state":{"roadName":"Metal Box Lane","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-20","endDate":"2025-12-31","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mg-cross-link-road-goregaon-west-p-s-2024-10-15","sourceKey":"mg-cross-link-road-goregaon-west-p-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"MG Cross Link Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-15","endDate":"2025-05-31","lengthM":217,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mg-road-extension-goregaon-w-p-s-2023-10-10","sourceKey":"mg-road-extension-goregaon-w-p-s-2023-10-10","firstSeen":"2026-07-04","state":{"roadName":"MG Road Extension, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-10","endDate":"2026-04-09","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mgr-to-balaji-m-e-2025-12-01","sourceKey":"mgr-to-balaji-m-e-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"MGR to Balaji","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-12-01","endDate":"2027-05-31","lengthM":170,"pqcPercentProgress":52.94,"pqcCompletedOn":null},"changes":[]},
{"id":"mhada-colony-road-natwar-parekh-compound-m-e-2024-11-11","sourceKey":"mhada-colony-road-natwar-parekh-compound-m-e-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Mhada Colony road (Natwar Parekh Compound)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-11","endDate":"2025-05-24","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mhada-colony-rsc-road-no-2-malad-w-p-n-2024-09-30","sourceKey":"mhada-colony-rsc-road-no-2-malad-w-p-n-2024-09-30","firstSeen":"2026-07-04","state":{"roadName":"MHADA COLONY RSC-ROAD NO.2, MALAD(W)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2024-09-30","endDate":"2026-12-31","lengthM":700,"pqcPercentProgress":87.14,"pqcCompletedOn":null},"changes":[]},
{"id":"mhada-garden-road-in-front-of-filmistan-studio-goregaon-w-p-s-2024-01-01","sourceKey":"mhada-garden-road-in-front-of-filmistan-studio-goregaon-w-p-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Mhada Garden Road in front of Filmistan Studio, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-24","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mhatarpada-road-k-w-2025-05-01","sourceKey":"mhatarpada-road-k-w-2025-05-01","firstSeen":"2026-07-04","state":{"roadName":"Mhatarpada Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-05-01","endDate":"2026-03-31","lengthM":581,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mia-ahmad-chotani-marg-b-2025-10-01","sourceKey":"mia-ahmad-chotani-marg-b-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mia Ahmad Chotani Marg","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":40,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-a-cross-road-k-e-2023-04-19","sourceKey":"midc-a-cross-road-k-e-2023-04-19","firstSeen":"2026-07-04","state":{"roadName":"MIDC A Cross Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-19","endDate":"2024-01-28","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-b-x-road-k-e-2023-05-09","sourceKey":"midc-b-x-road-k-e-2023-05-09","firstSeen":"2026-07-04","state":{"roadName":"MIDC B X Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-05-09","endDate":"2024-04-13","lengthM":445,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-road-no-11-k-e-2024-10-02","sourceKey":"midc-road-no-11-k-e-2024-10-02","firstSeen":"2026-07-04","state":{"roadName":"MIDC road no 11","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-02","endDate":"2025-02-11","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-road-no-14-k-e-2023-11-11","sourceKey":"midc-road-no-14-k-e-2023-11-11","firstSeen":"2026-07-04","state":{"roadName":"MIDC Road No. 14","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-11","endDate":"2024-02-28","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-road-no-16-k-e-2024-11-01","sourceKey":"midc-road-no-16-k-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"MIDC Road no 16","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-11-01","endDate":"2026-04-19","lengthM":625,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-road-no-19-k-e-2025-01-17","sourceKey":"midc-road-no-19-k-e-2025-01-17","firstSeen":"2026-07-04","state":{"roadName":"MIDC Road no 19","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-17","endDate":"2025-05-31","lengthM":40,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-road-no-23-k-e-2024-10-02","sourceKey":"midc-road-no-23-k-e-2024-10-02","firstSeen":"2026-07-04","state":{"roadName":"MIDC road no 23","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-02","endDate":"2025-02-11","lengthM":570,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-road-no-6-k-e-2025-01-31","sourceKey":"midc-road-no-6-k-e-2025-01-31","firstSeen":"2026-07-04","state":{"roadName":"MIDC Road no 6","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-31","endDate":"2025-05-31","lengthM":75,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"midc-road-no-7-k-e-2023-10-01","sourceKey":"midc-road-no-7-k-e-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"MIDC Road no 7","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mig-colony-c-type-road-vinoba-bhave-nagar-road-to-vinoba-bhave-nagar-road-l-2024-01-10","sourceKey":"mig-colony-c-type-road-vinoba-bhave-nagar-road-to-vinoba-bhave-nagar-road-l-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"MIG Colony C type road ( Vinoba Bhave nagar road to Vinoba Bhave nagar road)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-01-10","endDate":"2025-05-31","lengthM":156,"pqcPercentProgress":76.92,"pqcCompletedOn":null},"changes":[]},
{"id":"milind-nagar-kurla-carshade-road-l-2025-10-10","sourceKey":"milind-nagar-kurla-carshade-road-l-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Milind nagar kurla carshade road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-10","endDate":"2026-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"milind-nagar-road-s-2025-10-01","sourceKey":"milind-nagar-road-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Milind Nagar Road","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-01-31","lengthM":181,"pqcPercentProgress":66.3,"pqcCompletedOn":null},"changes":[]},
{"id":"military-camp-road-h-e-2025-11-01","sourceKey":"military-camp-road-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Military Camp Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":710,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mindspace-cross-road-side-strip-malad-w-p-n-2025-11-01","sourceKey":"mindspace-cross-road-side-strip-malad-w-p-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Mindspace Cross Road Side strip Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"minor-road-from-ramnagar-to-hanuman-galli-bhandup-east-s-2025-01-08","sourceKey":"minor-road-from-ramnagar-to-hanuman-galli-bhandup-east-s-2025-01-08","firstSeen":"2026-07-04","state":{"roadName":"Minor Road from Ramnagar to Hanuman Galli, Bhandup East.","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-01-08","endDate":"2026-12-31","lengthM":350,"pqcPercentProgress":80,"pqcCompletedOn":null},"changes":[]},
{"id":"minor-road-from-sainagar-nalla-to-sateri-society-bhandup-e-s-2024-10-20","sourceKey":"minor-road-from-sainagar-nalla-to-sateri-society-bhandup-e-s-2024-10-20","firstSeen":"2026-07-04","state":{"roadName":"Minor Road from Sainagar Nalla to Sateri Society, Bhandup (E)","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-10-20","endDate":"2026-12-31","lengthM":160,"pqcPercentProgress":75,"pqcCompletedOn":null},"changes":[]},
{"id":"mirza-ali-street-b-x","sourceKey":"mirza-ali-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Mirza Ali Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":121,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mirza-galib-road-m-e-2025-10-01","sourceKey":"mirza-galib-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mirza Galib Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-02-14","lengthM":700,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"mithagar-road-r-n-2024-10-01","sourceKey":"mithagar-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mithagar Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":333,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mithi-river-approach-road-from-mithi-river-to-lbs-l-x","sourceKey":"mithi-river-approach-road-from-mithi-river-to-lbs-l-x","firstSeen":"2026-07-04","state":{"roadName":"Mithi River Approach Road (From Mithi River to LBS)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"miya-ahmed-chhotani-marg-md-a-rd-to-nagdevi-x-b-x","sourceKey":"miya-ahmed-chhotani-marg-md-a-rd-to-nagdevi-x-b-x","firstSeen":"2026-07-04","state":{"roadName":"Miya Ahmed Chhotani Marg (Md A Rd to Nagdevi X)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mmc-cross-road-no-5-g-n-2024-11-29","sourceKey":"mmc-cross-road-no-5-g-n-2024-11-29","firstSeen":"2026-07-04","state":{"roadName":"MMC Cross Road no.5","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-29","endDate":"2025-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mmc-road-g-n-2024-11-22","sourceKey":"mmc-road-g-n-2024-11-22","firstSeen":"2026-07-04","state":{"roadName":"MMC Road","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-22","endDate":"2026-05-31","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mmgs-marg-f-s-2024-11-26","sourceKey":"mmgs-marg-f-s-2024-11-26","firstSeen":"2026-07-04","state":{"roadName":"MMGS Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-26","endDate":"2026-01-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"model-town-from-jp-road-to-model-town-k-w-2024-10-01","sourceKey":"model-town-from-jp-road-to-model-town-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Model town from JP Road to Model town","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"model-town-road-t-2024-12-21","sourceKey":"model-town-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Model Town Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2026-04-09","lengthM":194,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mogra-service-road-k-e-2023-10-01","sourceKey":"mogra-service-road-k-e-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mogra Service Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mohan-compound-internal-road-no-1-l-2024-11-11","sourceKey":"mohan-compound-internal-road-no-1-l-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Mohan Compound internal Road No. 1","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-11","endDate":"2025-05-24","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mohan-compound-internal-road-no-2-l-2025-10-15","sourceKey":"mohan-compound-internal-road-no-2-l-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Mohan Compound internal Road No. 2","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-15","endDate":"2026-03-20","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mohan-compound-internal-road-no-3-l-2024-11-11","sourceKey":"mohan-compound-internal-road-no-3-l-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Mohan Compound internal Road No. 3","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-11","endDate":"2025-02-28","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mohd-ali-road-k-w-2025-11-15","sourceKey":"mohd-ali-road-k-w-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Mohd. Ali Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-11-15","endDate":"2026-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mohd-umar-kokil-marg-b-x","sourceKey":"mohd-umar-kokil-marg-b-x","firstSeen":"2026-07-04","state":{"roadName":"Mohd. Umar Kokil Marg","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mohili-pipe-line-road-saibaba-mandir-marg-l-x","sourceKey":"mohili-pipe-line-road-saibaba-mandir-marg-l-x","firstSeen":"2026-07-04","state":{"roadName":"Mohili Pipe line road (Saibaba Mandir Marg)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":780,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mongibai-road-vile-parle-k-e-x","sourceKey":"mongibai-road-vile-parle-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Mongibai Road Vile Parle","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mother-dairy-bad-patch-l-2023-11-01","sourceKey":"mother-dairy-bad-patch-l-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Mother Dairy Bad Patch","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2025-03-25","lengthM":30,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"motibai-path-near-amar-hotel-d-2025-10-01","sourceKey":"motibai-path-near-amar-hotel-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Motibai Path (near Amar Hotel)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":110,"pqcPercentProgress":72.73,"pqcCompletedOn":null},"changes":[]},
{"id":"motilal-nagar-no-1-road-no-02-goregaon-west-p-s-2025-10-01","sourceKey":"motilal-nagar-no-1-road-no-02-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Motilal Nagar No.1, Road No.02, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":307,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"motilal-nagar-no-1-road-no-03-goregaon-west-p-s-2024-12-23","sourceKey":"motilal-nagar-no-1-road-no-03-goregaon-west-p-s-2024-12-23","firstSeen":"2026-07-04","state":{"roadName":"Motilal Nagar No.1, Road No.03, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-12-23","endDate":"2026-05-31","lengthM":529,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"motilal-nagar-no-1-road-no-04-goregaon-west-p-s-2024-11-05","sourceKey":"motilal-nagar-no-1-road-no-04-goregaon-west-p-s-2024-11-05","firstSeen":"2026-07-04","state":{"roadName":"Motilal Nagar No.1, Road No.04, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-11-05","endDate":"2026-05-31","lengthM":745,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"motilal-nagar-road-2-goregaon-west-p-s-2024-10-01","sourceKey":"motilal-nagar-road-2-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Motilal Nagar Road 2, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-17","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"motiram-mhatre-road-r-n-2024-11-01","sourceKey":"motiram-mhatre-road-r-n-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Motiram Mhatre Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-01","endDate":"2026-04-11","lengthM":452,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mount-mary-road-h-w-x","sourceKey":"mount-mary-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Mount Mary Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":830,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mount-unique-road-d-x","sourceKey":"mount-unique-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Mount Unique Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mt-kadam-road-from-gmlr-to-ward-office-side-strips-m-e-x","sourceKey":"mt-kadam-road-from-gmlr-to-ward-office-side-strips-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"MT Kadam Road from GMLR to Ward Office (Side Strips)","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mtnl-road-except-cc-portion-near-bhullar-star-premises-chs-l-2025-10-01","sourceKey":"mtnl-road-except-cc-portion-near-bhullar-star-premises-chs-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"MTNL Road (Except CC Portion near Bhullar Star Premises CHS)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":270,"pqcPercentProgress":74.07,"pqcCompletedOn":null},"changes":[]},
{"id":"muddana-shetty-marg-tamarind-lane-a-2025-10-28","sourceKey":"muddana-shetty-marg-tamarind-lane-a-2025-10-28","firstSeen":"2026-07-04","state":{"roadName":"Muddana Shetty Marg (Tamarind Lane)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-28","endDate":"2026-05-31","lengthM":243,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mugbhat-lane-d-2025-10-10","sourceKey":"mugbhat-lane-d-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Mugbhat Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-10","endDate":"2026-05-31","lengthM":240,"pqcPercentProgress":25,"pqcCompletedOn":null},"changes":[]},
{"id":"muktadevi-mandir-marg-l-x","sourceKey":"muktadevi-mandir-marg-l-x","firstSeen":"2026-07-04","state":{"roadName":"Muktadevi Mandir Marg","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mukteshwar-temple-road-k-w-x","sourceKey":"mukteshwar-temple-road-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"Mukteshwar Temple Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-01-31","lengthM":423,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mumbadevi-road-tambakata-c-2026-10-01","sourceKey":"mumbadevi-road-tambakata-c-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Mumbadevi Road (Tambakata)","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-10-01","endDate":"2027-03-30","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"mumbai-samachar-marg-a-2026-01-05","sourceKey":"mumbai-samachar-marg-a-2026-01-05","firstSeen":"2026-07-04","state":{"roadName":"Mumbai Samachar Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-01-05","endDate":"2027-02-28","lengthM":360,"pqcPercentProgress":41.67,"pqcCompletedOn":null},"changes":[]},
{"id":"muncipal-school-versova-to-anthony-school-k-w-2025-10-10","sourceKey":"muncipal-school-versova-to-anthony-school-k-w-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Muncipal school versova to anthony school","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-10","endDate":"2026-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"municipal-garage-road-meghraj-sethi-cross-lane-e-x","sourceKey":"municipal-garage-road-meghraj-sethi-cross-lane-e-x","firstSeen":"2026-07-04","state":{"roadName":"Municipal Garage Road (Meghraj Sethi Cross Lane)","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-02-15","lengthM":45,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"murali-upadhyay-road-goregaon-e-p-s-2023-11-01","sourceKey":"murali-upadhyay-road-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Murali Upadhyay Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-25","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"murumkhada-road-lbs-to-dead-end-bhandup-west-s-2025-01-01","sourceKey":"murumkhada-road-lbs-to-dead-end-bhandup-west-s-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Murumkhada Road, LBS to dead end, Bhandup West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-01-01","endDate":"2027-05-31","lengthM":255,"pqcPercentProgress":70.59,"pqcCompletedOn":null},"changes":[]},
{"id":"muslim-cemetery-to-fire-brigade-marve-road-malad-w-p-n-2024-10-01","sourceKey":"muslim-cemetery-to-fire-brigade-marve-road-malad-w-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Muslim Cemetery to Fire Brigade Marve Road Malad W","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-15","lengthM":355,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"mussa-killedar-marg-e-x","sourceKey":"mussa-killedar-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Mussa Killedar Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-a-sawant-marg-a-2025-11-17","sourceKey":"n-a-sawant-marg-a-2025-11-17","firstSeen":"2026-07-04","state":{"roadName":"N.A. Sawant Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-17","endDate":"2026-11-30","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-b-patil-marg-from-ghatla-bmc-school-to-v-n-purav-marg-m-w-2023-11-01","sourceKey":"n-b-patil-marg-from-ghatla-bmc-school-to-v-n-purav-marg-m-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"N. B. Patil Marg from Ghatla BMC School to V.N. Purav Marg","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-dutta-approach-road-k-w-2024-10-01","sourceKey":"n-dutta-approach-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"N.Dutta Approach Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-g-park-road-r-n-2025-10-06","sourceKey":"n-g-park-road-r-n-2025-10-06","firstSeen":"2026-07-04","state":{"roadName":"N.G. Park Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-06","endDate":"2026-05-30","lengthM":443,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-l-paralkar-marg-f-s-2024-12-01","sourceKey":"n-l-paralkar-marg-f-s-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"N.L.Paralkar Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-31","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"n-p-thakkar-road-k-e-x","sourceKey":"n-p-thakkar-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"N P Thakkar Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-mankikar-l-x","sourceKey":"n-s-mankikar-l-x","firstSeen":"2026-07-04","state":{"roadName":"N. S. Mankikar","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2025-05-01","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-phadke-marg-side-strip-k-e-2026-01-31","sourceKey":"n-s-phadke-marg-side-strip-k-e-2026-01-31","firstSeen":"2026-07-04","state":{"roadName":"N S Phadke Marg ( Side Strip)","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2026-01-31","endDate":"2026-12-31","lengthM":650,"pqcPercentProgress":11.54,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-c-x","sourceKey":"n-s-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"N S Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-kilachand-to-ncpa-a-x","sourceKey":"n-s-road-kilachand-to-ncpa-a-x","firstSeen":"2026-10-13","state":{"roadName":"N S Road Kilachand To NCPA","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":1050,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-03-k-w-2024-10-01","sourceKey":"n-s-road-no-03-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"N.S Road No.03","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-05-k-w-2024-10-01","sourceKey":"n-s-road-no-05-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"N.S Road No.05","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":698,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-06-k-w-2024-10-01","sourceKey":"n-s-road-no-06-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"N.S Road No.06","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":706,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-07-k-w-2025-10-10","sourceKey":"n-s-road-no-07-k-w-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"N.S.Road no.07","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-10","endDate":"2026-05-31","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-09-k-w-2024-10-10","sourceKey":"n-s-road-no-09-k-w-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"N.S.Road no.09","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2026-05-31","lengthM":640,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-11-k-w-2024-12-14","sourceKey":"n-s-road-no-11-k-w-2024-12-14","firstSeen":"2026-07-04","state":{"roadName":"N.S.Road no.11","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-12-14","endDate":"2026-05-31","lengthM":843,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-12-a-k-w-2024-10-01","sourceKey":"n-s-road-no-12-a-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"N.S.Road no.12 A","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":364,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-12-k-w-2025-11-10","sourceKey":"n-s-road-no-12-k-w-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"N.S.Road no.12","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-11-10","endDate":"2026-05-31","lengthM":630,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-13-side-strips-k-w-2023-10-31","sourceKey":"n-s-road-no-13-side-strips-k-w-2023-10-31","firstSeen":"2026-07-04","state":{"roadName":"N.S.Road No. 13 ( Side Strips )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-31","endDate":"2024-05-24","lengthM":850,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-4-k-w-2023-04-11","sourceKey":"n-s-road-no-4-k-w-2023-04-11","firstSeen":"2026-07-04","state":{"roadName":"N S Road No 4","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-04-11","endDate":"2024-05-24","lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"n-s-road-no-8-k-w-2023-04-08","sourceKey":"n-s-road-no-8-k-w-2023-04-08","firstSeen":"2026-07-04","state":{"roadName":"N S Road No 8","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-04-08","endDate":"2024-05-24","lengthM":675,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nadiadwalla-colony-no-2-malad-w-p-n-2024-03-02","sourceKey":"nadiadwalla-colony-no-2-malad-w-p-n-2024-03-02","firstSeen":"2026-07-04","state":{"roadName":"Nadiadwalla Colony No. 2 Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-03-02","endDate":"2024-12-01","lengthM":460,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nagdevi-cross-lane-b-x","sourceKey":"nagdevi-cross-lane-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nagdevi Cross Lane","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":194,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nahurgaonthan-road-internal-from-nahur-goan-gym-to-mangal-archana-bldg-t-2026-01-01","sourceKey":"nahurgaonthan-road-internal-from-nahur-goan-gym-to-mangal-archana-bldg-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Nahurgaonthan Road (Internal) from Nahur Goan Gym to Mangal Archana Bldg","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-05-17","lengthM":240,"pqcPercentProgress":83.33,"pqcCompletedOn":null},"changes":[]},
{"id":"nahurgaonthan-road-internal-from-nahurgaon-riksha-stand-to-heera-nagar-t-2026-01-01","sourceKey":"nahurgaonthan-road-internal-from-nahurgaon-riksha-stand-to-heera-nagar-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Nahurgaonthan Road (Internal) from Nahurgaon Riksha Stand to Heera Nagar","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"naidu-colony-road-n-2023-12-22","sourceKey":"naidu-colony-road-n-2023-12-22","firstSeen":"2026-07-04","state":{"roadName":"Naidu Colony Road","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-12-22","endDate":"2026-05-31","lengthM":229,"pqcPercentProgress":93.89,"pqcCompletedOn":null},"changes":[]},
{"id":"nakhuda-street-b-x","sourceKey":"nakhuda-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nakhuda Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":141,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nakoda-street-c-2025-11-01","sourceKey":"nakoda-street-c-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Nakoda Street","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2025-12-31","lengthM":49.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nalanda-school-road-r-c-2025-02-01","sourceKey":"nalanda-school-road-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Nalanda School Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":144,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nalpada-road-t-2025-01-02","sourceKey":"nalpada-road-t-2025-01-02","firstSeen":"2026-07-04","state":{"roadName":"Nalpada Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-02","endDate":"2026-03-26","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"namaha-hospital-road-kandivali-w-r-s-2024-10-01","sourceKey":"namaha-hospital-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Namaha Hospital Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"namdev-umaji-bhalinge-road-e-2024-11-16","sourceKey":"namdev-umaji-bhalinge-road-e-x","firstSeen":"2026-07-04","state":{"roadName":"Namdev Umaji Bhalinge Road","ward":"E","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-14","field":"startDate","from":"2024-11-16","to":null},{"on":"2026-10-17","field":"status","from":"Deleted","to":"Completed"},{"on":"2026-10-17","field":"startDate","from":null,"to":"2024-11-16"},{"on":"2026-10-28","field":"status","from":"Completed","to":"Deleted"},{"on":"2026-10-28","field":"startDate","from":"2024-11-16","to":null}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Namdev Umaji Bhalinge Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-11-16","endDate":"2026-12-31","lengthM":225,"pqcPercentProgress":35.29,"pqcCompletedOn":null}},{"on":"2026-10-28","before":{"roadName":"Namdev Umaji Bhalinge Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-16","endDate":"2026-12-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null}}],"aliases":["namdev-umaji-bhalinge-road-e-x"]},
{"id":"nanabhai-moose-marg-a-2025-11-01","sourceKey":"nanabhai-moose-marg-a-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Nanabhai Moose Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":222,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nanak-bhojwani-garden-road-from-bmc-toilet-to-gurudwara-m-w-2025-11-01","sourceKey":"nanak-bhojwani-garden-road-from-bmc-toilet-to-gurudwara-m-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Nanak Bhojwani Garden Road from BMC Toilet to Gurudwara","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-01","endDate":"2026-04-11","lengthM":153,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nanda-patkar-marg-k-e-2025-11-19","sourceKey":"nanda-patkar-marg-k-e-2025-11-19","firstSeen":"2026-07-04","state":{"roadName":"Nanda Patkar Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-11-19","endDate":"2026-12-31","lengthM":660,"pqcPercentProgress":84.85,"pqcCompletedOn":null},"changes":[]},
{"id":"nandikeshwar-mandir-marg-l-2023-11-01","sourceKey":"nandikeshwar-mandir-marg-l-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Nandikeshwar Mandir Marg","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2024-11-22","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nandkishor-jayramji-marg-ghatkopar-w-n-2023-11-01","sourceKey":"nandkishor-jayramji-marg-ghatkopar-w-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Nandkishor Jayramji marg, Ghatkopar (W)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nanepada-road-t-2024-12-21","sourceKey":"nanepada-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Nanepada Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2026-05-15","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nanubhai-desai-road-c-2025-10-05","sourceKey":"nanubhai-desai-road-c-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Nanubhai Desai Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-05","endDate":"2026-05-30","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"narayan-dharmaji-mistry-marg-nehru-nagar-l-x","sourceKey":"narayan-dharmaji-mistry-marg-nehru-nagar-l-x","firstSeen":"2026-09-29","state":{"roadName":"Narayan dharmaji mistry marg,nehru nagar","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"narayan-dhuru-street-b-2025-12-01","sourceKey":"narayan-dhuru-street-b-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Narayan Dhuru Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-12-01","endDate":"2026-05-31","lengthM":193,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"narayan-joshi-cross-road-no-1-kandivali-w-r-s-2023-11-01","sourceKey":"narayan-joshi-cross-road-no-1-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Narayan Joshi cross road no. 1, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"narayan-joshi-cross-road-no-2-kandivali-w-r-s-2023-11-01","sourceKey":"narayan-joshi-cross-road-no-2-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Narayan Joshi cross road no. 2, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"narayan-joshi-road-kandivali-w-r-s-2025-10-01","sourceKey":"narayan-joshi-road-kandivali-w-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Narayan Joshi Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":212,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"narayan-mhatre-road-r-n-2025-10-01","sourceKey":"narayan-mhatre-road-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Narayan Mhatre Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":212,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nargis-dutt-road-extension-h-w-2024-11-07","sourceKey":"nargis-dutt-road-extension-h-w-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"Nargis Dutt Road Extension","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-07","endDate":"2026-01-10","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nariman-cross-road-k-e-2025-10-01","sourceKey":"nariman-cross-road-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Nariman cross Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-02-26","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"narmada-hall-road-malad-east-p-n-2024-10-31","sourceKey":"narmada-hall-road-malad-east-p-n-2024-10-31","firstSeen":"2026-07-04","state":{"roadName":"Narmada Hall Road Malad (East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-10-31","endDate":"2025-05-31","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"narottam-morarji-marg-a-2026-10-01","sourceKey":"narottam-morarji-marg-a-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Narottam Morarji Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":220,"pqcPercentProgress":59.09,"pqcCompletedOn":null},"changes":[]},
{"id":"narwane-school-road-r-s-2025-12-02","sourceKey":"narwane-school-road-r-s-2025-12-02","firstSeen":"2026-07-04","state":{"roadName":"Narwane School Road","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-12-02","endDate":"2027-05-31","lengthM":395,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"natakwala-lane-r-c-2024-10-01","sourceKey":"natakwala-lane-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Natakwala Lane","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-15","lengthM":506,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nath-madhav-lane-khattar-gully-d-2024-10-01","sourceKey":"nath-madhav-lane-khattar-gully-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Nath Madhav Lane. ( Khattar Gully)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2026-01-17","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nathalal-parikh-marg-a-2024-10-01","sourceKey":"nathalal-parikh-marg-a-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Nathalal Parikh Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":370,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nathalal-parikh-marg-side-strip-from-best-marg-to-deepak-jog-chowk-a-2026-01-06","sourceKey":"nathalal-parikh-marg-side-strip-from-best-marg-to-deepak-jog-chowk-a-2026-01-06","firstSeen":"2026-07-04","state":{"roadName":"Nathalal Parikh Marg side strip (from Best marg to Deepak Jog Chowk)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-01-06","endDate":"2026-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"national-library-road-h-w-2023-12-01","sourceKey":"national-library-road-h-w-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"National Library Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2024-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"national-library-road-h-w-2024-11-08","sourceKey":"national-library-road-h-w-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"National Library Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-08","endDate":"2025-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"natwar-nagar-road-no-1-k-e-2023-11-29","sourceKey":"natwar-nagar-road-no-1-k-e-2023-11-29","firstSeen":"2026-07-04","state":{"roadName":"Natwar nagar Road no 1","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-29","endDate":"2024-12-27","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"natwar-nagar-road-no-4-k-e-x","sourceKey":"natwar-nagar-road-no-4-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Natwar Nagar Road no.4","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-03-05","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-21","field":"status","from":"On Hold","to":"Deleted"}],"deletions":[{"on":"2026-09-21","before":{"roadName":"Natwar Nagar Road no.4","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"On Hold","startDate":null,"endDate":"2027-03-05","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"natwar-nagar-road-no-5-k-e-2023-11-08","sourceKey":"natwar-nagar-road-no-5-k-e-2023-11-08","firstSeen":"2026-07-04","state":{"roadName":"Natwar Nagar Road no 5","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-08","endDate":"2024-02-28","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"natwarya-narayan-datta-bhatt-road-k-e-2024-12-17","sourceKey":"natwarya-narayan-datta-bhatt-road-k-e-2024-12-17","firstSeen":"2026-07-04","state":{"roadName":"Natwarya Narayan Datta Bhatt Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-17","endDate":"2025-06-09","lengthM":112,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nava-land-lane-e-x","sourceKey":"nava-land-lane-e-x","firstSeen":"2026-07-04","state":{"roadName":"Nava Land Lane","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-10","lengthM":83,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"naval-dockyard-road-a-x","sourceKey":"naval-dockyard-road-a-x","firstSeen":"2026-10-13","state":{"roadName":"Naval Dockyard Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":580,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"navghar-gully-no-1-t-2026-01-01","sourceKey":"navghar-gully-no-1-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Navghar Gully No. 1","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2027-01-04","lengthM":170,"pqcPercentProgress":64.71,"pqcCompletedOn":null},"changes":[]},
{"id":"navghar-gully-no-2-t-2024-12-22","sourceKey":"navghar-gully-no-2-t-2024-12-22","firstSeen":"2026-07-04","state":{"roadName":"Navghar Gully No. 2","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-22","endDate":"2025-12-26","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"navghar-road-side-strips-t-2023-11-01","sourceKey":"navghar-road-side-strips-t-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Navghar Road (Side Strips)","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":665,"pqcPercentProgress":66.17,"pqcCompletedOn":null},"changes":[]},
{"id":"navjivan-school-extension-p-n-2023-11-11","sourceKey":"navjivan-school-extension-p-n-2023-11-11","firstSeen":"2026-07-04","state":{"roadName":"Navjivan School Extension","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-11","endDate":"2024-01-01","lengthM":68,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"navjivan-society-road-h-e-2025-12-03","sourceKey":"navjivan-society-road-h-e-2025-12-03","firstSeen":"2026-07-04","state":{"roadName":"Navjivan Society Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-03","endDate":"2026-01-27","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"navy-colony-road-p-n-2026-01-13","sourceKey":"navy-colony-road-p-n-2026-01-13","firstSeen":"2026-07-04","state":{"roadName":"Navy Colony Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-01-13","endDate":"2026-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"navyug-nagar-road-from-s-v-road-to-ajanta-bldg-dahisar-e-r-n-x","sourceKey":"navyug-nagar-road-from-s-v-road-to-ajanta-bldg-dahisar-e-r-n-x","firstSeen":"2026-07-04","state":{"roadName":"Navyug Nagar Road from S.V.Road to Ajanta Bldg, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Deleted","startDate":null,"endDate":"2024-11-30","lengthM":105,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nawab-tank-bridge-road-e-2025-12-01","sourceKey":"nawab-tank-bridge-road-e-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Nawab Tank Bridge Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-12-01","endDate":"2026-11-30","lengthM":304,"pqcPercentProgress":37.5,"pqcCompletedOn":null},"changes":[]},
{"id":"nawab-tank-galli-e-x","sourceKey":"nawab-tank-galli-e-x","firstSeen":"2026-07-04","state":{"roadName":"Nawab Tank Galli","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nawroji-hill-road-no-9-b-2024-12-05","sourceKey":"nawroji-hill-road-no-9-b-2024-12-05","firstSeen":"2026-07-04","state":{"roadName":"Nawroji Hill road No 9","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-05","endDate":"2025-05-31","lengthM":181,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ncpa-marg-a-2024-12-09","sourceKey":"ncpa-marg-a-2024-12-09","firstSeen":"2026-07-04","state":{"roadName":"NCPA Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-09","endDate":"2025-05-31","lengthM":187.35,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nester-compound-road-h-e-2024-11-01","sourceKey":"nester-compound-road-h-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Nester Compound Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-english-school-marg-h-e-2023-10-15","sourceKey":"new-english-school-marg-h-e-2023-10-15","firstSeen":"2026-07-04","state":{"roadName":"New English School Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-15","endDate":"2024-05-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-kantwadi-road-h-w-x","sourceKey":"new-kantwadi-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"New Kantwadi Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":426,"pqcPercentProgress":93.9,"pqcCompletedOn":null},"changes":[]},
{"id":"new-link-road-to-hotel-orritel-west-c-t-s-no-650-3-k-w-x","sourceKey":"new-link-road-to-hotel-orritel-west-c-t-s-no-650-3-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"New Link Road to Hotel Orritel West (C.T.S no 650/3 )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-link-road-to-monginese-factory-c-t-s-no-650-3-k-w-2023-12-10","sourceKey":"new-link-road-to-monginese-factory-c-t-s-no-650-3-k-w-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"New Link Road to Monginese Factory (C.T.S no 650/3 )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-10","endDate":"2024-05-24","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-mhada-road-p-n-2024-10-01","sourceKey":"new-mhada-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"New Mhada Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-mhb-colony-main-road-r-c-2024-10-01","sourceKey":"new-mhb-colony-main-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"New MHB Colony main road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":516,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-mig-road-h-e-x","sourceKey":"new-mig-road-h-e-x","firstSeen":"2026-07-04","state":{"roadName":"New MIG Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-mill-road-from-new-ajinkyatara-pathpedi-to-lbs-road-l-2025-11-01","sourceKey":"new-mill-road-from-new-ajinkyatara-pathpedi-to-lbs-road-l-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"New Mill Road (From new Ajinkyatara Pathpedi to LBS Road)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-11-01","endDate":"2027-05-25","lengthM":500,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[]},
{"id":"new-mill-road-mehtab-lane-to-ramdas-chowk-l-2025-11-01","sourceKey":"new-mill-road-mehtab-lane-to-ramdas-chowk-l-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"New mill road (Mehtab lane to Ramdas Chowk)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-11-01","endDate":"2027-05-25","lengthM":350,"pqcPercentProgress":17.14,"pqcCompletedOn":null},"changes":[]},
{"id":"new-nagardas-road-k-e-2025-01-01","sourceKey":"new-nagardas-road-k-e-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"New Nagardas Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-01","endDate":"2025-03-18","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-prabhadevi-marg-g-s-2024-12-02","sourceKey":"new-prabhadevi-marg-g-s-2024-12-02","firstSeen":"2026-07-04","state":{"roadName":"New Prabhadevi Marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-02","endDate":"2025-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"new-rahul-nagar-rachana-garden-t-2025-10-01","sourceKey":"new-rahul-nagar-rachana-garden-t-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"New Rahul Nagar (Rachana Garden)","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-02-14","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nicholaswadi-road-k-e-x","sourceKey":"nicholaswadi-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Nicholaswadi Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nicolaswadi-rd-side-strip-k-e-2025-11-26","sourceKey":"nicolaswadi-rd-side-strip-k-e-2025-11-26","firstSeen":"2026-07-04","state":{"roadName":"Nicolaswadi  Rd Side strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-26","endDate":"2026-11-20","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nirmal-nagar-school-road-h-e-2025-10-01","sourceKey":"nirmal-nagar-school-road-h-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Nirmal Nagar School Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-01","endDate":"2027-05-02","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nisarag-road-bldg-mahavir-nagar-r-c-2024-10-01","sourceKey":"nisarag-road-bldg-mahavir-nagar-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Nisarag Road Bldg ,Mahavir Nagar","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":278,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nishanpada-x-lane-b-x","sourceKey":"nishanpada-x-lane-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nishanpada X Lane","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nitu-mandke-road-m-e-2024-10-01","sourceKey":"nitu-mandke-road-m-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Nitu Mandke Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-12-07","lengthM":373,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nityanand-baug-road-from-c-g-road-sattu-sweets-to-walia-compound-road-m-w-2024-10-10","sourceKey":"nityanand-baug-road-from-c-g-road-sattu-sweets-to-walia-compound-road-m-w-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Nityanand Baug Road from C. G. Road (Sattu Sweets) to Walia Compound Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-10-10","endDate":"2026-12-30","lengthM":300,"pqcPercentProgress":83.33,"pqcCompletedOn":null},"changes":[]},
{"id":"noor-masjid-road-goregaon-west-p-s-2026-03-15","sourceKey":"noor-masjid-road-goregaon-west-p-s-2026-03-15","firstSeen":"2026-07-04","state":{"roadName":"Noor Masjid Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-03-15","endDate":"2026-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"noorie-masjid-road-ravi-hotel-road-h-e-2024-11-08","sourceKey":"noorie-masjid-road-ravi-hotel-road-h-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Noorie Masjid Road  (Ravi Hotel Road)","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-08","endDate":"2026-05-21","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"north-avenue-road-h-w-2024-11-07","sourceKey":"north-avenue-road-h-w-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"North Avenue Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2024-11-07","endDate":"2027-05-10","lengthM":900,"pqcPercentProgress":86.11,"pqcCompletedOn":null},"changes":[]},
{"id":"north-bombay-school-road-n-2024-11-12","sourceKey":"north-bombay-school-road-n-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"North Bombay School Road","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-12","endDate":"2026-04-30","lengthM":315,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-1-b-2024-11-12","sourceKey":"nowroji-hill-road-no-1-b-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no. 1","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-12","endDate":"2025-02-28","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-11a-b-2025-10-01","sourceKey":"nowroji-hill-road-no-11a-b-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.11A","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-05","lengthM":42,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-11b-b-2025-10-15","sourceKey":"nowroji-hill-road-no-11b-b-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.11B","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-15","endDate":"2026-05-10","lengthM":25,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-11c-b-x","sourceKey":"nowroji-hill-road-no-11c-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.11C","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":25,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-11d-b-x","sourceKey":"nowroji-hill-road-no-11d-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.11D","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-10","lengthM":25,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-11e-b-2025-12-01","sourceKey":"nowroji-hill-road-no-11e-b-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.11E","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-12-01","endDate":"2026-05-31","lengthM":25,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-16-b-2026-01-15","sourceKey":"nowroji-hill-road-no-16-b-2026-01-15","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.16","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-01-15","endDate":"2026-03-30","lengthM":82,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-19-b-x","sourceKey":"nowroji-hill-road-no-19-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.19","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-2-b-x","sourceKey":"nowroji-hill-road-no-2-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no. 2","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-4-b-2024-11-21","sourceKey":"nowroji-hill-road-no-4-b-2024-11-21","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no. 4","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-21","endDate":"2025-03-31","lengthM":196,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-5-b-2025-12-01","sourceKey":"nowroji-hill-road-no-5-b-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no. 5","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-12-01","endDate":"2026-04-30","lengthM":204,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"nowroji-hill-road-no-7-b-x","sourceKey":"nowroji-hill-road-no-7-b-x","firstSeen":"2026-07-04","state":{"roadName":"Nowroji Hill Road no.7","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"oak-lane-abdul-razzak-allana-marg-a-2026-03-01","sourceKey":"oak-lane-abdul-razzak-allana-marg-a-2026-03-01","firstSeen":"2026-07-04","state":{"roadName":"Oak Lane (Abdul Razzak Allana Marg)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-03-01","endDate":"2026-05-31","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"oasis-road-m-e-2026-02-27","sourceKey":"oasis-road-m-e-2026-02-27","firstSeen":"2026-07-04","state":{"roadName":"Oasis road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-27","endDate":"2027-03-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"octacrest-road-lokhandwala-complex-r-s-2024-10-01","sourceKey":"octacrest-road-lokhandwala-complex-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Octacrest Road,Lokhandwala Complex","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":177.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"odhav-nagar-road-r-c-2025-02-01","sourceKey":"odhav-nagar-road-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Odhav Nagar Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":262,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-military-road-k-e-2025-01-01","sourceKey":"off-military-road-k-e-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"off Military Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-01","endDate":"2026-02-24","lengthM":425,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-mmm-road-and-goshala-road-t-2026-01-01","sourceKey":"off-mmm-road-and-goshala-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Off MMM Road and Goshala Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-05-17","lengthM":171,"pqcPercentProgress":40.94,"pqcCompletedOn":null},"changes":[]},
{"id":"off-nehru-road-k-e-x","sourceKey":"off-nehru-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Off Nehru Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-nurgis-dutt-road-h-w-x","sourceKey":"off-nurgis-dutt-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Off Nurgis Dutt Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2026-05-25","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-pali-market-road-h-w-2024-12-01","sourceKey":"off-pali-market-road-h-w-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Off Pali Market Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-15","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-rajawadi-7th-road-from-rajawadi-road-no-7-to-dead-end-n-2025-10-25","sourceKey":"off-rajawadi-7th-road-from-rajawadi-road-no-7-to-dead-end-n-x","firstSeen":"2026-07-04","state":{"roadName":"Off Rajawadi 7th Road (From Rajawadi Road no.7 to Dead end)","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2026-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"In Progress","to":"On Hold"},{"on":"2026-10-27","field":"startDate","from":"2025-10-25","to":null}]},
{"id":"off-rhb-road-t-2026-01-01","sourceKey":"off-rhb-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Off RHB Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-04-30","lengthM":75,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-shivneri-vasahat-road-k-e-2023-11-16","sourceKey":"off-shivneri-vasahat-road-k-e-2023-11-16","firstSeen":"2026-07-04","state":{"roadName":"Off Shivneri Vasahat Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-16","endDate":"2024-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-sn-road-om-sai-shraddha-chs-t-2026-01-01","sourceKey":"off-sn-road-om-sai-shraddha-chs-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Off SN Road (Om Sai Shraddha CHS)","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-04-29","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-sunder-nagar-road-no-02-h-e-2024-10-01","sourceKey":"off-sunder-nagar-road-no-02-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Off. Sunder Nagar Road no. 02","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-sunder-nagar-road-no-03-extension-h-e-2026-10-01","sourceKey":"off-sunder-nagar-road-no-03-extension-h-e-2026-10-01","firstSeen":"2026-10-20","state":{"roadName":"Off. Sunder Nagar Road no. 03 (Extension)","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-sunder-nagar-road-no-03-h-e-2024-10-01","sourceKey":"off-sunder-nagar-road-no-03-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Off. Sunder Nagar Road no. 03","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2025-04-30","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-v-b-phadake-road-t-x","sourceKey":"off-v-b-phadake-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"off V.B.Phadake Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-04-30","lengthM":103,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-23","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-23","field":"startDate","from":null,"to":"2026-01-01"}]},
{"id":"off-veena-nagar-road-t-2024-12-21","sourceKey":"off-veena-nagar-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Off Veena Nagar Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2026-02-14","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"off-ymca-road-h-w-2024-10-17","sourceKey":"off-ymca-road-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Off YMCA Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-12-31","lengthM":78,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-agra-road-no-1-t-2026-01-01","sourceKey":"old-agra-road-no-1-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Old Agra Road no.1","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-15","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-agra-road-no-2-t-2025-01-01","sourceKey":"old-agra-road-no-2-t-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Old Agra Road No. 2","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-15","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-cst-road-h-e-2025-11-01","sourceKey":"old-cst-road-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Old CST Road.","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"In Progress","startDate":"2025-11-01","endDate":"2027-04-04","lengthM":425,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"old-hanuman-lane-c-x","sourceKey":"old-hanuman-lane-c-x","firstSeen":"2026-07-04","state":{"roadName":"Old Hanuman Lane","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-link-road-r-s-2025-12-02","sourceKey":"old-link-road-r-s-2025-12-02","firstSeen":"2026-07-04","state":{"roadName":"Old Link Road","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-12-02","endDate":"2027-05-31","lengthM":1100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-mhb-internal-road-behind-police-station-r-c-2024-11-01","sourceKey":"old-mhb-internal-road-behind-police-station-r-c-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Old MHB Internal Road Behind Police station","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-mhb-internal-road-borivali-west-r-c-2023-10-25","sourceKey":"old-mhb-internal-road-borivali-west-r-c-2023-10-25","firstSeen":"2026-07-04","state":{"roadName":"Old MHB internal Road, Borivali (West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-25","endDate":"2025-05-31","lengthM":266,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-nagardas-cross-road-k-e-2024-12-19","sourceKey":"old-nagardas-cross-road-k-e-2024-12-19","firstSeen":"2026-07-04","state":{"roadName":"Old Nagardas Cross Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-19","endDate":"2025-05-07","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-nagardas-rd-side-strip-k-e-2025-10-01","sourceKey":"old-nagardas-rd-side-strip-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Old Nagardas Rd Side strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-12-15","lengthM":980,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"old-prabhadevi-marg-g-s-2024-11-28","sourceKey":"old-prabhadevi-marg-g-s-2024-11-28","firstSeen":"2026-07-04","state":{"roadName":"Old Prabhadevi Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-28","endDate":"2025-05-31","lengthM":440,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"om-welfare-society-l-2024-10-03","sourceKey":"om-welfare-society-l-2024-10-03","firstSeen":"2026-07-04","state":{"roadName":"Om welfare society","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-03","endDate":"2025-04-30","lengthM":25,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"opp-dindoshi-fire-brigade-malad-e-p-n-2025-01-01","sourceKey":"opp-dindoshi-fire-brigade-malad-e-p-n-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Opp Dindoshi Fire brigade , Malad (E)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2026-05-28","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"oriental-school-lane-k-w-2024-10-01","sourceKey":"oriental-school-lane-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Oriental School Lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"oshiwara-garden-road-k-w-2025-10-01","sourceKey":"oshiwara-garden-road-k-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Oshiwara Garden Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":178,"pqcPercentProgress":78.65,"pqcCompletedOn":null},"changes":[]},
{"id":"p-balu-marg-g-s-x","sourceKey":"p-balu-marg-g-s-x","firstSeen":"2026-07-04","state":{"roadName":"P.Balu Marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":363,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"p-d-mello-road-side-strip-b-2025-10-10","sourceKey":"p-d-mello-road-side-strip-b-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"P D'mello Road ( Side Strip )","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-10","endDate":"2027-05-31","lengthM":1710,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-18","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-18","field":"startDate","from":"2025-10-10","to":null},{"on":"2026-10-20","field":"status","from":"Deleted","to":"In Progress"},{"on":"2026-10-20","field":"startDate","from":null,"to":"2025-10-10"},{"on":"2026-10-22","field":"status","from":"In Progress","to":"Completed"}],"deletions":[{"on":"2026-10-18","before":{"roadName":"P D'mello Road ( Side Strip )","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-10","endDate":"2027-05-31","lengthM":1710,"pqcPercentProgress":47.19,"pqcCompletedOn":null}}],"aliases":["p-d-mello-road-side-strip-b-x"]},
{"id":"p-godrej-marg-junction-to-sai-enclave-building-vikhroli-east-s-2026-03-15","sourceKey":"p-godrej-marg-junction-to-sai-enclave-building-vikhroli-east-s-2026-03-15","firstSeen":"2026-07-04","state":{"roadName":"P Godrej Marg Junction to Sai Enclave Building, Vikhroli East.","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2026-03-15","endDate":"2027-05-15","lengthM":40,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-22","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"p-l-deshpande-k-w-x","sourceKey":"p-l-deshpande-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"P.L. Deshpande","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"p-l-deshpande-road-k-e-2026-02-04","sourceKey":"p-l-deshpande-road-k-e-2026-02-04","firstSeen":"2026-07-04","state":{"roadName":"P L Deshpande Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-02-04","endDate":"2026-04-20","lengthM":55,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"p-l-lokhande-marg-side-strips-m-e-2023-11-01","sourceKey":"p-l-lokhande-marg-side-strips-m-e-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"P.L.Lokhande Marg. (Side Strips)","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-11-01","endDate":"2026-12-31","lengthM":980,"pqcPercentProgress":79.8,"pqcCompletedOn":null},"changes":[]},
{"id":"p-m-road-h-w-2023-01-12","sourceKey":"p-m-road-h-w-2023-01-12","firstSeen":"2026-07-04","state":{"roadName":"P M Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-01-12","endDate":"2024-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"p-m-shukla-nirzhar-marg-c-road-a-2025-10-29","sourceKey":"p-m-shukla-nirzhar-marg-c-road-a-2025-10-29","firstSeen":"2026-07-04","state":{"roadName":"P.M.Shukla ‘Nirzhar’ Marg(C Road)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-29","endDate":"2026-05-30","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"p-p-patil-marg-a-2024-12-05","sourceKey":"p-p-patil-marg-a-2024-12-05","firstSeen":"2026-07-04","state":{"roadName":"P P Patil Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-05","endDate":"2025-03-31","lengthM":62.8,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"p-soman-marg-vikhroli-station-road-vikhroli-west-s-x","sourceKey":"p-soman-marg-vikhroli-station-road-vikhroli-west-s-x","firstSeen":"2026-07-04","state":{"roadName":"P Soman Marg (Vikhroli Station Road), Vikhroli, (West)","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":null,"lengthM":480,"pqcPercentProgress":91.67,"pqcCompletedOn":"2026-12-15"},"changes":[]},
{"id":"p-y-thorat-marg-from-chembur-station-skywalk-to-m-w-boundary-m-w-2025-10-01","sourceKey":"p-y-thorat-marg-from-chembur-station-skywalk-to-m-w-boundary-m-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"P. Y. Thorat Marg from Chembur Station Skywalk to M/W Boundary","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-30","lengthM":1000,"pqcPercentProgress":50,"pqcCompletedOn":null},"changes":[]},
{"id":"paanch-mandir-road-s-x","sourceKey":"paanch-mandir-road-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Paanch Mandir Road","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":120,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-22","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-22","field":"startDate","from":null,"to":"2025-10-01"}]},
{"id":"pachlegaonkar-maharaj-road-no-1-t-2025-11-13","sourceKey":"pachlegaonkar-maharaj-road-no-1-t-2025-11-13","firstSeen":"2026-07-04","state":{"roadName":"Pachlegaonkar Maharaj Road No.1","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-13","endDate":"2026-03-25","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"padamji-path-d-2025-11-06","sourceKey":"padamji-path-d-2025-11-06","firstSeen":"2026-07-04","state":{"roadName":"Padamji Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-06","endDate":"2026-04-30","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"padmakar-jawale-road-r-n-2024-10-10","sourceKey":"padmakar-jawale-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Padmakar Jawale Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-03-31","lengthM":137,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"padmakar-ramchandra-kangutkar-road-vikhroli-e-s-2023-04-08","sourceKey":"padmakar-ramchandra-kangutkar-road-vikhroli-e-s-2023-04-08","firstSeen":"2026-07-04","state":{"roadName":"Padmakar Ramchandra Kangutkar Road, Vikhroli (E).","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-04-08","endDate":"2025-05-15","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"padmawati-road-goregaon-e-p-s-2024-10-10","sourceKey":"padmawati-road-goregaon-e-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Padmawati Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2024-10-10","endDate":"2026-05-31","lengthM":630,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"pais-street-e-2025-12-01","sourceKey":"pais-street-e-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Pais Street","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-12-01","endDate":"2026-12-31","lengthM":240,"pqcPercentProgress":37.5,"pqcCompletedOn":null},"changes":[]},
{"id":"pal-nagar-road-forest-area-p-n-2023-11-20","sourceKey":"pal-nagar-road-forest-area-p-n-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Pal Nagar Road (Forest Area)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-20","endDate":"2024-05-01","lengthM":55,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pali-mala-road-h-w-2023-10-01","sourceKey":"pali-mala-road-h-w-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pali Mala Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2026-01-08","lengthM":729,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"paliram-road-k-w-2024-10-01","sourceKey":"paliram-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Paliram road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-02","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pan-bazar-road-l-2025-10-01","sourceKey":"pan-bazar-road-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pan Bazar Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":290,"pqcPercentProgress":50,"pqcCompletedOn":null},"changes":[]},
{"id":"panch-kutir-junction-acp-office-to-jvlr-powai-s-2024-12-07","sourceKey":"panch-kutir-junction-acp-office-to-jvlr-powai-s-2024-12-07","firstSeen":"2026-07-04","state":{"roadName":"Panch Kutir junction ( ACP Office ) to JVLR, Powai","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-07","endDate":"2025-03-30","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pancholiya-school-road-r-s-2023-10-16","sourceKey":"pancholiya-school-road-r-s-2023-10-16","firstSeen":"2026-07-04","state":{"roadName":"Pancholiya School Road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-16","endDate":"2024-11-30","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"panchsheel-nagar-road-t-2025-10-01","sourceKey":"panchsheel-nagar-road-t-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Panchsheel Nagar Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-04-08","lengthM":138,"pqcPercentProgress":32.61,"pqcCompletedOn":null},"changes":[]},
{"id":"pandey-road-a-2024-11-13","sourceKey":"pandey-road-a-2024-11-13","firstSeen":"2026-07-04","state":{"roadName":"Pandey Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-13","endDate":"2025-05-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandit-gunidas-marg-g-n-2025-01-28","sourceKey":"pandit-gunidas-marg-g-n-2025-01-28","firstSeen":"2026-07-04","state":{"roadName":"Pandit Gunidas Marg","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-01-28","endDate":"2026-05-09","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandit-malharao-kulkarni-marg-19th-road-side-strip-r-c-2023-10-26","sourceKey":"pandit-malharao-kulkarni-marg-19th-road-side-strip-r-c-2023-10-26","firstSeen":"2026-07-04","state":{"roadName":"Pandit Malharao Kulkarni Marg (19th Road) Side Strip","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-26","endDate":"2025-05-31","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandita-ramabai-marg-d-2025-10-01","sourceKey":"pandita-ramabai-marg-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pandita Ramabai Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":45,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-10","field":"startDate","from":"2025-10-01","to":null},{"on":"2026-10-16","field":"status","from":"Deleted","to":"Completed"},{"on":"2026-10-16","field":"startDate","from":null,"to":"2025-10-01"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"Pandita Ramabai Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":680,"pqcPercentProgress":7.56,"pqcCompletedOn":null}}],"aliases":["pandita-ramabai-marg-d-x"]},
{"id":"panditlal-tiwari-road-r-s-2025-10-01","sourceKey":"panditlal-tiwari-road-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Panditlal Tiwari road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"panduran-naik-marg-g-n-2024-12-22","sourceKey":"panduran-naik-marg-g-n-2024-12-22","firstSeen":"2026-07-04","state":{"roadName":"Panduran Naik Marg","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2024-12-22","endDate":"2027-05-31","lengthM":520,"pqcPercentProgress":87.12,"pqcCompletedOn":null},"changes":[]},
{"id":"pandurang-wadi-cross-road-1-goregaon-e-p-s-2024-01-01","sourceKey":"pandurang-wadi-cross-road-1-goregaon-e-p-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Pandurang Wadi Cross Road 1, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-24","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandurang-wadi-cross-road-3-goregaon-e-p-s-2023-11-01","sourceKey":"pandurang-wadi-cross-road-3-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Pandurang Wadi Cross Road 3, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-01-24","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandurang-wadi-cross-road-4-goregaon-e-p-s-2023-12-01","sourceKey":"pandurang-wadi-cross-road-4-goregaon-e-p-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Pandurang Wadi Cross Road 4, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-01","endDate":"2024-05-24","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandurangwadi-main-road-goregaon-east-p-s-2023-04-05","sourceKey":"pandurangwadi-main-road-goregaon-east-p-s-2023-04-05","firstSeen":"2026-07-04","state":{"roadName":"Pandurangwadi Main Road, Goregaon east","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2023-04-05","endDate":"2026-05-31","lengthM":1125,"pqcPercentProgress":77.51,"pqcCompletedOn":null},"changes":[]},
{"id":"pandurangwadi-road-no-03-goregaon-east-p-s-2024-10-01","sourceKey":"pandurangwadi-road-no-03-goregaon-east-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pandurangwadi Road No.03, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":397,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandurangwadi-road-no-05-goregaon-east-p-s-2024-11-11","sourceKey":"pandurangwadi-road-no-05-goregaon-east-p-s-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Pandurangwadi Road No.05, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-11-11","endDate":"2025-05-31","lengthM":129,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pandurangwadi-road-no-06-goregaon-east-p-s-2025-10-01","sourceKey":"pandurangwadi-road-no-06-goregaon-east-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pandurangwadi Road No.06, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-31","lengthM":128,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"panjrapole-1st-lane-c-2026-01-14","sourceKey":"panjrapole-1st-lane-c-2026-01-14","firstSeen":"2026-07-04","state":{"roadName":"Panjrapole 1st Lane","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2026-01-14","endDate":"2026-05-26","lengthM":158,"pqcPercentProgress":53.8,"pqcCompletedOn":null},"changes":[]},
{"id":"pankaj-shah-marg-goregaon-e-p-s-x","sourceKey":"pankaj-shah-marg-goregaon-e-p-s-x","firstSeen":"2026-07-04","state":{"roadName":"Pankaj Shah MARG, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pannalal-ghosh-road-somwar-bazar-marg-malad-west-p-n-2023-10-20","sourceKey":"pannalal-ghosh-road-somwar-bazar-marg-malad-west-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"Pannalal Ghosh Road Somwar Bazar marg , Malad (west)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-12-01","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"paper-box-road-k-e-2024-10-02","sourceKey":"paper-box-road-k-e-2024-10-02","firstSeen":"2026-07-04","state":{"roadName":"Paper Box Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-02","endDate":"2027-03-15","lengthM":860,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"papnas-wadi-road-d-2024-10-01","sourceKey":"papnas-wadi-road-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Papnas Wadi Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"par-portion-of-pratap-nagar-road-bhandup-w-s-x","sourceKey":"par-portion-of-pratap-nagar-road-bhandup-w-s-x","firstSeen":"2026-07-04","state":{"roadName":"Par portion of Pratap Nagar road, Bhandup (W),","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2027-05-15","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Par portion of Pratap Nagar road, Bhandup (W),","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2027-05-15","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"paras-nagar-internal-roads-p-n-2024-10-01","sourceKey":"paras-nagar-internal-roads-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Paras nagar internal roads","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parbat-nagar-road-from-s-v-road-to-varsha-bldg-dahisar-e-r-n-x","sourceKey":"parbat-nagar-road-from-s-v-road-to-varsha-bldg-dahisar-e-r-n-x","firstSeen":"2026-07-04","state":{"roadName":"Parbat Nagar Road from S.V.Road to Varsha Bldg, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Deleted","startDate":null,"endDate":"2024-11-30","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pareira-hill-road-k-e-2024-10-10","sourceKey":"pareira-hill-road-k-e-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Pareira Hill Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":273,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parekh-nagar-road-p-n-2023-10-26","sourceKey":"parekh-nagar-road-p-n-2023-10-26","firstSeen":"2026-07-04","state":{"roadName":"Parekh nagar road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-26","endDate":"2024-05-01","lengthM":206,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parekhnagar-road-t-d-vora-malad-east-p-n-2023-10-05","sourceKey":"parekhnagar-road-t-d-vora-malad-east-p-n-2023-10-05","firstSeen":"2026-07-04","state":{"roadName":"Parekhnagar road T D Vora, Malad (East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-05","endDate":"2024-05-01","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"paresh-parkar-marg-vikhroli-east-s-2026-03-15","sourceKey":"paresh-parkar-marg-vikhroli-east-s-x","firstSeen":"2026-07-04","state":{"roadName":"Paresh Parkar Marg, Vikhroli East","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2027-05-15","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-14","field":"startDate","from":"2026-03-15","to":null}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Paresh Parkar Marg, Vikhroli East","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-03-15","endDate":"2027-05-15","lengthM":240,"pqcPercentProgress":0,"pqcCompletedOn":null}}]},
{"id":"parishramalaya-road-h-e-2026-02-15","sourceKey":"parishramalaya-road-h-e-2026-02-15","firstSeen":"2026-07-04","state":{"roadName":"Parishramalaya Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-02-15","endDate":"2026-05-23","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"park-view-lane-ghatkopar-east-n-x","sourceKey":"park-view-lane-ghatkopar-east-n-x","firstSeen":"2026-07-04","state":{"roadName":"Park View Lane, Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":128,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parkrwadi-t-p-road-g-n-x","sourceKey":"parkrwadi-t-p-road-g-n-x","firstSeen":"2026-07-04","state":{"roadName":"Parkrwadi T P Road","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parleshwar-road-k-e-2024-03-06","sourceKey":"parleshwar-road-k-e-2024-03-06","firstSeen":"2026-07-04","state":{"roadName":"Parleshwar Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-03-06","endDate":"2025-03-27","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parshiwadi-cemetry-road-k-e-2025-10-01","sourceKey":"parshiwadi-cemetry-road-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Parshiwadi Cemetry Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-25","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parshiwadi-road-h-e-x","sourceKey":"parshiwadi-road-h-e-x","firstSeen":"2026-07-04","state":{"roadName":"Parshiwadi Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":475,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parshuram-pupala-marg-d-x","sourceKey":"parshuram-pupala-marg-d-x","firstSeen":"2026-07-04","state":{"roadName":"Parshuram Pupala Marg","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parshuram-pupla-marg-e-2026-03-27","sourceKey":"parshuram-pupla-marg-e-2026-03-27","firstSeen":"2026-07-04","state":{"roadName":"Parshuram pupla Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-03-27","endDate":"2026-05-31","lengthM":445,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parsi-colony-road-no-4-f-n-2025-11-01","sourceKey":"parsi-colony-road-no-4-f-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Parsi Colony Road no 4","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":239,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"parsi-colony-road-no-6-f-n-2024-11-14","sourceKey":"parsi-colony-road-no-6-f-n-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Parsi Colony Road no 6","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-14","endDate":"2025-04-30","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"part-portion-of-h-d-koparkar-road-bhandup-e-s-2026-03-15","sourceKey":"part-portion-of-h-d-koparkar-road-bhandup-e-s-2026-03-15","firstSeen":"2026-07-04","state":{"roadName":"Part portion of H.D. Koparkar Road, Bhandup (E)","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-03-15","endDate":"2026-12-25","lengthM":180,"pqcPercentProgress":86.11,"pqcCompletedOn":null},"changes":[]},
{"id":"patan-jain-mandal-marg-f-road-a-2025-10-29","sourceKey":"patan-jain-mandal-marg-f-road-a-2025-10-29","firstSeen":"2026-07-04","state":{"roadName":"Patan Jain Mandal Marg (F Road)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-29","endDate":"2026-05-30","lengthM":205,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"patel-nahar-road-kapol-school-r-s-2025-10-01","sourceKey":"patel-nahar-road-kapol-school-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Patel Nahar Road (Kapol School)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"patel-wadi-road-malad-west-p-n-x","sourceKey":"patel-wadi-road-malad-west-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Patel wadi Road , Malad (West)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"On Hold","startDate":null,"endDate":"2026-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"patelwadi-road-from-patelwadi-gate-to-tabela-pjc-communication-l-2023-12-09","sourceKey":"patelwadi-road-from-patelwadi-gate-to-tabela-pjc-communication-l-2023-12-09","firstSeen":"2026-07-04","state":{"roadName":"Patelwadi Road from Patelwadi Gate to Tabela, PJC Communication","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-09","endDate":"2025-01-26","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pathakwadi-road-c-2026-10-01","sourceKey":"pathakwadi-road-c-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pathakwadi Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"patilwadi-market-road-m-e-2024-01-10","sourceKey":"patilwadi-market-road-m-e-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"Patilwadi Market Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-01-10","endDate":"2025-05-25","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"patrakar-kanti-bhatt-road-dev-nagar-cross-road-r-c-2024-10-01","sourceKey":"patrakar-kanti-bhatt-road-dev-nagar-cross-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Patrakar Kanti Bhatt Road (Dev Nagar cross Road)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"patthe-bapurao-marg-low-level-sankalp-sidhi-d-x","sourceKey":"patthe-bapurao-marg-low-level-sankalp-sidhi-d-x","firstSeen":"2026-07-04","state":{"roadName":"Patthe Bapurao Marg (Low Level Sankalp Sidhi)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-15","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pawan-baug-road-goregaon-west-p-s-2024-10-10","sourceKey":"pawan-baug-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Pawan Baug Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2026-05-31","lengthM":491,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pawandham-road-r-c-2024-10-01","sourceKey":"pawandham-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pawandham Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"peripheral-road-of-five-garden-f-n-2025-11-04","sourceKey":"peripheral-road-of-five-garden-f-n-2025-11-04","firstSeen":"2026-07-04","state":{"roadName":"Peripheral road of Five Garden","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2025-11-04","endDate":"2026-05-31","lengthM":277,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"perry-cross-road-ext-h-w-2024-10-19","sourceKey":"perry-cross-road-ext-h-w-2024-10-19","firstSeen":"2026-07-04","state":{"roadName":"Perry cross road Ext","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-19","endDate":"2026-03-06","lengthM":304,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pestom-sagar-road-no-1-from-m-g-road-junction-to-pestom-sagar-road-no-2-junction-m-w-2025-10-01","sourceKey":"pestom-sagar-road-no-1-from-m-g-road-junction-to-pestom-sagar-road-no-2-junction-m-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pestom Sagar Road No. 1 from M. G. Road junction to Pestom Sagar Road No. 2 junction","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-30","lengthM":226,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pestom-sagar-road-no-2-from-m-g-road-junction-to-skanda-bldg-m-w-2025-12-15","sourceKey":"pestom-sagar-road-no-2-from-m-g-road-junction-to-skanda-bldg-m-w-2025-12-15","firstSeen":"2026-07-04","state":{"roadName":"Pestom Sagar Road No. 2 from M. G. Road junction to Skanda Bldg.","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-12-15","endDate":"2026-12-31","lengthM":210,"pqcPercentProgress":51.16,"pqcCompletedOn":null},"changes":[]},
{"id":"pestonji-stt-a-2024-12-19","sourceKey":"pestonji-stt-a-2024-12-19","firstSeen":"2026-07-04","state":{"roadName":"Pestonji Stt.","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-19","endDate":"2025-03-31","lengthM":74.1,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pimpleshwar-mahadev-mandir-marg-k-e-2024-10-01","sourceKey":"pimpleshwar-mahadev-mandir-marg-k-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pimpleshwar Mahadev Mandir Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-11","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pimpri-pada-road-from-bhanushali-complex-to-morya-compound-p-n-x","sourceKey":"pimpri-pada-road-from-bhanushali-complex-to-morya-compound-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Pimpri Pada road from Bhanushali Complex to Morya Compound","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":305,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"play-ground-road-vile-parle-k-e-2025-11-15","sourceKey":"play-ground-road-vile-parle-k-e-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Play Ground Road Vile Parle","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-15","endDate":"2026-05-14","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pmgp-internal-road-m-e-2025-10-15","sourceKey":"pmgp-internal-road-m-e-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"PMGP Internal Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-15","endDate":"2027-04-30","lengthM":330,"pqcPercentProgress":18.18,"pqcCompletedOn":null},"changes":[]},
{"id":"pmp-road-goregaon-e-p-s-2023-11-01","sourceKey":"pmp-road-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"PMP Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"poddar-road-circle-patch-malad-e-p-n-2024-10-24","sourceKey":"poddar-road-circle-patch-malad-e-p-n-2024-10-24","firstSeen":"2026-07-04","state":{"roadName":"Poddar Road Circle Patch, Malad (E )","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-24","endDate":"2026-05-31","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"poddar-road-h-w-2025-01-01","sourceKey":"poddar-road-h-w-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Poddar Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-01","endDate":"2026-05-10","lengthM":445,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"poddar-road-patch-malad-e-p-n-2025-12-10","sourceKey":"poddar-road-patch-malad-e-p-n-2025-12-10","firstSeen":"2026-07-04","state":{"roadName":"Poddar Road Patch, Malad (E)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-12-10","endDate":"2026-05-31","lengthM":62,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"police-quarters-lane-k-e-2025-10-06","sourceKey":"police-quarters-lane-k-e-2025-10-06","firstSeen":"2026-07-04","state":{"roadName":"Police Quarters Lane","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-06","endDate":"2026-10-30","lengthM":184,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"police-station-road-no-2-nehru-nagar-l-x","sourceKey":"police-station-road-no-2-nehru-nagar-l-x","firstSeen":"2026-09-29","state":{"roadName":"Police station road no 2,nehru nagar","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"police-station-road-no1-nehru-nagar-l-x","sourceKey":"police-station-road-no1-nehru-nagar-l-x","firstSeen":"2026-09-29","state":{"roadName":"Police station road no1,nehru nagar","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"popatlal-oza-marg-f-s-2025-11-10","sourceKey":"popatlal-oza-marg-f-s-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"Popatlal Oza Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-10","endDate":"2026-05-31","lengthM":42,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"popatwadi-road-c-2025-11-05","sourceKey":"popatwadi-road-c-2025-11-05","firstSeen":"2026-07-04","state":{"roadName":"Popatwadi Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-05","endDate":"2026-05-15","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"porbandar-complex-road-t-2024-12-21","sourceKey":"porbandar-complex-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Porbandar Complex Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2025-03-29","lengthM":216,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"post-gully-g-n-2025-01-03","sourceKey":"post-gully-g-n-2025-01-03","firstSeen":"2026-07-04","state":{"roadName":"Post Gully","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-01-03","endDate":"2025-04-12","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"post-office-road-m-e-2026-02-25","sourceKey":"post-office-road-m-e-2026-02-25","firstSeen":"2026-07-04","state":{"roadName":"Post Office Road","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2026-02-25","endDate":"2026-05-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"post-office-road-malad-e-p-n-2024-10-01","sourceKey":"post-office-road-malad-e-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Post Office Road, Malad (E)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"post-office-road-r-c-2025-02-01","sourceKey":"post-office-road-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Post Office Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2026-05-31","lengthM":118,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"postal-colony-lane-no-2-m-w-2024-10-10","sourceKey":"postal-colony-lane-no-2-m-w-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Postal Colony Lane No.2","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-10-10","endDate":"2024-11-11","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"postal-colony-road-starting-opposite-to-amardham-shmashaan-bhumi-to-r-c-marg-m-w-x","sourceKey":"postal-colony-road-starting-opposite-to-amardham-shmashaan-bhumi-to-r-c-marg-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Postal Colony Road starting opposite to Amardham Shmashaan Bhumi To R.C. Marg","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":525,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"prabhat-vyayamshala-marg-h-e-2026-02-20","sourceKey":"prabhat-vyayamshala-marg-h-e-2026-02-20","firstSeen":"2026-07-04","state":{"roadName":"Prabhat Vyayamshala Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2026-02-20","endDate":"2026-05-09","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"prabodhankar-thakarey-road-side-strip-p-s-2026-02-16","sourceKey":"prabodhankar-thakarey-road-side-strip-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"Prabodhankar Thakarey Road (Side Strip)","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pragati-nagar-road-goregaon-west-p-s-2025-10-01","sourceKey":"pragati-nagar-road-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Pragati Nagar road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":68,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"prajapati-road-lbs-to-kale-marg-l-2025-01-10","sourceKey":"prajapati-road-lbs-to-kale-marg-l-2025-01-10","firstSeen":"2026-07-04","state":{"roadName":"Prajapati Road ( LBS to Kale Marg)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-10","endDate":"2025-05-31","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"prakashwadi-road-bajaj-road-k-e-2024-10-03","sourceKey":"prakashwadi-road-bajaj-road-k-e-2024-10-03","firstSeen":"2026-07-04","state":{"roadName":"Prakashwadi road ( Bajaj Road)","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-03","endDate":"2025-05-31","lengthM":327,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pramila-nagar-road-dahisar-west-r-n-2023-10-27","sourceKey":"pramila-nagar-road-dahisar-west-r-n-2023-10-27","firstSeen":"2026-07-04","state":{"roadName":"Pramila Nagar Road, Dahisar (West)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-27","endDate":"2024-03-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pramod-pednekar-road-road-no-6-f-s-2025-11-15","sourceKey":"pramod-pednekar-road-road-no-6-f-s-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Pramod Pednekar Road (Road No.6)","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-15","endDate":"2026-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"pramod-tanna-road-kandivali-east-r-s-2026-10-01","sourceKey":"pramod-tanna-road-kandivali-east-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Pramod Tanna Road Kandivali East","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2026-11-30","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pranay-nagar-road-borivali-west-r-c-2023-12-08","sourceKey":"pranay-nagar-road-borivali-west-r-c-2023-12-08","firstSeen":"2026-07-04","state":{"roadName":"PRANAY NAGAR ROAD,\r\n Borivali(West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-08","endDate":"2024-05-31","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"prarthana-samaj-cross-road-k-e-2023-10-04","sourceKey":"prarthana-samaj-cross-road-k-e-2023-10-04","firstSeen":"2026-07-04","state":{"roadName":"Prarthana Samaj Cross Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-04","endDate":"2024-05-18","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pratikshanagar-road-no-13-f-n-x","sourceKey":"pratikshanagar-road-no-13-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Pratikshanagar Road no 13","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2027-05-29","lengthM":278,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pratikshanagar-road-no-14-f-n-x","sourceKey":"pratikshanagar-road-no-14-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Pratikshanagar Road no 14","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2026-05-20","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pratikshanagar-road-no-15-f-n-x","sourceKey":"pratikshanagar-road-no-15-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Pratikshanagar Road no 15","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2027-05-30","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pravin-rami-marg-kandivali-w-r-s-2023-11-01","sourceKey":"pravin-rami-marg-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Pravin Rami Marg, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pravin-sanghvi-road-kandivali-w-r-s-2026-01-01","sourceKey":"pravin-sanghvi-road-kandivali-w-r-s-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Pravin Sanghvi Road , Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2026-01-01","endDate":"2027-04-30","lengthM":640,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"premaji-nagar-road-r-n-2024-10-10","sourceKey":"premaji-nagar-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Premaji Nagar Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":257,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"premier-road-amar-nagar-municipal-clinic-to-kohinoor-mall-l-2024-03-10","sourceKey":"premier-road-amar-nagar-municipal-clinic-to-kohinoor-mall-l-2024-03-10","firstSeen":"2026-07-04","state":{"roadName":"premier road (amar nagar municipal clinic to kohinoor mall)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-03-10","endDate":"2025-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"premier-road-side-strips-l-2024-11-11","sourceKey":"premier-road-side-strips-l-2024-11-11","firstSeen":"2026-07-04","state":{"roadName":"Premier Road Side Strips","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-11-11","endDate":"2026-05-31","lengthM":1980,"pqcPercentProgress":53.38,"pqcCompletedOn":"2026-01-16"},"changes":[]},
{"id":"premjyot-society-road-m-e-2025-10-01","sourceKey":"premjyot-society-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Premjyot Society Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-04-25","lengthM":400,"pqcPercentProgress":97.75,"pqcCompletedOn":null},"changes":[]},
{"id":"prerna-nagar-road-borivali-west-r-c-2023-12-08","sourceKey":"prerna-nagar-road-borivali-west-r-c-2023-12-08","firstSeen":"2026-07-04","state":{"roadName":"PRERNA NAGAR ROAD,\r\n Borivali(West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-08","endDate":"2024-12-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"principal-mandlecha-marg-from-st-anthony-road-to-shubhash-nagar-road-m-w-2024-01-10","sourceKey":"principal-mandlecha-marg-from-st-anthony-road-to-shubhash-nagar-road-m-w-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"Principal mandlecha marg from st anthony road to shubhash nagar road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-10","endDate":"2025-12-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"principal-tasadduk-husain-marg-side-stripe-l-2023-11-01","sourceKey":"principal-tasadduk-husain-marg-side-stripe-l-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Principal Tasadduk Husain Marg Side Stripe","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":425,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-01","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"principal-vamanrao-mahadik-road-f-s-x","sourceKey":"principal-vamanrao-mahadik-road-f-s-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Principal Vamanrao Mahadik Road","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-15","endDate":"2026-05-31","lengthM":150,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"On Hold","to":"In Progress"},{"on":"2026-10-10","field":"startDate","from":null,"to":"2025-11-15"}]},
{"id":"prof-shaikh-hasan-marg-1-1st-flank-road-b-2026-01-01","sourceKey":"prof-shaikh-hasan-marg-1-1st-flank-road-b-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Prof.Shaikh Hasan Marg-1 (1st Flank Road)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-01-01","endDate":"2026-02-12","lengthM":122,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"prof-shaikh-hasan-marg-2-2nd-flank-road-b-2025-02-10","sourceKey":"prof-shaikh-hasan-marg-2-2nd-flank-road-b-2025-02-10","firstSeen":"2026-07-04","state":{"roadName":"Prof.Shaikh Hasan Marg-2 (2nd Flank Road)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-02-10","endDate":null,"lengthM":159,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"prof-u-u-bhat-road-f-n-2025-01-25","sourceKey":"prof-u-u-bhat-road-f-n-2025-01-25","firstSeen":"2026-07-04","state":{"roadName":"Prof U U Bhat Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-25","endDate":"2026-05-31","lengthM":196,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pumping-station-road-off-l-b-s-road-l-2024-10-03","sourceKey":"pumping-station-road-off-l-b-s-road-l-2024-10-03","firstSeen":"2026-07-04","state":{"roadName":"Pumping Station Road , Off L.B.S Road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-03","endDate":"2025-03-31","lengthM":75,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pune-street-b-2025-01-15","sourceKey":"pune-street-b-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"Pune Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-01-15","endDate":"2026-04-30","lengthM":315,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"punjabi-lane-r-c-2024-12-01","sourceKey":"punjabi-lane-r-c-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Punjabi Lane","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"purshottom-thakurdas-marg-a-2024-11-15","sourceKey":"purshottom-thakurdas-marg-a-2024-11-15","firstSeen":"2026-07-04","state":{"roadName":"Purshottom Thakurdas Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-15","endDate":"2025-05-31","lengthM":212.3,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pushpa-park-road-number-3-malad-east-p-n-2023-10-18","sourceKey":"pushpa-park-road-number-3-malad-east-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Pushpa Park Road Number 3 ,Malad( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2024-05-01","lengthM":440,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"pushpavatika-road-r-n-2024-10-10","sourceKey":"pushpavatika-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Pushpavatika Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-03-31","lengthM":127,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"quarry-road-bhandup-west-s-2026-01-01","sourceKey":"quarry-road-bhandup-west-s-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Quarry Road, Bhandup West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2027-05-31","lengthM":1200,"pqcPercentProgress":8.33,"pqcCompletedOn":"2027-01-21"},"changes":[]},
{"id":"r-b-mehta-side-strip-ghatkopar-e-n-2024-12-02","sourceKey":"r-b-mehta-side-strip-ghatkopar-e-n-2024-12-02","firstSeen":"2026-07-04","state":{"roadName":"R.B. Mehta side strip,Ghatkopar(E)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-12-02","endDate":"2026-05-31","lengthM":1440,"pqcPercentProgress":84.17,"pqcCompletedOn":null},"changes":[]},
{"id":"r-c-patel-road-r-c-2024-11-15","sourceKey":"r-c-patel-road-r-c-2024-11-15","firstSeen":"2026-07-04","state":{"roadName":"R.C Patel Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-15","endDate":"2025-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"r-k-mission-road-h-w-2024-01-01","sourceKey":"r-k-mission-road-h-w-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"R K Mission Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"r-k-patkar-road-junction-h-w-2024-02-01","sourceKey":"r-k-patkar-road-junction-h-w-2024-02-01","firstSeen":"2026-07-04","state":{"roadName":"R K Patkar Road junction","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-02-01","endDate":"2024-05-31","lengthM":25,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"r-k-singh-road-k-e-2025-10-13","sourceKey":"r-k-singh-road-k-e-2025-10-13","firstSeen":"2026-07-04","state":{"roadName":"R K Singh Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-13","endDate":"2026-05-31","lengthM":590,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"r-n-gandhi-marg-n-2024-11-26","sourceKey":"r-n-gandhi-marg-n-2024-11-26","firstSeen":"2026-07-04","state":{"roadName":"R.N.Gandhi Marg","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-26","endDate":"2026-05-31","lengthM":323,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"r-n-narkar-marg-carriageway-with-sidestrip-n-2025-11-01","sourceKey":"r-n-narkar-marg-carriageway-with-sidestrip-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"R N Narkar Marg (Carriageway with Sidestrip)","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-11-01","endDate":"2027-02-28","lengthM":220,"pqcPercentProgress":31.82,"pqcCompletedOn":null},"changes":[]},
{"id":"r-s-naik-cross-road-e-2024-11-08","sourceKey":"r-s-naik-cross-road-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"R. S. Naik Cross Road","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-08","endDate":"2026-01-05","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"r-s-sapre-marg-c-2024-11-20","sourceKey":"r-s-sapre-marg-c-2024-11-20","firstSeen":"2026-07-04","state":{"roadName":"R S Sapre Marg","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-20","endDate":"2025-11-22","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"r-t-o-office-road-r-n-2024-10-01","sourceKey":"r-t-o-office-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"R.T.O. Office Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":543,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"radhabai-mhatre-road-r-n-2025-10-01","sourceKey":"radhabai-mhatre-road-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Radhabai Mhatre Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":146,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"radhakunj-x-road-malad-e-p-n-2024-10-01","sourceKey":"radhakunj-x-road-malad-e-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Radhakunj X Road, Malad (E)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"radhe-maa-palace-road-r-c-2025-02-01","sourceKey":"radhe-maa-palace-road-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Radhe Maa Palace Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rafi-nagar-road-from-rafi-nagar-school-junction-to-baba-nagar-road-m-e-2025-10-17","sourceKey":"rafi-nagar-road-from-rafi-nagar-school-junction-to-baba-nagar-road-m-e-2025-10-17","firstSeen":"2026-07-04","state":{"roadName":"Rafi Nagar road (From Rafi nagar school Junction to Baba Nagar road)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-17","endDate":"2027-03-30","lengthM":430,"pqcPercentProgress":58.14,"pqcCompletedOn":null},"changes":[]},
{"id":"raghavan-pannikar-road-goregaon-west-p-s-2024-11-15","sourceKey":"raghavan-pannikar-road-goregaon-west-p-s-2024-11-15","firstSeen":"2026-07-04","state":{"roadName":"Raghavan Pannikar Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-11-15","endDate":"2025-05-31","lengthM":224,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"raghavji-road-d-x","sourceKey":"raghavji-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Raghavji Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2026-04-22","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"Not Started","to":"On Hold"}]},
{"id":"raghavji-tank-road-humera-park-to-triveni-nagar-road-malad-east-p-n-2023-11-20","sourceKey":"raghavji-tank-road-humera-park-to-triveni-nagar-road-malad-east-p-n-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Raghavji Tank road & Humera park to Triveni nagar road , Malad ( East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-20","endDate":"2026-05-31","lengthM":395,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"raghunath-dadaji-street-a-2025-10-01","sourceKey":"raghunath-dadaji-street-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Raghunath Dadaji Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rahat-apartment-road-l-x","sourceKey":"rahat-apartment-road-l-x","firstSeen":"2026-07-04","state":{"roadName":"Rahat Apartment Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"raheja-complex-weh-to-rizvi-oak-bldg-p-n-2023-11-11","sourceKey":"raheja-complex-weh-to-rizvi-oak-bldg-p-n-2023-11-11","firstSeen":"2026-07-04","state":{"roadName":"Raheja complex WEH to Rizvi Oak Bldg.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-11","endDate":"2026-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"raheja-lane-seven-bunglows-k-w-2025-10-10","sourceKey":"raheja-lane-seven-bunglows-k-w-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Raheja Lane, Seven Bunglows","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-10-10","endDate":"2026-03-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rahul-nagar-road-nr-shastri-nagar-t-2025-01-01","sourceKey":"rahul-nagar-road-nr-shastri-nagar-t-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Rahul Nagar Road (Nr Shastri Nagar)","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-01-01","endDate":"2026-02-02","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"raichur-street-b-2025-01-15","sourceKey":"raichur-street-b-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"Raichur Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-01-15","endDate":"2026-05-31","lengthM":295,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"railway-police-quarters-dp-road-n-x","sourceKey":"railway-police-quarters-dp-road-n-x","firstSeen":"2026-07-04","state":{"roadName":"Railway Police Quarters DP Road","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"raja-dalavi-marg-r-c-2024-10-01","sourceKey":"raja-dalavi-marg-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Raja Dalavi Marg","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":281,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rajaram-darekar-marg-h-e-2024-10-01","sourceKey":"rajaram-darekar-marg-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Rajaram Darekar Marg","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-21","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rajaram-tawade-road-r-n-2025-10-01","sourceKey":"rajaram-tawade-road-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Rajaram Tawade Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-06-09","lengthM":268,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rajawadi-pipeline-road-n-2024-11-25","sourceKey":"rajawadi-pipeline-road-n-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Rajawadi Pipeline Road","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-25","endDate":"2026-05-15","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rajendra-kamble-road-h-e-2023-11-24","sourceKey":"rajendra-kamble-road-h-e-2023-11-24","firstSeen":"2026-07-04","state":{"roadName":"Rajendra Kamble Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2023-11-24","endDate":"2026-05-16","lengthM":590,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"rajendra-nagar-dp-road-narhari-sonar-road-r-c-2025-12-01","sourceKey":"rajendra-nagar-dp-road-narhari-sonar-road-r-c-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Rajendra Nagar DP Road(Narhari Sonar Road)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-12-01","endDate":"2026-03-19","lengthM":202,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rajiv-gandhi-institute-k-w-2023-04-03","sourceKey":"rajiv-gandhi-institute-k-w-2023-04-03","firstSeen":"2026-07-04","state":{"roadName":"Rajiv Gandhi Institute","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-04-03","endDate":"2024-05-24","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rajiv-gandhi-maidan-road-goregaon-w-p-s-2023-12-01","sourceKey":"rajiv-gandhi-maidan-road-goregaon-w-p-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Rajiv Gandhi Maidan Road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2023-12-01","endDate":"2026-05-31","lengthM":505,"pqcPercentProgress":90.1,"pqcCompletedOn":null},"changes":[]},
{"id":"raju-badekar-marg-jai-durga-seva-mandal-to-municipal-utkal-school-l-x","sourceKey":"raju-badekar-marg-jai-durga-seva-mandal-to-municipal-utkal-school-l-x","firstSeen":"2026-07-04","state":{"roadName":"Raju badekar marg jai durga seva mandal to municipal utkal school.","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2026-05-31","lengthM":115,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"raju-badekar-marg-l-2025-02-24","sourceKey":"raju-badekar-marg-l-2025-02-24","firstSeen":"2026-07-04","state":{"roadName":"Raju badekar marg","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-02-24","endDate":"2026-05-31","lengthM":467,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rajwadkar-stt-a-2025-10-15","sourceKey":"rajwadkar-stt-a-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Rajwadkar Stt.","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-15","endDate":"2026-05-31","lengthM":50,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-18","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-09-18","field":"startDate","from":"2025-10-15","to":null},{"on":"2026-10-14","field":"status","from":"Deleted","to":"Completed"},{"on":"2026-10-14","field":"startDate","from":null,"to":"2025-10-15"}],"deletions":[{"on":"2026-09-18","before":{"roadName":"Rajwadkar Stt.","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-15","endDate":"2026-05-31","lengthM":220,"pqcPercentProgress":22.73,"pqcCompletedOn":null}}],"aliases":["rajwadkar-stt-a-x"]},
{"id":"rajyogi-jaymalsingh-marg-f-n-2024-12-10","sourceKey":"rajyogi-jaymalsingh-marg-f-n-2024-12-10","firstSeen":"2026-07-04","state":{"roadName":"Rajyogi Jaymalsingh Marg","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-10","endDate":"2026-05-31","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ram-baugh-road-p-n-2024-10-01","sourceKey":"ram-baugh-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RAM BAUGH ROAD","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-15","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ram-gully-road-kandivali-w-r-s-2023-11-24","sourceKey":"ram-gully-road-kandivali-w-r-s-2023-11-24","firstSeen":"2026-07-04","state":{"roadName":"Ram gully Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-24","endDate":"2024-05-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ram-mandir-rd-l-t-road-to-5th-rd-r-c-2024-10-01","sourceKey":"ram-mandir-rd-l-t-road-to-5th-rd-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ram Mandir Rd ( L.T.Road to 5th Rd )","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-03","lengthM":497,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ram-maruti-cross-road-g-n-x","sourceKey":"ram-maruti-cross-road-g-n-2025-10-08","firstSeen":"2026-07-04","state":{"roadName":"Ram Maruti Cross Road","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-08","endDate":"2026-05-31","lengthM":90,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-09","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-09","field":"startDate","from":null,"to":"2025-10-08"}]},
{"id":"ram-tekdi-marg-f-s-2025-11-01","sourceKey":"ram-tekdi-marg-f-s-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Ram Tekdi Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-01","endDate":"2027-04-30","lengthM":420,"pqcPercentProgress":21.9,"pqcCompletedOn":null},"changes":[]},
{"id":"ramabai-chemburkar-marg-k-e-x","sourceKey":"ramabai-chemburkar-marg-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Ramabai Chemburkar Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ramabai-colony-road-no-1-n-x","sourceKey":"ramabai-colony-road-no-1-n-x","firstSeen":"2026-07-04","state":{"roadName":"Ramabai Colony Road No. 1","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ramanath-parkar-marg-h-e-2023-10-01","sourceKey":"ramanath-parkar-marg-h-e-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ramanath Parkar Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-05-30","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rambaan-path-ghatkopar-east-n-2023-10-25","sourceKey":"rambaan-path-ghatkopar-east-n-2023-10-25","firstSeen":"2026-07-04","state":{"roadName":"Rambaan Path, Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-25","endDate":"2026-01-01","lengthM":251,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rambaug-lane-borivali-west-r-c-2023-04-16","sourceKey":"rambaug-lane-borivali-west-r-c-2023-04-16","firstSeen":"2026-07-04","state":{"roadName":"Rambaug lane, Borivali (West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-04-16","endDate":"2024-11-30","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rambaug-lane-powai-s-2023-12-27","sourceKey":"rambaug-lane-powai-s-2023-12-27","firstSeen":"2026-07-04","state":{"roadName":"Rambaug Lane, Powai","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-27","endDate":"2024-05-30","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rambhau-salgavkar-road-a-x","sourceKey":"rambhau-salgavkar-road-a-x","firstSeen":"2026-10-13","state":{"roadName":"Rambhau salgavkar Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ramchandra-lane-and-evershine-nagar-extensions-of-mutumari-nagar-p-n-2024-10-01","sourceKey":"ramchandra-lane-and-evershine-nagar-extensions-of-mutumari-nagar-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ramchandra Lane and evershine nagar extensions of Mutumari Nagar","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":1937,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ramchandra-lane-p-n-2025-02-01","sourceKey":"ramchandra-lane-p-n-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Ramchandra Lane","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-01","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ramdeo-maurya-marg-gmlr-to-taxi-stand-road-m-e-2025-10-01","sourceKey":"ramdeo-maurya-marg-gmlr-to-taxi-stand-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ramdeo Maurya Marg (GMLR to Taxi Stand Road)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-01-31","lengthM":555,"pqcPercentProgress":13.51,"pqcCompletedOn":null},"changes":[]},
{"id":"ramji-ashar-gulli-n-2024-12-01","sourceKey":"ramji-ashar-gulli-n-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Ramji Ashar Gulli","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-01","endDate":"2025-12-31","lengthM":113,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rammandir-road-vile-parle-k-e-x","sourceKey":"rammandir-road-vile-parle-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Rammandir  Road Vile Parle","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ramnath-goenka-road-a-2024-11-17","sourceKey":"ramnath-goenka-road-a-2024-11-17","firstSeen":"2026-07-04","state":{"roadName":"Ramnath Goenka Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-17","endDate":"2025-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ramtekdi-cross-road-f-s-x","sourceKey":"ramtekdi-cross-road-f-s-x","firstSeen":"2026-07-04","state":{"roadName":"Ramtekdi Cross Road","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2027-04-23","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ranchhodas-road-r-n-2024-10-01","sourceKey":"ranchhodas-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Ranchhodas Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":133,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"randhir-vihar-road-near-open-gym-near-ashok-kedare-chowk-s-2024-12-01","sourceKey":"randhir-vihar-road-near-open-gym-near-ashok-kedare-chowk-s-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Randhir Vihar Road near open gym, Near Ashok Kedare chowk","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-01","endDate":"2025-05-14","lengthM":55,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rane-bunglow-junction-road-k-e-2024-03-04","sourceKey":"rane-bunglow-junction-road-k-e-2024-03-04","firstSeen":"2026-07-04","state":{"roadName":"Rane Bunglow junction Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-03-04","endDate":"2025-11-04","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rane-chawl-road-m-e-x","sourceKey":"rane-chawl-road-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Rane Chawl Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rangnath-housig-road-goregaon-e-p-s-x","sourceKey":"rangnath-housig-road-goregaon-e-p-s-x","firstSeen":"2026-07-04","state":{"roadName":"Rangnath Housig Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":440,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rangnath-keskar-road-dahisar-w-r-n-2025-10-05","sourceKey":"rangnath-keskar-road-dahisar-w-r-n-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Rangnath Keskar Road, Dahisar(W)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-05","endDate":"2026-02-18","lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ranjana-deshmukh-marg-f-s-2025-02-21","sourceKey":"ranjana-deshmukh-marg-f-s-2025-02-21","firstSeen":"2026-07-04","state":{"roadName":"Ranjana Deshmukh Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-02-21","endDate":"2025-05-31","lengthM":112,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rasul-jiva-compound-road-e-2026-04-06","sourceKey":"rasul-jiva-compound-road-e-x","firstSeen":"2026-07-04","state":{"roadName":"Rasul Jiva Compound Road","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-12-31","lengthM":177,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"In Progress","to":"Not Started"},{"on":"2026-10-28","field":"startDate","from":"2026-04-06","to":null}]},
{"id":"ratansi-chapsi-marg-c-2025-12-05","sourceKey":"ratansi-chapsi-marg-c-2025-12-05","firstSeen":"2026-07-04","state":{"roadName":"Ratansi Chapsi Marg","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-12-05","endDate":"2026-05-31","lengthM":77.3,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rationing-office-road-r-c-2025-02-01","sourceKey":"rationing-office-road-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Rationing Office Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2026-03-31","lengthM":176,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rdp-10-charkop-sector-6-link-road-to-rdp-7-r-c-2023-11-01","sourceKey":"rdp-10-charkop-sector-6-link-road-to-rdp-7-r-c-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"RDP-10 Charkop, Sector-6 ( Link Road to RDP 7)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-11-01","endDate":"2026-05-25","lengthM":685,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Completed","to":"In Progress"}]},
{"id":"rdp-12th-road-r-c-2023-11-20","sourceKey":"rdp-12th-road-r-c-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"RDP 12th Road","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-20","endDate":"2025-05-31","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rebello-road-h-w-2024-10-10","sourceKey":"rebello-road-h-w-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Rebello Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-10","endDate":"2026-05-19","lengthM":552,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"redwood-teakwood-road-t-2024-12-21","sourceKey":"redwood-teakwood-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Redwood Teakwood Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-12-21","endDate":"2026-05-24","lengthM":450,"pqcPercentProgress":66.67,"pqcCompletedOn":null},"changes":[]},
{"id":"remaining-portion-of-upper-govind-nagar-goregaon-east-p-s-2025-10-01","sourceKey":"remaining-portion-of-upper-govind-nagar-goregaon-east-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Remaining portion of Upper Govind Nagar, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":207,"pqcPercentProgress":57.97,"pqcCompletedOn":null},"changes":[]},
{"id":"resurfacing-of-panjarapol-junction-in-mastic-asphalt-m-w-2026-02-01","sourceKey":"resurfacing-of-panjarapol-junction-in-mastic-asphalt-m-w-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Resurfacing of Panjarapol Junction in Mastic Asphalt","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Completed","startDate":"2026-02-01","endDate":"2027-01-31","lengthM":530.3,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"revdankar-road-k-w-2024-10-01","sourceKey":"revdankar-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Revdankar Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rhb-road-side-strips-t-2023-12-09","sourceKey":"rhb-road-side-strips-t-2023-12-09","firstSeen":"2026-07-04","state":{"roadName":"RHB Road (Side Strips)","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-09","endDate":"2024-05-01","lengthM":510,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"river-valley-road-r-n-2024-10-01","sourceKey":"river-valley-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"River Valley Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":147,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rizvi-complex-road-no-4-h-w-2024-10-18","sourceKey":"rizvi-complex-road-no-4-h-w-2024-10-18","firstSeen":"2026-07-04","state":{"roadName":"Rizvi Complex Road No. 4","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-18","endDate":"2025-05-31","lengthM":283,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rk-vaidya-marg-g-n-2025-10-08","sourceKey":"rk-vaidya-marg-g-n-2025-10-08","firstSeen":"2026-07-04","state":{"roadName":"RK Vaidya Marg","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-08","endDate":"2027-05-24","lengthM":320,"pqcPercentProgress":42.19,"pqcCompletedOn":null},"changes":[]},
{"id":"road-along-tilak-udyan-01-k-w-2024-10-01","sourceKey":"road-along-tilak-udyan-01-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road along tilak udyan 01","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-along-tilak-udyan-02-k-w-2024-10-01","sourceKey":"road-along-tilak-udyan-02-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road along tilak udyan 02","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-behind-batra-petrol-pupm-sakinaka-l-2024-03-10","sourceKey":"road-behind-batra-petrol-pupm-sakinaka-l-2024-03-10","firstSeen":"2026-07-04","state":{"roadName":"Road behind Batra petrol pupm, sakinaka","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-03-10","endDate":"2025-05-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-behind-sarvoday-hospital-n-2024-11-12","sourceKey":"road-behind-sarvoday-hospital-n-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"Road behind Sarvoday Hospital","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-12","endDate":"2025-05-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-below-mrunaltai-gore-bridge-goregaon-e-p-s-2023-11-01","sourceKey":"road-below-mrunaltai-gore-bridge-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road below Mrunaltai Gore Bridge, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-25","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-below-mrunaltai-gore-bridge-goregaon-west-p-s-2024-10-10","sourceKey":"road-below-mrunaltai-gore-bridge-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Road Below Mrunaltai Gore Bridge, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2026-05-31","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-below-t-h-kataria-bridge-g-n-x","sourceKey":"road-below-t-h-kataria-bridge-g-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road Below T H Kataria Bridge","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-bet-n-a-b-block-deonar-colony-from-s-g-patil-to-nala-m-e-2024-01-10","sourceKey":"road-bet-n-a-b-block-deonar-colony-from-s-g-patil-to-nala-m-e-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"Road Bet’n A & B Block Deonar Colony (From S.G.Patil to Nala)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-01-10","endDate":"2026-05-30","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-between-chwal-no-62-to-chawl-no-67-goregaon-w-p-s-2023-11-01","sourceKey":"road-between-chwal-no-62-to-chawl-no-67-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road Between Chwal No.62 to Chawl No.67, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-01-24","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-between-chwal-no-62-to-chawl-no-68-goregaon-w-p-s-2023-11-01","sourceKey":"road-between-chwal-no-62-to-chawl-no-68-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road Between Chwal No.62 to Chawl No.68, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-01-24","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-between-pestom-sagar-road-no-4-and-6-towards-citizen-forum-garden-m-w-2024-11-14","sourceKey":"road-between-pestom-sagar-road-no-4-and-6-towards-citizen-forum-garden-m-w-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Road between Pestom Sagar Road no.4 and 6 (towards Citizen Forum Garden)","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-14","endDate":"2025-05-20","lengthM":257,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-between-r1-r2-vishnu-nagar-m-e-2025-10-01","sourceKey":"road-between-r1-r2-vishnu-nagar-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road between R1 & R2 Vishnu Nagar","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-25","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-aklr-to-targalli-l-2024-01-17","sourceKey":"road-from-aklr-to-targalli-l-2024-01-17","firstSeen":"2026-07-04","state":{"roadName":"Road from AKLR to targalli","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-17","endDate":"2025-05-31","lengthM":395,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-aklr-to-yadav-nagar-vihari-l-2025-01-01","sourceKey":"road-from-aklr-to-yadav-nagar-vihari-l-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Road from AKLR to yadav nagar vihari","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-axis-bank-to-tarapure-garden-k-w-2024-10-01","sourceKey":"road-from-axis-bank-to-tarapure-garden-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Axis Bank to Tarapure Garden","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":161,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-azad-maidan-to-maharashtra-vidyalay-road-goregaon-west-p-s-2024-10-01","sourceKey":"road-from-azad-maidan-to-maharashtra-vidyalay-road-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Azad Maidan to Maharashtra Vidyalay Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":133,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-best-bus-stop-605-to-buddha-vihar-1st-step-bhandup-west-s-2025-10-01","sourceKey":"road-from-best-bus-stop-605-to-buddha-vihar-1st-step-bhandup-west-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from BEST Bus stop 605 to Buddha Vihar 1st step, Bhandup West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":243,"pqcPercentProgress":49.38,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-bhindiwadi-naka-to-shashikant-decorators-malad-w-p-n-2023-10-18","sourceKey":"road-from-bhindiwadi-naka-to-shashikant-decorators-malad-w-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Road from Bhindiwadi Naka to Shashikant Decorators, Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2024-05-01","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-bhoomi-valley-udyan-to-dead-end-kandivali-e-r-s-2026-10-01","sourceKey":"road-from-bhoomi-valley-udyan-to-dead-end-kandivali-e-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Road from Bhoomi Valley udyan to Dead end, Kandivali(E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2026-11-30","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-bldg-no-29-to-pmgp-colony-to-90-feet-road-m-e-2023-12-20","sourceKey":"road-from-bldg-no-29-to-pmgp-colony-to-90-feet-road-m-e-2023-12-20","firstSeen":"2026-07-04","state":{"roadName":"Road from Bldg no.29 to PMGP Colony to 90' Feet Road","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-20","endDate":"2025-05-31","lengthM":42,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-building-no-17-to-ashok-pisal-ground-f-n-2024-12-18","sourceKey":"road-from-building-no-17-to-ashok-pisal-ground-f-n-2024-12-18","firstSeen":"2026-07-04","state":{"roadName":"Road from Building no 17 to Ashok Pisal Ground","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-12-18","endDate":"2025-04-10","lengthM":82,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-c-g-road-to-julianwadi-sharadwadi-m-e-x","sourceKey":"road-from-c-g-road-to-julianwadi-sharadwadi-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from C.G.Road to Julianwadi, Sharadwadi","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-03-10","lengthM":250,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-14","field":"startDate","from":null,"to":"2025-10-01"}]},
{"id":"road-from-c-g-road-to-m-s-bldg-no-24-m-w-2026-10-01","sourceKey":"road-from-c-g-road-to-m-s-bldg-no-24-m-w-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from C. G. Road to M. S. Bldg. No. 24","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-10-01","endDate":"2027-05-05","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-cardinal-gracious-school-road-to-western-express-highway-service-road-h-e-2025-12-03","sourceKey":"road-from-cardinal-gracious-school-road-to-western-express-highway-service-road-h-e-2025-12-03","firstSeen":"2026-07-04","state":{"roadName":"Road from Cardinal Gracious School Road to Western Express Highway Service Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-03","endDate":"2026-01-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-church-road-to-sunni-masjid-valmiki-apt-k-e-2024-11-01","sourceKey":"road-from-church-road-to-sunni-masjid-valmiki-apt-k-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Church Road to Sunni Masjid / Valmiki Apt.","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-03-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-db-more-road-to-road-no-04-goregaon-west-p-s-2025-10-01","sourceKey":"road-from-db-more-road-to-road-no-04-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road From DB More Road to Road No.04, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-28","lengthM":136,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-dheeraj-ganga-society-to-rejoice-school-and-datta-mandir-road-p-n-2023-10-18","sourceKey":"road-from-dheeraj-ganga-society-to-rejoice-school-and-datta-mandir-road-p-n-2023-10-18","firstSeen":"2026-07-04","state":{"roadName":"Road From Dheeraj Ganga Society to Rejoice School and Datta mandir road.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-18","endDate":"2024-05-01","lengthM":630,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-dr-b-a-road-to-s-m-jadhav-road-bmc-school-hindmata-f-s-2025-10-01","sourceKey":"road-from-dr-b-a-road-to-s-m-jadhav-road-bmc-school-hindmata-f-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road From Dr.B.A. Road To S.M.Jadhav Road (Bmc School Hindmata)","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":208,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-from-rcf-gate-no-3-to-walia-compound-junction-m-w-x","sourceKey":"road-from-from-rcf-gate-no-3-to-walia-compound-junction-m-w-2026-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road from from RCF Gate No. 3 to Walia Compound Junction","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-10-15","endDate":"2027-04-10","lengthM":456,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-20","field":"startDate","from":null,"to":"2026-10-15"}]},
{"id":"road-from-gajanan-maharaj-mandir-to-anmol-fortune-near-parmarth-niketan-goregaon-west-p-s-2025-01-01","sourceKey":"road-from-gajanan-maharaj-mandir-to-anmol-fortune-near-parmarth-niketan-goregaon-west-p-s-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Road From Gajanan Maharaj Mandir to Anmol fortune near Parmarth Niketan, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":173,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-ganesh-mandir-jawaharlal-nehru-road-h-e-2025-01-10","sourceKey":"road-from-ganesh-mandir-jawaharlal-nehru-road-h-e-2025-01-10","firstSeen":"2026-07-04","state":{"roadName":"Road from Ganesh Mandir - Jawaharlal Nehru Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-10","endDate":"2025-05-28","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-gawade-nagar-dahisar-east-r-n-2023-11-23","sourceKey":"road-from-gawade-nagar-dahisar-east-r-n-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Road from Gawade Nagar , Dahisar East","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-23","endDate":"2024-05-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-golibar-road-to-shilpa-bldg-n-2025-12-01","sourceKey":"road-from-golibar-road-to-shilpa-bldg-n-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Golibar Road to Shilpa Bldg","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-12-01","endDate":"2027-01-31","lengthM":150,"pqcPercentProgress":66.67,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-h-s-rupwate-road-to-laxam-kamble-road-goregaon-west-p-s-2025-03-01","sourceKey":"road-from-h-s-rupwate-road-to-laxam-kamble-road-goregaon-west-p-s-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"Road From H.S. Rupwate Road to Laxam Kamble Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-03-01","endDate":"2026-05-30","lengthM":198,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-h-s-rupwate-road-to-road-no-03-goregaon-west-p-s-2024-10-01","sourceKey":"road-from-h-s-rupwate-road-to-road-no-03-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road From H.S. Rupwate Road to Road No.03, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-hall-road-to-pillai-chowk-l-x","sourceKey":"road-from-hall-road-to-pillai-chowk-l-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Hall Road to Pillai Chowk","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":null,"lengthM":570,"pqcPercentProgress":70.18,"pqcCompletedOn":"2026-01-18"},"changes":[]},
{"id":"road-from-hall-road-to-sclr-l-2025-10-01","sourceKey":"road-from-hall-road-to-sclr-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Hall Road to SCLR","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-hemant-manjarekar-to-building-no-22-f-n-x","sourceKey":"road-from-hemant-manjarekar-to-building-no-22-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Hemant Manjarekar to Building no 22","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-hemant-manjarekar-to-punch-pushpa-society-f-n-2025-01-13","sourceKey":"road-from-hemant-manjarekar-to-punch-pushpa-society-f-n-2025-01-13","firstSeen":"2026-07-04","state":{"roadName":"Road from Hemant Manjarekar to Punch Pushpa Society","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-01-13","endDate":"2026-05-31","lengthM":164,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-hs-rupvate-road-to-ganesh-maidan-goregaon-west-p-s-2025-03-01","sourceKey":"road-from-hs-rupvate-road-to-ganesh-maidan-goregaon-west-p-s-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"Road from HS Rupvate Road to Ganesh Maidan, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-03-01","endDate":"2026-05-31","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-icici-bank-to-badarpakhadi-talav-kandivali-w-r-s-2024-10-01","sourceKey":"road-from-icici-bank-to-badarpakhadi-talav-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from ICICI Bank to Badarpakhadi Talav, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":105,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-infant-school-to-apna-ghar-society-k-e-2025-02-01","sourceKey":"road-from-infant-school-to-apna-ghar-society-k-e-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Infant School to Apna Ghar Society","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-02-01","endDate":"2026-05-11","lengthM":510,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-janardan-patil-marg-to-kaveri-bldg-m-w-2023-11-23","sourceKey":"road-from-janardan-patil-marg-to-kaveri-bldg-m-w-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Road from Janardan Patil Marg to Kaveri Bldg.","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-23","endDate":"2024-02-28","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-jankalyan-nagar-road-to-bafira-nagar-road-p-n-2026-01-13","sourceKey":"road-from-jankalyan-nagar-road-to-bafira-nagar-road-p-n-2026-01-13","firstSeen":"2026-07-04","state":{"roadName":"Road from Jankalyan Nagar Road to Bafira Nagar Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-01-13","endDate":"2026-05-31","lengthM":105,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-jp-road-no-01-to-aarey-station-road-goregaon-east-p-s-2024-10-01","sourceKey":"road-from-jp-road-no-01-to-aarey-station-road-goregaon-east-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road From JP Road No.01 to Aarey Station Road, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-28","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-kajupada-pipe-line-to-jankibai-chawl-l-2025-10-01","sourceKey":"road-from-kajupada-pipe-line-to-jankibai-chawl-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from kajupada pipe line to jankibai chawl","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-10-01","endDate":"2025-11-01","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-kranti-nagar-bridge-to-airport-wall-l-x","sourceKey":"road-from-kranti-nagar-bridge-to-airport-wall-l-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Kranti nagar bridge to Airport wall","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-01-16","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-kumkum-society-to-pratiksha-nagar-f-n-2025-10-14","sourceKey":"road-from-kumkum-society-to-pratiksha-nagar-f-n-2025-10-14","firstSeen":"2026-07-04","state":{"roadName":"Road from Kumkum Society to Pratiksha Nagar","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-10-14","endDate":"2027-05-30","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-22","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"road-from-link-road-to-kishorilal-ramuka-d-mart-goregaon-w-p-s-2023-11-01","sourceKey":"road-from-link-road-to-kishorilal-ramuka-d-mart-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Link Road to Kishorilal Ramuka (D-mart), Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-link-road-to-kishorilal-ramuka-d-mart-parellel-goregaon-w-p-s-2023-10-01","sourceKey":"road-from-link-road-to-kishorilal-ramuka-d-mart-parellel-goregaon-w-p-s-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Link Road to Kishorilal Ramuka (D-mart) parellel, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-01","endDate":"2024-01-24","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-mamtadeep-heights-to-sai-arpan-bldg-mukund-nagar-road-m-w-x","sourceKey":"road-from-mamtadeep-heights-to-sai-arpan-bldg-mukund-nagar-road-m-w-2026-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road from Mamtadeep Heights to Sai Arpan Bldg. (Mukund Nagar Road)","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-10-15","endDate":"2027-05-11","lengthM":320,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-19","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-19","field":"startDate","from":null,"to":"2026-10-15"}]},
{"id":"road-from-mangal-anand-hospital-to-emarald-club-m-w-x","sourceKey":"road-from-mangal-anand-hospital-to-emarald-club-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Mangal Anand Hospital to Emarald Club","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-04-10","lengthM":87,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-masjid-to-god-gift-tower-k-w-2024-10-01","sourceKey":"road-from-masjid-to-god-gift-tower-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from masjid to god gift tower","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-20","lengthM":500,"pqcPercentProgress":74,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-mg-to-maharashtra-vidyalay-road-goregaon-west-p-s-2025-10-01","sourceKey":"road-from-mg-to-maharashtra-vidyalay-road-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from MG to Maharashtra Vidyalay Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-midc-road-no-16-to-vrundavan-garden-road-k-e-2025-01-30","sourceKey":"road-from-midc-road-no-16-to-vrundavan-garden-road-k-e-2025-01-30","firstSeen":"2026-07-04","state":{"roadName":"Road from MIDC Road no 16 to Vrundavan Garden Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-01-30","endDate":"2025-05-31","lengthM":84,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-mogaveera-bank-to-moonlight-dairy-k-e-2025-10-01","sourceKey":"road-from-mogaveera-bank-to-moonlight-dairy-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Mogaveera Bank to Moonlight Dairy","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-15","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-nahar-sales-office-to-vijay-fire-road-l-2024-12-02","sourceKey":"road-from-nahar-sales-office-to-vijay-fire-road-l-2024-12-02","firstSeen":"2026-07-04","state":{"roadName":"Road from Nahar sales office to Vijay Fire Road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-02","endDate":"2025-05-31","lengthM":420,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-nanabhai-bhuleshwar-to-solitaire-bldg-p-n-2025-01-01","sourceKey":"road-from-nanabhai-bhuleshwar-to-solitaire-bldg-p-n-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Nanabhai bhuleshwar to solitaire bldg.","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-25","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-nanasaheb-dharmadhikari-marg-to-sant-dnyaneshwar-mandir-marg-h-e-2023-10-01","sourceKey":"road-from-nanasaheb-dharmadhikari-marg-to-sant-dnyaneshwar-mandir-marg-h-e-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Nanasaheb Dharmadhikari Marg to Sant Dnyaneshwar Mandir Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2026-01-20","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-new-link-road-to-adarsh-nagar-road-k-w-2024-10-01","sourceKey":"road-from-new-link-road-to-adarsh-nagar-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from New link Road to adarsh Nagar road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-new-link-road-to-basa-khetri-road-k-w-2024-10-01","sourceKey":"road-from-new-link-road-to-basa-khetri-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from New link road to Basa khetri road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":182,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-paylipada-entreance-to-anand-nagar-m-e-2025-10-05","sourceKey":"road-from-paylipada-entreance-to-anand-nagar-m-e-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Road from Paylipada Entreance to Anand Nagar","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-05","endDate":"2027-05-31","lengthM":360,"pqcPercentProgress":30.56,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-plot-no-22-to-plot-no-16-garodia-nagar-n-x","sourceKey":"road-from-plot-no-22-to-plot-no-16-garodia-nagar-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Plot No.22 to plot no.16, Garodia Nagar","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-r-c-marg-to-chembur-municipal-market-m-w-x","sourceKey":"road-from-r-c-marg-to-chembur-municipal-market-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Road from R. C. Marg to Chembur Municipal Market","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2027-03-19","lengthM":148,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-radha-kunj-building-to-haji-bapu-road-malad-east-p-n-2023-11-19","sourceKey":"road-from-radha-kunj-building-to-haji-bapu-road-malad-east-p-n-2023-11-19","firstSeen":"2026-07-04","state":{"roadName":"Road from radha Kunj Building to Haji bapu Road,Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-19","endDate":"2024-01-01","lengthM":57,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-rathod-medical-to-gaiwala-l-x","sourceKey":"road-from-rathod-medical-to-gaiwala-l-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Rathod Medical to Gaiwala","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2025-05-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-23","field":"status","from":"On Hold","to":"Not Started"}]},
{"id":"road-from-relief-road-to-mhada-k-w-2025-10-26","sourceKey":"road-from-relief-road-to-mhada-k-w-2025-10-26","firstSeen":"2026-07-04","state":{"roadName":"Road from Relief road to MHADA","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-26","endDate":"2026-05-25","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-sahar-road-to-gokhale-bridge-k-e-2025-10-06","sourceKey":"road-from-sahar-road-to-gokhale-bridge-k-e-2025-10-06","firstSeen":"2026-07-04","state":{"roadName":"Road from Sahar Road To Gokhale Bridge","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-06","endDate":"2026-04-23","lengthM":160.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-saraf-udyog-bhavan-to-chincholi-bunder-road-p-n-2024-09-30","sourceKey":"road-from-saraf-udyog-bhavan-to-chincholi-bunder-road-p-n-2024-09-30","firstSeen":"2026-07-04","state":{"roadName":"Road from saraf udyog bhavan to Chincholi bunder road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-09-30","endDate":"2025-05-23","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-shanta-jog-marg-to-b-m-c-school-m-w-2024-01-12","sourceKey":"road-from-shanta-jog-marg-to-b-m-c-school-m-w-2024-01-12","firstSeen":"2026-07-04","state":{"roadName":"Road from Shanta Jog Marg to B.M.C. School","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-12","endDate":"2024-02-28","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-shantivan-road-to-link-road-k-w-2024-10-01","sourceKey":"road-from-shantivan-road-to-link-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Shantivan road to Link road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-shazy-apartment-k-w-2024-10-01","sourceKey":"road-from-shazy-apartment-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road from Shazy Apartment","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":755,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-shivaji-nagar-masjid-to-school-m-e-x","sourceKey":"road-from-shivaji-nagar-masjid-to-school-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Shivaji nagar masjid to school","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-12-31","lengthM":263,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-shravasti-buddha-vihar-road-to-laxman-kamble-road-goregaon-west-p-s-2025-10-01","sourceKey":"road-from-shravasti-buddha-vihar-road-to-laxman-kamble-road-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road From Shravasti Buddha Vihar Road to Laxman Kamble Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-08","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-shubh-jeevan-circle-to-tea-pee-hotel-dahisar-west-r-n-2023-10-25","sourceKey":"road-from-shubh-jeevan-circle-to-tea-pee-hotel-dahisar-west-r-n-2023-10-25","firstSeen":"2026-07-04","state":{"roadName":"Road from Shubh Jeevan Circle to Tea Pee Hotel, Dahisar (West)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-25","endDate":"2024-12-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-siddharth-nagar-road-no-19-to-vivek-vidyalay-road-goregaon-west-p-s-2024-10-10","sourceKey":"road-from-siddharth-nagar-road-no-19-to-vivek-vidyalay-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Road from Siddharth Nagar Road no. 19 to Vivek Vidyalay Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":273,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-tanaji-nagar-samaj-kalian-kendra-to-andheri-kurla-link-road-nagori-t-stall-l-x","sourceKey":"road-from-tanaji-nagar-samaj-kalian-kendra-to-andheri-kurla-link-road-nagori-t-stall-l-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Tanaji Nagar (Samaj kalian Kendra) to Andheri kurla link road (Nagori T-stall)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2025-03-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-v-n-purav-marg-to-chembur-municipal-market-m-w-2025-11-01","sourceKey":"road-from-v-n-purav-marg-to-chembur-municipal-market-m-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road from V.N. Purav Marg to Chembur Municipal Market","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-15","lengthM":37,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-vidyalankar-college-to-shivshankar-nagar-f-n-x","sourceKey":"road-from-vidyalankar-college-to-shivshankar-nagar-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road from Vidyalankar College to Shivshankar Nagar","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":207,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-28","before":{"roadName":"Road from Vidyalankar College to Shivshankar Nagar","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":207,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"road-from-vitthal-rukhumini-mandir-pmgp-to-90-feet-road-60-feet-road-m-e-2023-12-18","sourceKey":"road-from-vitthal-rukhumini-mandir-pmgp-to-90-feet-road-60-feet-road-m-e-2023-12-18","firstSeen":"2026-07-04","state":{"roadName":"Road from Vitthal Rukhumini Mandir PMGP to 90' feet Road & 60' Feet Road","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-18","endDate":"2025-05-31","lengthM":107,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-from-w-e-h-to-sant-dnyaneshwar-chowk-kandivali-e-r-s-2026-10-01","sourceKey":"road-from-mahindra-yellow-gate-to-sant-dnyaneshwar-chowk-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Road from Mahindra yellow gate to Sant dnyaneshwar chowk","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2027-01-05","lengthM":720,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"roadName","from":"Road from W.E.H.to Sant Dnyaneshwar chowk, Kandivali ( E)","to":"Road from Mahindra yellow gate to Sant dnyaneshwar chowk"}]},
{"id":"road-from-wire-galli-to-kuba-masjid-l-2024-12-09","sourceKey":"road-from-wire-galli-to-kuba-masjid-l-2024-12-09","firstSeen":"2026-07-04","state":{"roadName":"Road from Wire Galli to Kuba Masjid","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-12-09","endDate":"2025-01-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-in-front-of-bhimashankar-ht-dahisar-w-link-road-to-dahisar-river-r-n-x","sourceKey":"road-in-front-of-bhimashankar-ht-dahisar-w-link-road-to-dahisar-river-r-n-2025-12-05","firstSeen":"2026-07-04","state":{"roadName":"Road in front of Bhimashankar ht. Dahisar(W)- Link road to Dahisar River","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-12-05","endDate":"2026-04-08","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-08-15","field":"status","from":"Not Started","to":"Completed"},{"on":"2026-08-15","field":"startDate","from":null,"to":"2025-12-05"}]},
{"id":"road-including-from-naidu-colony-main-road-to-dead-end-naidu-colony-road-n-x","sourceKey":"road-including-from-naidu-colony-main-road-to-dead-end-naidu-colony-road-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road including from Naidu Colony Main Road to Dead End, Naidu Colony Road.","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-infront-of-chanda-hospital-nehru-nagar-l-x","sourceKey":"road-infront-of-chanda-hospital-nehru-nagar-l-x","firstSeen":"2026-09-29","state":{"roadName":"Road infront of chanda hospital,nehru nagar","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-infront-of-sunrise-tower-goregaon-w-p-s-2023-11-01","sourceKey":"road-infront-of-sunrise-tower-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road infront of sunrise tower, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":205,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-leading-to-rupal-industries-n-2024-12-09","sourceKey":"road-leading-to-rupal-industries-n-2024-12-09","firstSeen":"2026-07-04","state":{"roadName":"Road leading to Rupal Industries","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-09","endDate":"2026-03-20","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-near-borbadevi-m-e-2025-10-01","sourceKey":"road-near-borbadevi-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road near Borbadevi","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2027-04-05","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-08-15","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"road-near-chitrawani-blg-malad-east-p-n-x","sourceKey":"road-near-chitrawani-blg-malad-east-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road near Chitrawani Blg., Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":null,"endDate":null,"lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-near-libery-garden-bar-p-n-2025-01-01","sourceKey":"road-near-libery-garden-bar-p-n-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Road Near Libery Garden Bar","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-25","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-near-shirodkar-highschool-f-s-2024-12-11","sourceKey":"road-near-shirodkar-highschool-f-s-2024-12-11","firstSeen":"2026-07-04","state":{"roadName":"Road near Shirodkar Highschool","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-11","endDate":"2025-01-31","lengthM":45,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-near-shivaji-ground-maidan-kaju-pada-l-x","sourceKey":"road-near-shivaji-ground-maidan-kaju-pada-l-x","firstSeen":"2026-07-04","state":{"roadName":"Road near Shivaji Ground (Maidan), Kaju Pada","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":45,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-01-tps-iii-h-e-2025-10-15","sourceKey":"road-no-01-tps-iii-h-e-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road no. 01 ,TPS III","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-15","endDate":"2026-03-21","lengthM":105,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-02-tps-iii-h-e-2025-10-20","sourceKey":"road-no-02-tps-iii-h-e-2025-10-20","firstSeen":"2026-07-04","state":{"roadName":"Road no. 02 ,TPS III","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-20","endDate":"2026-04-25","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-03-tps-iii-h-e-2024-10-22","sourceKey":"road-no-03-tps-iii-h-e-2024-10-22","firstSeen":"2026-07-04","state":{"roadName":"Road no. 03 ,TPS III","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-22","endDate":"2026-05-14","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-04-tps-iii-h-e-2025-11-01","sourceKey":"road-no-04-tps-iii-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road No. 04, TPS III","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-29","lengthM":260,"pqcPercentProgress":48.08,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-04-tps-v-h-e-2024-12-01","sourceKey":"road-no-04-tps-v-h-e-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Road no. 04, TPS V","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-01","endDate":"2026-05-18","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-05-tps-iii-h-e-2026-10-01","sourceKey":"road-no-05-tps-iii-h-e-2026-10-01","firstSeen":"2026-10-20","state":{"roadName":"Road no. 05, TPS III","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-05-tps-v-h-e-2024-10-08","sourceKey":"road-no-05-tps-v-h-e-2024-10-08","firstSeen":"2026-07-04","state":{"roadName":"Road no. 05 ,TPS V","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-08","endDate":"2025-05-30","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-06-tps-v-h-e-2024-10-08","sourceKey":"road-no-06-tps-v-h-e-2024-10-08","firstSeen":"2026-07-04","state":{"roadName":"Road no. 06 ,TPS V","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-08","endDate":"2025-05-30","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-07-tps-v-h-e-2024-12-01","sourceKey":"road-no-07-tps-v-h-e-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Road no. 07 ,TPS V","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-01","endDate":"2026-02-06","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-08-tps-iii-h-e-2023-10-01","sourceKey":"road-no-08-tps-iii-h-e-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road No. 08, TPS III","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-05-31","lengthM":265,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-09-tps-iii-h-e-2024-11-01","sourceKey":"road-no-09-tps-iii-h-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road no. 09 ,TPS III","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-04-30","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-10-tps-iii-h-e-2024-11-01","sourceKey":"road-no-10-tps-iii-h-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road no. 10 ,TPS III","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2026-03-26","lengthM":215,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-11-mds-road-to-d-k-sandu-marg-m-w-2024-10-15","sourceKey":"road-no-11-mds-road-to-d-k-sandu-marg-m-w-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road No. 11 MDS road to D.K. Sandu Marg","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-10-15","endDate":"2027-05-12","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-11-mds-road-to-subhash-nagar-road-m-w-2025-11-25","sourceKey":"road-no-11-mds-road-to-subhash-nagar-road-m-w-2025-11-25","firstSeen":"2026-07-04","state":{"roadName":"Road No. 11 MDS road to Subhash Nagar Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-25","endDate":"2026-05-20","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-11-tps-v-h-e-2024-03-15","sourceKey":"road-no-11-tps-v-h-e-2024-03-15","firstSeen":"2026-07-04","state":{"roadName":"Road No. 11, TPS V","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-03-15","endDate":"2026-05-26","lengthM":375,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-12-13-plot-no-37-eidgah-maidan-m-e-2024-12-05","sourceKey":"road-no-12-13-plot-no-37-eidgah-maidan-m-e-2024-12-05","firstSeen":"2026-07-04","state":{"roadName":"Road No.12&13 Plot no.37,Eidgah Maidan","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-05","endDate":"2025-05-30","lengthM":66,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-12-m-w-x","sourceKey":"road-no-12-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Road No. 12","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-01-04","lengthM":338,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-13-m-w-2026-10-06","sourceKey":"road-no-13-m-w-2026-10-06","firstSeen":"2026-07-04","state":{"roadName":"Road No. 13","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-10-06","endDate":"2027-05-30","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-14-chikhalwadi-school-m-e-x","sourceKey":"road-no-14-chikhalwadi-school-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Road No. 14, Chikhalwadi School","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2027-01-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-14-m-w-2025-10-06","sourceKey":"road-no-14-m-w-2025-10-06","firstSeen":"2026-07-04","state":{"roadName":"Road No.14","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-06","endDate":"2026-05-20","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-14-naigaon-f-s-2025-02-21","sourceKey":"road-no-14-naigaon-f-s-2025-02-21","firstSeen":"2026-07-04","state":{"roadName":"Road No.14 Naigaon","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-02-21","endDate":"2025-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-14-wadala-sw-f-n-2025-11-01","sourceKey":"road-no-14-wadala-sw-f-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road no 14 Wadala SW","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-15-m-w-2023-12-05","sourceKey":"road-no-15-m-w-2023-12-05","firstSeen":"2026-07-04","state":{"roadName":"Road No. 15","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-05","endDate":"2024-02-28","lengthM":165.3,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-15-sion-f-n-2025-10-15","sourceKey":"road-no-15-sion-f-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road no 15 Sion","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2025-10-15","endDate":"2026-05-31","lengthM":134,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-16-m-w-2024-01-03","sourceKey":"road-no-16-m-w-2024-01-03","firstSeen":"2026-07-04","state":{"roadName":"Road No. 16","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-03","endDate":"2025-05-31","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-17-m-w-2023-10-02","sourceKey":"road-no-17-m-w-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Road No. 17","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-02","endDate":"2024-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-19-f-n-2025-11-01","sourceKey":"road-no-19-f-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road no 19","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2027-05-31","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-19b-f-n-2025-11-08","sourceKey":"road-no-19b-f-n-2025-11-08","firstSeen":"2026-07-04","state":{"roadName":"Road no 19B","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-11-08","endDate":"2026-01-15","lengthM":69,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-1a-s-w-road-f-n-x","sourceKey":"road-no-1a-s-w-road-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road no 1A S.W. Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-2-m-w-2025-10-06","sourceKey":"road-no-2-m-w-2025-10-06","firstSeen":"2026-07-04","state":{"roadName":"Road No. 2","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-06","endDate":"2026-03-09","lengthM":131,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-20-m-w-2023-10-30","sourceKey":"road-no-20-m-w-2023-10-30","firstSeen":"2026-07-04","state":{"roadName":"Road No. 20","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-30","endDate":"2024-02-28","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-21-m-w-2024-11-14","sourceKey":"road-no-21-m-w-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Road No. 21","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-14","endDate":"2025-05-20","lengthM":236,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-24-a-sion-f-n-2025-10-10","sourceKey":"road-no-24-a-sion-f-n-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Road No.24 A Sion","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-10","endDate":"2027-03-31","lengthM":370,"pqcPercentProgress":66.22,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-24b-f-n-2024-11-27","sourceKey":"road-no-24b-f-n-2024-11-27","firstSeen":"2026-07-04","state":{"roadName":"Road no 24B","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2024-11-27","endDate":"2026-05-31","lengthM":330,"pqcPercentProgress":89.39,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-25-f-n-2024-10-15","sourceKey":"road-no-25-f-n-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road no 25","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2024-10-15","endDate":"2027-05-31","lengthM":990,"pqcPercentProgress":24.24,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-25c-f-n-2024-12-04","sourceKey":"road-no-25c-f-n-2024-12-04","firstSeen":"2026-07-04","state":{"roadName":"Road no 25C","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-12-04","endDate":"2026-05-31","lengthM":347.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-27-f-n-2025-01-11","sourceKey":"road-no-27-f-n-2025-01-11","firstSeen":"2026-07-04","state":{"roadName":"Road no 27","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-11","endDate":"2026-05-31","lengthM":265,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-27a-f-n-2024-11-27","sourceKey":"road-no-27a-f-n-2024-11-27","firstSeen":"2026-07-04","state":{"roadName":"Road no 27A","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-27","endDate":"2025-03-31","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-3-m-w-2025-10-13","sourceKey":"road-no-3-m-w-2025-10-13","firstSeen":"2026-07-04","state":{"roadName":"Road No. 3","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-13","endDate":"2026-01-31","lengthM":84,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-31-a-f-n-2025-10-15","sourceKey":"road-no-31-a-f-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road no 31 A","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-10-15","endDate":"2026-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-31-sion-east-f-n-x","sourceKey":"road-no-31-sion-east-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Road no 31 Sion East","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-32a-f-n-2026-01-01","sourceKey":"road-no-32a-f-n-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Road no 32A","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-01-01","endDate":"2027-03-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-34-dadar-matunga-estate-scheme-f-n-2024-12-09","sourceKey":"road-no-34-dadar-matunga-estate-scheme-f-n-2024-12-09","firstSeen":"2026-07-04","state":{"roadName":"Road No 34 Dadar Matunga Estate Scheme","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-09","endDate":"2025-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-5-rizvi-complex-h-w-2023-10-01","sourceKey":"road-no-5-rizvi-complex-h-w-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road No 5, Rizvi complex","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-02-28","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-6-tps-iii-h-e-2025-11-01","sourceKey":"road-no-6-tps-iii-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road No-6, TPS III","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":400,"pqcPercentProgress":55,"pqcCompletedOn":null},"changes":[]},
{"id":"road-no-8-from-uaday-society-to-road-no-6-goregaon-w-p-s-2024-03-04","sourceKey":"road-no-8-from-uaday-society-to-road-no-6-goregaon-w-p-s-2024-03-04","firstSeen":"2026-07-04","state":{"roadName":"Road No.8 From Uaday Society To Road No.6, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-03-04","endDate":"2026-01-15","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-opp-jijamata-school-p-n-2023-10-20","sourceKey":"road-opp-jijamata-school-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"Road opp. Jijamata School","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-05-01","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-opp-st-lawrence-school-k-e-2025-10-05","sourceKey":"road-opp-st-lawrence-school-k-e-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"Road Opp. St. Lawrence School","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-05","endDate":"2026-02-26","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-opp-universal-school-r-n-2024-10-10","sourceKey":"road-opp-universal-school-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Road opp. Universal school","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-03-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-outside-building-16-17-d-n-nagar-k-w-2025-10-10","sourceKey":"road-outside-building-16-17-d-n-nagar-k-w-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Road outside building 16-17(D N Nagar)","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-10","endDate":"2026-03-24","lengthM":107,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-parallel-to-dahisar-river-dahisar-west-r-n-2024-10-01","sourceKey":"road-parallel-to-dahisar-river-dahisar-west-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road parallel to Dahisar River, Dahisar (West)","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-parallel-to-ganapati-mandir-road-goregaon-west-p-s-2024-10-10","sourceKey":"road-parallel-to-ganapati-mandir-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Road Parallel to Ganapati Mandir Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":223,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-parreral-to-govandi-bridge-m-e-2024-01-10","sourceKey":"road-parreral-to-govandi-bridge-m-e-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"Road Parreral to Govandi Bridge","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-01-10","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-rd-leading-to-rly-track-from-kirol-fish-market-n-2024-11-12","sourceKey":"road-rd-leading-to-rly-track-from-kirol-fish-market-n-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"Road Rd leading to Rly track from Kirol Fish Market","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-12","endDate":"2026-03-30","lengthM":148,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-starting-from-link-road-near-shiv-mandir-to-badi-masjid-goregaon-w-p-s-2023-11-01","sourceKey":"road-starting-from-link-road-near-shiv-mandir-to-badi-masjid-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road starting from Link Road (Near Shiv Mandir to Badi Masjid), Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-01-24","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-starting-from-m-g-road-jain-mandir-to-sane-guruji-road-goregaon-w-p-s-2024-02-18","sourceKey":"road-starting-from-m-g-road-jain-mandir-to-sane-guruji-road-goregaon-w-p-s-2024-02-18","firstSeen":"2026-07-04","state":{"roadName":"Road starting from M.G.Road (Jain Mandir) to Sane Guruji Road, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-18","endDate":"2025-01-25","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-starting-from-m-g-road-to-badi-masjid-goregaon-w-p-s-2023-11-01","sourceKey":"road-starting-from-m-g-road-to-badi-masjid-goregaon-w-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Road starting from M.G.Road to Badi Masjid, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2025-12-25","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-starting-from-windermere-chowk-to-pandit-dindayal-upadhyay-garden-goregaon-west-p-s-2025-10-01","sourceKey":"road-starting-from-windermere-chowk-to-pandit-dindayal-upadhyay-garden-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Road starting from Windermere chowk to Pandit Dindayal Upadhyay Garden, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2027-05-22","lengthM":183,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"road-surrounding-mhada-garden-opp-filmistan-studio-goregaon-west-p-s-2024-10-15","sourceKey":"road-surrounding-mhada-garden-opp-filmistan-studio-goregaon-west-p-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Road Surrounding Mhada Garden opp Filmistan Studio, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-15","endDate":"2025-05-31","lengthM":161,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"roads-adjacent-to-jade-garden-building-h-e-2025-12-03","sourceKey":"roads-adjacent-to-jade-garden-building-h-e-2025-12-03","firstSeen":"2026-07-04","state":{"roadName":"Roads adjacent to Jade Garden Building","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-03","endDate":"2026-05-17","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"roads-from-building-no-12-f-n-2024-11-07","sourceKey":"roads-from-building-no-12-f-n-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"Roads from Building No 12","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-07","endDate":"2026-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rokadia-x-lane-from-rokadiya-lane-to-jaiwant-sawant-road-r-c-2023-10-27","sourceKey":"rokadia-x-lane-from-rokadiya-lane-to-jaiwant-sawant-road-r-c-2023-10-27","firstSeen":"2026-07-04","state":{"roadName":"Rokadia X Lane (From Rokadiya Lane to Jaiwant sawant Road)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-27","endDate":"2024-03-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"roof-top-road-k-e-x","sourceKey":"roof-top-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Roof Top Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-03-05","lengthM":52,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-21","field":"status","from":"On Hold","to":"Deleted"}],"deletions":[{"on":"2026-09-21","before":{"roadName":"Roof Top Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"On Hold","startDate":null,"endDate":"2027-03-05","lengthM":52,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"ropa-lane-c-2024-11-23","sourceKey":"ropa-lane-c-2024-11-23","firstSeen":"2026-07-04","state":{"roadName":"Ropa Lane","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-23","endDate":"2025-05-27","lengthM":78,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"royal-complex-road-borivali-west-r-c-2023-11-24","sourceKey":"royal-complex-road-borivali-west-r-c-2023-11-24","firstSeen":"2026-07-04","state":{"roadName":"Royal Complex Road, Borivali (West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-24","endDate":"2024-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rrt-road-side-strips-t-2024-02-06","sourceKey":"rrt-road-side-strips-t-2024-02-06","firstSeen":"2026-07-04","state":{"roadName":"RRT Road (Side Strips)","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-02-06","endDate":"2026-05-31","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-03-p-n-2023-10-20","sourceKey":"rsc-03-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"RSC 03","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-05-01","lengthM":292,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-04-road-mhada-malvani-p-n-2024-05-25","sourceKey":"rsc-04-road-mhada-malvani-p-n-2024-05-25","firstSeen":"2026-07-04","state":{"roadName":"RSC-04 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-05-25","endDate":"2026-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-05-charkop-kandivali-w-r-s-2023-11-01","sourceKey":"rsc-05-charkop-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-05 charkop, kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-05-road-mhada-malvani-p-n-2024-05-25","sourceKey":"rsc-05-road-mhada-malvani-p-n-2024-05-25","firstSeen":"2026-07-04","state":{"roadName":"RSC-05 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-05-25","endDate":"2025-05-01","lengthM":295,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-07-charkop-kandivali-w-r-s-2023-11-01","sourceKey":"rsc-07-charkop-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-07 charkop, kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":207,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-07-road-mhada-malvani-p-n-2024-04-20","sourceKey":"rsc-07-road-mhada-malvani-p-n-2024-04-20","firstSeen":"2026-07-04","state":{"roadName":"RSC-07 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-04-20","endDate":"2025-05-01","lengthM":243,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-08-road-mhada-malvani-p-n-2024-04-25","sourceKey":"rsc-08-road-mhada-malvani-p-n-2024-04-25","firstSeen":"2026-07-04","state":{"roadName":"RSC-08 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-04-25","endDate":"2025-05-01","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-09-road-mhada-malvani-p-n-2023-10-22","sourceKey":"rsc-09-road-mhada-malvani-p-n-2023-10-22","firstSeen":"2026-07-04","state":{"roadName":"RSC-09 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-22","endDate":"2024-05-01","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-1-2-4-6-kandivali-w-r-s-2024-10-01","sourceKey":"rsc-1-2-4-6-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-1,2,4 &6 , Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":735,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-1-p-n-2023-10-20","sourceKey":"rsc-1-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"RSC 1","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-05-01","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-10-11-sector-8-r-c-2024-10-01","sourceKey":"rsc-10-11-sector-8-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-10/11, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-10-charkop-kandivali-w-r-s-2023-11-01","sourceKey":"rsc-10-charkop-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-10 charkop, kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":92,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-10-road-mhada-malvani-p-n-2023-10-22","sourceKey":"rsc-10-road-mhada-malvani-p-n-2023-10-22","firstSeen":"2026-07-04","state":{"roadName":"RSC-10 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-22","endDate":"2024-05-01","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-11-gorai-ii-r-c-2025-10-01","sourceKey":"rsc-11-gorai-ii-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-11, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-02-09","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-11-road-mhada-malvani-p-n-2023-10-20","sourceKey":"rsc-11-road-mhada-malvani-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"RSC-11 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-05-01","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-12-charkop-kandivali-w-r-s-2023-11-01","sourceKey":"rsc-12-charkop-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-12 charkop, kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":226,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-12-gorai-sector-1-r-c-2025-10-01","sourceKey":"rsc-12-gorai-sector-1-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-12 Gorai, Sector-1","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2025-12-30","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-12-sector-8-r-c-2024-11-10","sourceKey":"rsc-12-sector-8-r-c-2024-11-10","firstSeen":"2026-07-04","state":{"roadName":"RSC-12, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-10","endDate":"2025-05-31","lengthM":367,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-13-gorai-ii-r-c-2025-10-01","sourceKey":"rsc-13-gorai-ii-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-13, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-22","lengthM":72,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-13-sector-8-r-c-2024-11-10","sourceKey":"rsc-13-sector-8-r-c-2024-11-10","firstSeen":"2026-07-04","state":{"roadName":"RSC-13, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-10","endDate":"2025-03-31","lengthM":186,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-14-charkop-kandivali-w-r-s-2023-11-01","sourceKey":"rsc-14-charkop-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-14, charkop, kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-14-sector-8-r-c-2024-11-10","sourceKey":"rsc-14-sector-8-r-c-2024-11-10","firstSeen":"2026-07-04","state":{"roadName":"RSC-14, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-10","endDate":"2025-05-31","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-15-sector-9-r-c-2024-10-01","sourceKey":"rsc-15-sector-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-15, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":372,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-16-gorai-i-r-c-2025-10-01","sourceKey":"rsc-16-gorai-i-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC 16 Gorai I","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":540,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-16-road-mhada-malvani-p-n-2024-04-25","sourceKey":"rsc-16-road-mhada-malvani-p-n-2024-04-25","firstSeen":"2026-07-04","state":{"roadName":"RSC-16 Road, MHADA Malvani.","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-04-25","endDate":"2025-05-01","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-16-sector-9-r-c-2024-10-01","sourceKey":"rsc-16-sector-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-16, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":184,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-17-22-21-24-kandivali-w-r-s-2024-10-01","sourceKey":"rsc-17-22-21-24-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-17,22,21 &24, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":708,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-17-gorai-ii-r-c-2025-01-01","sourceKey":"rsc-17-gorai-ii-r-c-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-17, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-01-01","endDate":"2025-10-15","lengthM":244,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-17-p-n-2023-10-20","sourceKey":"rsc-17-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"RSC 17","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-05-01","lengthM":370,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-17-sector-9-r-c-2024-10-01","sourceKey":"rsc-17-sector-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-17, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":194,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-18-gorai-i-r-c-2025-10-01","sourceKey":"rsc-18-gorai-i-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC 18 Gorai I","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-05","lengthM":489,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-19-charkop-kandivali-w-r-s-2023-11-01","sourceKey":"rsc-19-charkop-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-19,charkop, kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-02-22","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-19-p-n-2023-10-20","sourceKey":"rsc-19-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"RSC 19","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-01-01","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-19-sector-9-r-c-2025-10-01","sourceKey":"rsc-19-sector-9-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-19, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-01-31","lengthM":490,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-20-gorai-i-r-c-2024-10-01","sourceKey":"rsc-20-gorai-i-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC 20 Gorai I","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-05","lengthM":510,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-20-p-n-2023-10-20","sourceKey":"rsc-20-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"RSC 20","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-01-01","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-20-sector-9-r-c-2024-10-01","sourceKey":"rsc-20-sector-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-20, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-21-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-21-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC- 21, Gorai - II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-21-p-n-2023-10-20","sourceKey":"rsc-21-p-n-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"RSC 21","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-20","endDate":"2024-01-01","lengthM":75,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-21-sector-9-r-c-2024-10-01","sourceKey":"rsc-21-sector-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-21, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-22-sector-9-r-c-2025-10-01","sourceKey":"rsc-22-sector-9-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-22, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":234,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-23-gorai-ii-r-c-2024-12-10","sourceKey":"rsc-23-gorai-ii-r-c-2024-12-10","firstSeen":"2026-07-04","state":{"roadName":"RSC-23, Gorai - II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-12-10","endDate":"2025-05-31","lengthM":128,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-23-sector-9-r-c-2024-10-01","sourceKey":"rsc-23-sector-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-23, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":169,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-24-gorai-ii-r-c-2025-01-01","sourceKey":"rsc-24-gorai-ii-r-c-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-24, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":126,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-24-sector-9-r-c-2024-10-01","sourceKey":"rsc-24-sector-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-24, Sector-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-25-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-25-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-25, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":201,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-25-road-r-s-2025-06-01","sourceKey":"rsc-25-road-r-s-2025-06-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-25 Road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-06-01","endDate":"2026-02-28","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-25-sector-3-r-c-2024-10-01","sourceKey":"rsc-25-sector-3-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-25, Sector-3","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":89,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-26-gorai-ii-r-c-2025-01-01","sourceKey":"rsc-26-gorai-ii-r-c-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-26, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":171,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-3-5-gorai-i-r-c-2024-10-01","sourceKey":"rsc-3-5-gorai-i-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC 3/5 Gorai I","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":205,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-3-sector-8-r-c-2024-10-15","sourceKey":"rsc-3-sector-8-r-c-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"RSC-3, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-15","endDate":"2025-02-28","lengthM":121,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-30-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-30-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-30, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-31-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-31-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-31, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-15","lengthM":234,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-32-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-32-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-32, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-32-sector-3-r-c-2024-10-01","sourceKey":"rsc-32-sector-3-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-32, Sector-3","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-11-05","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-33-38-sector-3-r-c-2024-10-01","sourceKey":"rsc-33-38-sector-3-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-33/38, Sector-3","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-11-05","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-33-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-33-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-33, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-15","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-34-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-34-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-34, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-31","lengthM":118,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-34-sector-3-r-c-2024-10-01","sourceKey":"rsc-34-sector-3-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-34, Sector-3","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":205,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-35-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-35-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-35, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-15","lengthM":138,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-35-sector-4-r-c-2025-10-01","sourceKey":"rsc-35-sector-4-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-35, Sector-4","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-38-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-38-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-38, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-4-gorai-i-r-c-2025-01-15","sourceKey":"rsc-4-gorai-i-r-c-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"RSC-4, Gorai I","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-01-15","endDate":"2025-11-20","lengthM":172,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-4-sector-8-r-c-2024-10-01","sourceKey":"rsc-4-sector-8-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-4, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":127,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-40-37-including-rsc-37-sector-4-r-c-2024-10-01","sourceKey":"rsc-40-37-including-rsc-37-sector-4-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-40/37 (including RSC 37), Sector-4","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-12-15","lengthM":335,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-40-gorai-ii-r-c-2025-10-01","sourceKey":"rsc-40-gorai-ii-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-40, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-02-04","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-41-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-41-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-41, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":55,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-42-gorai-ii-r-c-2025-10-01","sourceKey":"rsc-42-gorai-ii-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-42, Gorai-II,","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-02-17","lengthM":157,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-42-sector-4-r-c-2024-10-01","sourceKey":"rsc-42-sector-4-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-42, Sector-4","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-43-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-43-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-43, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-44-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-44-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-44, Gorai-II,","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-15","lengthM":279,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-44-sector-5-r-c-2024-10-01","sourceKey":"rsc-44-sector-5-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-44, Sector-5","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-10-31","lengthM":202,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-45-gorai-ii-r-c-2024-11-01","sourceKey":"rsc-45-gorai-ii-r-c-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-45, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-49-sector-5-r-c-x","sourceKey":"rsc-49-sector-5-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"RSC-49, Sector-5","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-5-sector-8-r-c-2024-10-01","sourceKey":"rsc-5-sector-8-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-5, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-02-28","lengthM":98,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-50-55-including-rsc-50-sector-5-r-c-2024-10-01","sourceKey":"rsc-50-55-including-rsc-50-sector-5-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-50/55 (Including RSC 50), Sector-5","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-51-47-including-rsc-47-sector-5-r-c-2024-10-01","sourceKey":"rsc-51-47-including-rsc-47-sector-5-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-51/47(including RSC 47), Sector-5","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":476,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-51-charkop-sector-6-r-c-2024-10-01","sourceKey":"rsc-51-charkop-sector-6-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-51 Charkop, Sector-6","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-51-gorai-ii-r-c-2024-10-01","sourceKey":"rsc-51-gorai-ii-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-51, Gorai-II","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":162,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-53-sector-5-r-c-2024-10-01","sourceKey":"rsc-53-sector-5-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-53, Sector-5","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-12-25","lengthM":371,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-56-charkop-sector-6-r-c-2024-10-01","sourceKey":"rsc-56-charkop-sector-6-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-56 Charkop, Sector-6","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-58-charkop-sector-6-r-c-2024-10-01","sourceKey":"rsc-58-charkop-sector-6-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-58 Charkop, Sector-6","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":67,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-6-gorai-sector-1-r-c-2024-10-10","sourceKey":"rsc-6-gorai-sector-1-r-c-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"RSC-6 Gorai, Sector-1","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-71-sector-7-r-c-2025-10-01","sourceKey":"rsc-71-sector-7-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-71, Sector-7","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-04-28","lengthM":273,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-8-9-sector-8-r-c-2024-10-01","sourceKey":"rsc-8-9-sector-8-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-8/9, Sector-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":488,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rsc-9-gorai-sector-1-r-c-2024-10-01","sourceKey":"rsc-9-gorai-sector-1-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"RSC-9 Gorai, Sector-1","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-22","lengthM":206,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"runghtha-lane-d-2024-10-01","sourceKey":"runghtha-lane-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Runghtha Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2026-01-03","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rungtha-cross-lane-d-2024-10-01","sourceKey":"rungtha-cross-lane-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Rungtha cross Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-12-18","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"russel-street-b-2025-01-20","sourceKey":"russel-street-b-2025-01-20","firstSeen":"2026-07-04","state":{"roadName":"Russel Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-01-20","endDate":"2026-02-15","lengthM":255,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"rutumbara-college-road-k-w-2023-10-25","sourceKey":"rutumbara-college-road-k-w-2023-10-25","firstSeen":"2026-07-04","state":{"roadName":"Rutumbara College Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-25","endDate":"2024-05-24","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-a-brelvy-road-a-x","sourceKey":"s-a-brelvy-road-a-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"S.A. Brelvy Road","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":195,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-19","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-19","field":"startDate","from":null,"to":"2026-10-01"}]},
{"id":"s-b-patil-road-khar-w-h-w-x","sourceKey":"s-b-patil-road-khar-w-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"S B Patil Road , Khar (W)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":1050,"pqcPercentProgress":49.24,"pqcCompletedOn":null},"changes":[]},
{"id":"s-g-barve-e-marg-side-stripes-bad-patch-l-2024-02-02","sourceKey":"s-g-barve-e-marg-side-stripes-bad-patch-l-2024-02-02","firstSeen":"2026-07-04","state":{"roadName":"S.G.Barve(E) Marg side stripes & Bad patch","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-02-02","endDate":"2025-05-01","lengthM":975,"pqcPercentProgress":30.77,"pqcCompletedOn":null},"changes":[]},
{"id":"s-k-patil-marg-c-2024-11-19","sourceKey":"s-k-patil-marg-c-2024-11-19","firstSeen":"2026-07-04","state":{"roadName":"S K Patil Marg","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-19","endDate":"2025-11-30","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"s-k-rathod-marg-d-x","sourceKey":"s-k-rathod-marg-d-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"S K Rathod Marg","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-15","endDate":"2026-02-15","lengthM":150,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-27","field":"startDate","from":null,"to":"2025-10-15"}]},
{"id":"s-m-jadhav-road-road-no-2-f-s-2025-11-20","sourceKey":"s-m-jadhav-road-road-no-2-f-s-2025-11-20","firstSeen":"2026-07-04","state":{"roadName":"S.M.Jadhav Road (Road No.2)","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-11-20","endDate":"2026-05-31","lengthM":540,"pqcPercentProgress":55.56,"pqcCompletedOn":null},"changes":[]},
{"id":"s-n-dubey-road-dahisar-e-r-n-2025-10-10","sourceKey":"s-n-dubey-road-dahisar-e-r-n-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"S.N.Dubey Road , Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-10","endDate":"2025-12-31","lengthM":850,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-n-dubey-road-to-shingte-compound-dahisar-e-r-n-2023-11-01","sourceKey":"s-n-dubey-road-to-shingte-compound-dahisar-e-r-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"S.N.Dubey Road to Shingte Compound , Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2024-10-30","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-n-patil-lane-k-w-2025-04-01","sourceKey":"s-n-patil-lane-k-w-2025-04-01","firstSeen":"2026-07-04","state":{"roadName":"S.N. Patil Lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-04-01","endDate":"2026-03-31","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-p-murai-cross-road-f-s-2024-11-16","sourceKey":"s-p-murai-cross-road-f-s-2024-11-16","firstSeen":"2026-07-04","state":{"roadName":"S.P. Murai Cross Road","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-16","endDate":"2025-02-15","lengthM":70,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-r-mahadik-road-k-e-2024-11-01","sourceKey":"s-r-mahadik-road-k-e-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"S R Mahadik Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-11-01","endDate":"2026-05-31","lengthM":570,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-s-gaikwad-road-c-x","sourceKey":"s-s-gaikwad-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"S S Gaikwad Road","ward":"C","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"S S Gaikwad Road","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"s-s-of-r-k-mission-road-h-w-x","sourceKey":"s-s-of-r-k-mission-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"S S of R K Mission Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":1150,"pqcPercentProgress":46.09,"pqcCompletedOn":null},"changes":[]},
{"id":"s-s-of-road-no-1-tps-v-h-e-2025-11-01","sourceKey":"s-s-of-road-no-1-tps-v-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"S S of Road No-1, TPS V","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-s-of-road-no-7-tps-iii-h-e-2025-10-20","sourceKey":"s-s-of-road-no-7-tps-iii-h-e-2025-10-20","firstSeen":"2026-07-04","state":{"roadName":"S S of Road No-7, TPS III","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-20","endDate":"2026-05-31","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-s-waterfield-road-h-w-x","sourceKey":"s-s-waterfield-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"S S Waterfield Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":488,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-v-p-road-d-x","sourceKey":"s-v-p-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"S V P Road","ward":"D","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":1220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"S V P Road","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":1220,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"s-v-road-dahisar-east-r-n-2025-10-01","sourceKey":"s-v-road-dahisar-east-r-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"S.V.Road, Dahisar East","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-01","endDate":"2025-12-15","lengthM":2475,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-v-road-set-back-goregaon-w-p-s-2024-01-01","sourceKey":"s-v-road-set-back-goregaon-w-p-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"S.V. Road Set Back, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-24","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"s-v-road-side-strip-from-j-p-road-to-v-m-road-k-w-2024-01-10","sourceKey":"s-v-road-side-strip-from-j-p-road-to-v-m-road-k-w-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"S.V.Road (Side Strip) from J.P.Road to V.M.Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2024-01-10","endDate":"2026-05-31","lengthM":2400,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"s-v-road-side-strip-from-oshiwara-to-j-p-road-k-w-2023-11-10","sourceKey":"s-v-road-side-strip-from-oshiwara-to-j-p-road-k-w-2023-11-10","firstSeen":"2026-07-04","state":{"roadName":"S.V.Road (Side Strip) from Oshiwara to J.P.Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2023-11-10","endDate":"2026-05-31","lengthM":3300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sab-t-v-lane-side-strips-k-w-2023-12-10","sourceKey":"sab-t-v-lane-side-strips-k-w-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"Sab T.V.Lane ( Side strips )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-10","endDate":"2024-05-24","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sachhidanand-marg-f-s-2025-02-21","sourceKey":"sachhidanand-marg-f-s-2025-02-21","firstSeen":"2026-07-04","state":{"roadName":"Sachhidanand Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-02-21","endDate":"2026-04-15","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sadashiv-lane-d-2025-10-15","sourceKey":"sadashiv-lane-d-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Sadashiv Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-15","endDate":"2026-03-15","lengthM":220,"pqcPercentProgress":22.73,"pqcCompletedOn":null},"changes":[]},
{"id":"sadbhakiti-road-k-e-2023-10-01","sourceKey":"sadbhakiti-road-k-e-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sadbhakiti road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2024-05-31","lengthM":470,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sadhu-t-l-vasvani-road-to-mhada-sankraman-shibir-a-x","sourceKey":"sadhu-t-l-vasvani-road-to-mhada-sankraman-shibir-a-x","firstSeen":"2026-10-13","state":{"roadName":"Sadhu T.L .Vasvani road to MHADA sankraman shibir","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sagbaug-school-road-no-3-k-e-2024-12-15","sourceKey":"sagbaug-school-road-no-3-k-e-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"Sagbaug School Road No. 3","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-15","endDate":"2026-03-01","lengthM":315,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sahakar-nagar-road-no-5-m-w-2026-01-02","sourceKey":"sahakar-nagar-road-no-5-m-w-2026-01-02","firstSeen":"2026-07-04","state":{"roadName":"Sahakar Nagar Road no. 5","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-02","endDate":"2026-05-20","lengthM":111,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sahakar-road-k-e-x","sourceKey":"sahakar-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Sahakar Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":235,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sahar-road-side-strip-k-e-2025-11-04","sourceKey":"sahar-road-side-strip-k-e-2025-11-04","firstSeen":"2026-07-04","state":{"roadName":"Sahar Road Side Strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-04","endDate":"2026-05-15","lengthM":720,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sahir-amar-shaikh-marg-g-s-2025-11-07","sourceKey":"sahir-amar-shaikh-marg-g-s-2025-11-07","firstSeen":"2026-07-04","state":{"roadName":"Sahir Amar Shaikh marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-07","endDate":"2026-05-31","lengthM":133,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sahkar-nagar-road-no-1-m-w-2023-03-04","sourceKey":"sahkar-nagar-road-no-1-m-w-2023-03-04","firstSeen":"2026-07-04","state":{"roadName":"Sahkar Nagar Road No. 1","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-03-04","endDate":"2024-02-29","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sai-baba-nagar-road-extention-veena-santoor-building-road-r-c-2024-10-01","sourceKey":"sai-baba-nagar-road-extention-veena-santoor-building-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sai Baba Nagar Road Extention, (Veena Santoor Building Road)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-24","lengthM":222,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sai-baba-road-h-e-x","sourceKey":"sai-baba-road-h-e-x","firstSeen":"2026-07-04","state":{"roadName":"Sai Baba Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2026-05-14","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sai-mandir-to-ambedakar-chowk-p-n-2023-11-20","sourceKey":"sai-mandir-to-ambedakar-chowk-p-n-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Sai Mandir to Ambedakar Chowk","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-20","endDate":"2024-05-01","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sai-nagar-road-k-e-x","sourceKey":"sai-nagar-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Sai Nagar Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Deleted","startDate":null,"endDate":null,"lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sai-nagar-road-veeer-savarkar-marg-to-sai-nagar-bhandup-east-s-2024-12-07","sourceKey":"sai-nagar-road-veeer-savarkar-marg-to-sai-nagar-bhandup-east-s-2024-12-07","firstSeen":"2026-07-04","state":{"roadName":"Sai Nagar Road, veeer Savarkar Marg to Sai nagar, Bhandup East","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-07","endDate":"2027-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sai-road-goregaon-e-p-s-2023-10-09","sourceKey":"sai-road-goregaon-e-p-s-2023-10-09","firstSeen":"2026-07-04","state":{"roadName":"Sai Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"In Progress","startDate":"2023-10-09","endDate":"2026-05-31","lengthM":925,"pqcPercentProgress":64.86,"pqcCompletedOn":null},"changes":[]},
{"id":"saibaba-lane-ghatkopar-east-n-x","sourceKey":"saibaba-lane-ghatkopar-east-n-x","firstSeen":"2026-07-04","state":{"roadName":"Saibaba lane,Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":113,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"saibaba-marg-h-w-2024-03-01","sourceKey":"saibaba-marg-h-w-2024-03-01","firstSeen":"2026-07-04","state":{"roadName":"Saibaba Marg","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2024-03-01","endDate":"2026-05-31","lengthM":185,"pqcPercentProgress":54.05,"pqcCompletedOn":null},"changes":[]},
{"id":"saibaba-nagar-main-road-side-strip-r-c-x","sourceKey":"saibaba-nagar-main-road-side-strip-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Saibaba Nagar Main Road Side Strip","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"saibaba-park-road-malad-w-p-n-2023-11-02","sourceKey":"saibaba-park-road-malad-w-p-n-2023-11-02","firstSeen":"2026-07-04","state":{"roadName":"Saibaba Park Road Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-02","endDate":"2024-02-01","lengthM":530,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"saidham-mandir-road-malad-e-p-n-2025-10-01","sourceKey":"saidham-mandir-road-malad-e-p-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Saidham Mandir Road , Malad (E )","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"saint-pius-road-t-2023-11-02","sourceKey":"saint-pius-road-t-2023-11-02","firstSeen":"2026-07-04","state":{"roadName":"Saint Pius road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-02","endDate":"2024-05-01","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sakharam-balaji-pawar-marg-g-s-2025-11-11","sourceKey":"sakharam-balaji-pawar-marg-g-s-2025-11-11","firstSeen":"2026-07-04","state":{"roadName":"Sakharam Balaji Pawar Marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-11","endDate":"2026-05-10","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sakharam-keer-marg-g-n-x","sourceKey":"sakharam-keer-marg-g-n-x","firstSeen":"2026-07-04","state":{"roadName":"Sakharam Keer Marg","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"On Hold","startDate":null,"endDate":"2026-05-31","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sakharam-lanjekar-marg-f-s-2025-11-03","sourceKey":"sakharam-lanjekar-marg-f-s-2025-11-03","firstSeen":"2026-07-04","state":{"roadName":"Sakharam Lanjekar Marg","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-03","endDate":"2027-01-18","lengthM":400,"pqcPercentProgress":43.75,"pqcCompletedOn":null},"changes":[]},
{"id":"saki-vihar-sauccer-portion-near-petrol-pump-junction-l-2025-10-01","sourceKey":"saki-vihar-sauccer-portion-near-petrol-pump-junction-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Saki Vihar Sauccer portion near Petrol Pump Junction","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":90,"pqcPercentProgress":87.78,"pqcCompletedOn":"2026-01-18"},"changes":[]},
{"id":"salpadevi-pada-road-t-2025-11-19","sourceKey":"salpadevi-pada-road-t-2025-11-19","firstSeen":"2026-07-04","state":{"roadName":"Salpadevi Pada Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-19","endDate":"2026-04-03","lengthM":223,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samaj-mandir-road-h-e-2024-01-03","sourceKey":"samaj-mandir-road-h-e-2024-01-03","firstSeen":"2026-07-04","state":{"roadName":"Samaj Mandir Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-01-03","endDate":"2025-05-31","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samantbhai-nanji-marg-b-x","sourceKey":"samantbhai-nanji-marg-b-x","firstSeen":"2026-07-04","state":{"roadName":"Samantbhai Nanji Marg","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-02-28","lengthM":475,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Samantbhai Nanji Marg","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-02-28","lengthM":475,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"samarth-nagar-road-quarry-road-to-mhada-office-bhandup-w-s-2025-10-01","sourceKey":"samarth-nagar-road-quarry-road-to-mhada-office-bhandup-w-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Samarth Nagar Road, Quarry Road to MHADA office, Bhandup (W).","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":280,"pqcPercentProgress":61.43,"pqcCompletedOn":null},"changes":[]},
{"id":"samarth-nagar-road-road-taken-for-widening-existing-width-6m-wide-road-k-e-x","sourceKey":"samarth-nagar-road-road-taken-for-widening-existing-width-6m-wide-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Samarth Nagar Road (Road taken for Widening, Existing Width 6m Wide Road)","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2027-04-26","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samarth-ramdas-marg-side-strips-k-w-2025-04-27","sourceKey":"samarth-ramdas-marg-side-strips-k-w-2025-04-27","firstSeen":"2026-07-04","state":{"roadName":"Samarth Ramdas Marg Side Strips","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-04-27","endDate":"2026-03-31","lengthM":850,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samata-nagar-road-kandivali-e-r-s-2023-10-26","sourceKey":"samata-nagar-road-kandivali-e-r-s-2023-10-26","firstSeen":"2026-07-04","state":{"roadName":"Samata Nagar Road , Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-10-26","endDate":"2026-05-31","lengthM":530,"pqcPercentProgress":100,"pqcCompletedOn":null},"changes":[]},
{"id":"samata-nagar-road-kandivali-e-r-s-2025-10-01","sourceKey":"samata-nagar-road-kandivali-e-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Samata Nagar Road, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":375,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samata-school-road-kandivali-e-r-s-2025-10-01","sourceKey":"samata-school-road-kandivali-e-r-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Samata School Road, Kandivali (E)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sambhaji-marg-n-2026-01-01","sourceKey":"sambhaji-marg-n-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Sambhaji Marg","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2026-01-01","endDate":"2026-12-31","lengthM":465,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sambhar-gully-nehru-nagar-l-x","sourceKey":"sambhar-gully-nehru-nagar-l-x","firstSeen":"2026-09-29","state":{"roadName":"Sambhar gully nehru nagar","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samir-chandavarkar-road-kandivali-w-r-s-2023-11-22","sourceKey":"samir-chandavarkar-road-kandivali-w-r-s-2023-11-22","firstSeen":"2026-07-04","state":{"roadName":"Samir Chandavarkar Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-22","endDate":"2025-02-22","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samrat-ashok-nagar-marg-l-2023-11-01","sourceKey":"samrat-ashok-nagar-marg-l-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Samrat Ashok Nagar Marg","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-01","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samta-nagar-road-no-1-kandivali-e-r-s-2023-12-01","sourceKey":"samta-nagar-road-no-1-kandivali-e-r-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Samta Nagar Road No. 1, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-01","endDate":"2024-11-30","lengthM":211,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samta-nagar-road-no-3-kandivali-e-r-s-2023-10-24","sourceKey":"samta-nagar-road-no-3-kandivali-e-r-s-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Samta Nagar Road no.3, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2024-11-30","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samta-school-road-samata-nagar-kandivali-e-r-s-2023-10-24","sourceKey":"samta-school-road-samata-nagar-kandivali-e-r-s-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Samta School Road, Samata Nagar, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2024-11-30","lengthM":245,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"samual-road-from-gmlr-to-ashford-bldg-nahur-west-s-2025-01-07","sourceKey":"samual-road-from-gmlr-to-ashford-bldg-nahur-west-s-2025-01-07","firstSeen":"2026-07-04","state":{"roadName":"Samual Road from GMLR to Ashford Bldg. Nahur West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-01-07","endDate":"2027-02-28","lengthM":150,"pqcPercentProgress":66.67,"pqcCompletedOn":null},"changes":[]},
{"id":"sane-guruji-road-goregaon-west-p-s-2024-10-15","sourceKey":"sane-guruji-road-goregaon-west-p-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Sane Guruji Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-15","endDate":"2026-05-31","lengthM":443,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sane-guruji-road-h-w-2026-04-01","sourceKey":"sane-guruji-road-h-w-2026-04-01","firstSeen":"2026-07-04","state":{"roadName":"Sane Guruji Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-04-01","endDate":"2027-05-31","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sanghani-estate-road-n-2024-01-08","sourceKey":"sanghani-estate-road-n-2024-01-08","firstSeen":"2026-07-04","state":{"roadName":"Sanghani Estate Road","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-08","endDate":"2026-01-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sankalp-bldg-to-a-k-vaidya-road-malad-e-p-n-2024-10-31","sourceKey":"sankalp-bldg-to-a-k-vaidya-road-malad-e-p-n-2024-10-31","firstSeen":"2026-07-04","state":{"roadName":"Sankalp Bldg. to A K Vaidya Road Malad (E)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-31","endDate":"2026-05-31","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sanman-sing-road-bhandup-west-s-x","sourceKey":"sanman-sing-road-bhandup-west-s-x","firstSeen":"2026-07-04","state":{"roadName":"Sanman Sing Road, Bhandup West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-04-30","lengthM":636,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-chokha-mela-marg-k-e-2025-10-30","sourceKey":"sant-chokha-mela-marg-k-e-2025-10-30","firstSeen":"2026-07-04","state":{"roadName":"Sant Chokha Mela Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-30","endDate":"2026-05-14","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-dnyaneshar-road-t-x","sourceKey":"sant-dnyaneshar-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Sant Dnyaneshar Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-05-07","lengthM":157,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-20","field":"startDate","from":null,"to":"2026-01-01"}]},
{"id":"sant-dyaneshvar-road-k-w-2025-11-30","sourceKey":"sant-dyaneshvar-road-k-w-2025-11-30","firstSeen":"2026-07-04","state":{"roadName":"Sant Dyaneshvar Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-11-30","endDate":"2027-05-20","lengthM":440,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-dyaneshwar-mandir-marg-h-e-2026-02-04","sourceKey":"sant-dyaneshwar-mandir-marg-h-e-2026-02-04","firstSeen":"2026-07-04","state":{"roadName":"Sant Dyaneshwar Mandir Marg","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-02-04","endDate":"2027-05-23","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-gora-kumbhar-road-r-n-2024-10-10","sourceKey":"sant-gora-kumbhar-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Sant Gora Kumbhar Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":157,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-janabai-x-road-k-e-2025-10-30","sourceKey":"sant-janabai-x-road-k-e-2025-10-30","firstSeen":"2026-07-04","state":{"roadName":"Sant janabai X Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-30","endDate":"2026-04-30","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-kabir-marg-dahisar-e-shingate-compound-to-dead-end-r-n-x","sourceKey":"sant-kabir-marg-dahisar-e-shingate-compound-to-dead-end-r-n-2025-02-21","firstSeen":"2026-07-04","state":{"roadName":"Sant Kabir Marg Dahisar (E) - Shingate Compound to Dead End","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-02-21","endDate":"2026-02-05","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-22","field":"status","from":"Not Started","to":"Completed"},{"on":"2026-10-22","field":"startDate","from":null,"to":"2025-02-21"}]},
{"id":"sant-kakaiya-marg-m-e-2024-01-24","sourceKey":"sant-kakaiya-marg-m-e-2024-01-24","firstSeen":"2026-07-04","state":{"roadName":"Sant Kakaiya Marg","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-01-24","endDate":"2026-05-31","lengthM":705,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-mary-s-road-h-e-2023-04-24","sourceKey":"sant-mary-s-road-h-e-2023-04-24","firstSeen":"2026-07-04","state":{"roadName":"Sant Mary's Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-24","endDate":"2024-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-meerabai-road-dahisar-e-r-n-2025-10-15","sourceKey":"sant-meerabai-road-dahisar-e-r-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Sant Meerabai Road, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-15","endDate":"2026-05-17","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-mukta-bai-road-k-e-2025-10-01","sourceKey":"sant-mukta-bai-road-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sant Mukta Bai Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-25","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-namdev-road-dahisar-e-r-n-x","sourceKey":"sant-namdev-road-dahisar-e-r-n-x","firstSeen":"2026-07-04","state":{"roadName":"Sant Namdev Road, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":null,"endDate":null,"lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-narsi-mehta-marg-n-2024-11-19","sourceKey":"sant-narsi-mehta-marg-n-2024-11-19","firstSeen":"2026-07-04","state":{"roadName":"Sant Narsi Mehta Marg","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-11-19","endDate":"2026-11-15","lengthM":740,"pqcPercentProgress":75.64,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-savta-mali-road-r-n-2024-10-10","sourceKey":"sant-savta-mali-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Sant Savta Mali Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":202,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-tukaram-road-t-2026-01-01","sourceKey":"sant-tukaram-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Sant Tukaram Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-01","endDate":"2026-11-20","lengthM":265,"pqcPercentProgress":30.19,"pqcCompletedOn":null},"changes":[]},
{"id":"sant-tukaram-road-y-m-road-to-devji-ratansing-marg-b-2025-11-01","sourceKey":"sant-tukaram-road-y-m-road-to-devji-ratansing-marg-b-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sant Tukaram Road (Y M Road to Devji Ratansing Marg)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-02-28","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"santaji-dhanaji-road-malad-east-p-n-2024-05-01","sourceKey":"santaji-dhanaji-road-malad-east-p-n-2024-05-01","firstSeen":"2026-07-04","state":{"roadName":"Santaji Dhanaji Road, Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-05-01","endDate":"2026-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"santoshi-mata-road-malad-e-p-n-2024-05-01","sourceKey":"santoshi-mata-road-malad-e-p-n-2024-05-01","firstSeen":"2026-07-04","state":{"roadName":"Santoshi Mata road , Malad (E)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-05-01","endDate":"2025-01-01","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"saraf-choudhary-road-thakur-complex-kandivali-e-r-s-2023-10-24","sourceKey":"saraf-choudhary-road-thakur-complex-kandivali-e-r-s-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Saraf Choudhary Road, Thakur Complex, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2024-11-30","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"saraf-nagar-road-malad-east-p-n-2024-02-15","sourceKey":"saraf-nagar-road-malad-east-p-n-2024-02-15","firstSeen":"2026-07-04","state":{"roadName":"Saraf Nagar Road, Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-02-15","endDate":"2024-05-01","lengthM":149,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sarang-street-b-x","sourceKey":"sarang-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Sarang Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":315,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sarogini-naidu-road-kandivali-w-r-s-2024-10-01","sourceKey":"sarogini-naidu-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sarogini Naidu Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sarojini-marg-h-w-2025-10-01","sourceKey":"sarojini-marg-h-w-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sarojini marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2025-10-01","endDate":"2027-03-31","lengthM":524,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sarojini-road-1-k-w-2024-10-01","sourceKey":"sarojini-road-1-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sarojini Road-1","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-31","lengthM":854,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sarojini-road-2-k-w-2024-10-01","sourceKey":"sarojini-road-2-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sarojini Road-2","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sarvodaya-nagar-road-guru-govind-singh-road-extension-k-e-2025-04-01","sourceKey":"sarvodaya-nagar-road-guru-govind-singh-road-extension-k-e-2025-04-01","firstSeen":"2026-07-04","state":{"roadName":"Sarvodaya nagar Road,Guru Govind singh Road Extension","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-04-01","endDate":"2026-05-30","lengthM":435,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sasmira-marg-g-s-2024-11-26","sourceKey":"sasmira-marg-g-s-2024-11-26","firstSeen":"2026-07-04","state":{"roadName":"Sasmira marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-26","endDate":"2025-05-31","lengthM":265,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"satbakada-road-goregaon-west-p-s-2025-10-03","sourceKey":"satbakada-road-goregaon-west-p-s-2025-10-03","firstSeen":"2026-07-04","state":{"roadName":"Satbakada Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-03","endDate":"2026-04-18","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sathe-nagar-road-m-e-2025-10-01","sourceKey":"sathe-nagar-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sathe Nagar Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2027-04-30","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-08-15","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"satya-nagar-cross-road-1-r-c-2024-10-01","sourceKey":"satya-nagar-cross-road-1-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Satya Nagar Cross Road 1","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":113,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"satya-nagar-cross-road-2-r-c-2024-10-01","sourceKey":"satya-nagar-cross-road-2-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Satya Nagar Cross Road 2","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":66,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"satya-nagar-cross-road-3-r-c-2024-11-25","sourceKey":"satya-nagar-cross-road-3-r-c-2024-11-25","firstSeen":"2026-07-04","state":{"roadName":"Satya Nagar Cross Road 3","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-11-25","endDate":"2025-03-31","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"savitribai-phule-marg-m-e-2025-10-01","sourceKey":"savitribai-phule-marg-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Savitribai Phule Marg","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2027-02-20","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-08-15","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"savtamali-to-n-g-park-dahisar-e-thakkar-avenue-bldg-to-n-g-park-bldg-no-03-r-n-x","sourceKey":"savtamali-to-n-g-park-dahisar-e-thakkar-avenue-bldg-to-n-g-park-bldg-no-03-r-n-2025-02-21","firstSeen":"2026-07-04","state":{"roadName":"Savtamali to N G Park Dahisar (E) - Thakkar Avenue bldg. To N.G. Park Bldg. No.03","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-21","endDate":"2026-05-30","lengthM":443,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"Not Started","to":"Completed"},{"on":"2026-10-13","field":"startDate","from":null,"to":"2025-02-21"}]},
{"id":"sayyed-mukri-street-b-2026-01-01","sourceKey":"sayyed-mukri-street-b-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Sayyed Mukri Street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-01-01","endDate":"2026-04-30","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sclr-side-strips-sg-barve-w-junc-to-police-beat-chowky-shantinagar-underpass-l-x","sourceKey":"sclr-side-strips-sg-barve-w-junc-to-police-beat-chowky-shantinagar-underpass-l-x","firstSeen":"2026-07-04","state":{"roadName":"SCLR Side strips SG Barve (W) junc. to Police beat chowky Shantinagar underpass","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"senroof-road-t-2025-02-10","sourceKey":"senroof-road-t-2025-02-10","firstSeen":"2026-07-04","state":{"roadName":"Senroof Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-02-10","endDate":"2026-03-01","lengthM":474,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"seth-khimaji-tejukaya-j-p-road-schem-no-5-road-no-32-dadar-matunga-f-n-x","sourceKey":"seth-khimaji-tejukaya-j-p-road-schem-no-5-road-no-32-dadar-matunga-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Seth Khimaji Tejukaya (J.P.) Road Schem No - 5, Road No. 32 (Dadar - Matunga)","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"seth-laxman-nagpurkar-road-malad-east-p-n-x","sourceKey":"seth-laxman-nagpurkar-road-malad-east-p-n-x","firstSeen":"2026-07-04","state":{"roadName":"Seth Laxman Nagpurkar road, Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Deleted","startDate":null,"endDate":"2025-12-26","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"setlwad-lane-d-2025-10-06","sourceKey":"setlwad-lane-d-2025-10-06","firstSeen":"2026-07-04","state":{"roadName":"Setlwad Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-06","endDate":"2026-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sewree-station-road-f-s-2024-11-18","sourceKey":"sewree-station-road-f-s-2024-11-18","firstSeen":"2026-07-04","state":{"roadName":"Sewree Station Road","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-18","endDate":"2025-05-31","lengthM":510,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"sg-barve-marg-side-strips-drain-from-kurla-west-station-to-sclr-l-2025-10-01","sourceKey":"sg-barve-marg-side-strips-drain-from-kurla-west-station-to-sclr-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"SG Barve Marg Side strips & drain from Kurla West station to SCLR","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":800,"pqcPercentProgress":18.75,"pqcCompletedOn":"2026-01-18"},"changes":[]},
{"id":"shahaji-raje-marg-side-strip-k-e-x","sourceKey":"shahaji-raje-marg-side-strip-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Shahaji Raje Marg Side strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shaheed-bhagat-singh-marg-kurla-terminus-road-n-2023-04-29","sourceKey":"shaheed-bhagat-singh-marg-kurla-terminus-road-n-2023-04-29","firstSeen":"2026-07-04","state":{"roadName":"Shaheed Bhagat Singh Marg (Kurla Terminus Road)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-04-29","endDate":"2026-02-28","lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shahid-mangal-pandey-road-t-2026-01-01","sourceKey":"shahid-mangal-pandey-road-t-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Shahid Mangal Pandey Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-17","lengthM":153,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shahir-kisan-kharat-marg-ghatkopar-w-n-x","sourceKey":"shahir-kisan-kharat-marg-ghatkopar-w-n-x","firstSeen":"2026-07-04","state":{"roadName":"Shahir Kisan Kharat Marg Ghatkopar (W)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-06","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-06","before":{"roadName":"Shahir Kisan Kharat Marg Ghatkopar (W)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"shaikh-memon-street-c-2024-11-19","sourceKey":"shaikh-memon-street-c-2024-11-19","firstSeen":"2026-07-04","state":{"roadName":"Shaikh Memon Street","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-19","endDate":"2026-02-05","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"shailendra-nagar-school-road-r-n-2024-10-10","sourceKey":"shailendra-nagar-school-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Shailendra Nagar School Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-03-31","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shakti-mill-lane-g-s-2025-11-15","sourceKey":"shakti-mill-lane-g-s-2025-11-15","firstSeen":"2026-07-04","state":{"roadName":"Shakti Mill Lane","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-15","endDate":"2027-03-27","lengthM":505,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shamaldas-gandhi-marg-c-2024-12-01","sourceKey":"shamaldas-gandhi-marg-c-x","firstSeen":"2026-07-04","state":{"roadName":"Shamaldas Gandhi Marg","ward":"C","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":910,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Deleted"},{"on":"2026-10-14","field":"startDate","from":"2024-12-01","to":null}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Shamaldas Gandhi Marg","ward":"C","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-12-01","endDate":"2027-05-10","lengthM":910,"pqcPercentProgress":43.31,"pqcCompletedOn":null}}]},
{"id":"shamrao-vitthal-marg-d-2025-11-01","sourceKey":"shamrao-vitthal-marg-d-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Shamrao Vitthal Marg","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shamshuddin-nagar-road-aklr-to-sun-sagar-darshan-l-x","sourceKey":"shamshuddin-nagar-road-aklr-to-sun-sagar-darshan-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shamshuddin Nagar Road (AKLR to Sun Sagar Darshan)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":210,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-27","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-27","field":"startDate","from":null,"to":"2025-10-01"}]},
{"id":"shankar-mattham-road-f-n-2024-12-23","sourceKey":"shankar-mattham-road-f-n-2024-12-23","firstSeen":"2026-07-04","state":{"roadName":"Shankar Mattham Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-12-23","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shankarrao-chavan-marg-p-n-2023-10-02","sourceKey":"shankarrao-chavan-marg-p-n-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Shankarrao Chavan Marg","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-02","endDate":"2024-05-01","lengthM":710,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shankarrao-naram-path-g-s-2025-10-10","sourceKey":"shankarrao-naram-path-g-s-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Shankarrao Naram Path","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-10","endDate":"2027-05-31","lengthM":971,"pqcPercentProgress":39.65,"pqcCompletedOn":null},"changes":[]},
{"id":"shankarrao-pupla-marg-e-2026-04-24","sourceKey":"shankarrao-pupla-marg-e-2026-04-24","firstSeen":"2026-07-04","state":{"roadName":"Shankarrao Pupla Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-04-24","endDate":"2026-06-03","lengthM":530,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shankarseth-road-bhaji-gully-d-x","sourceKey":"shankarseth-road-bhaji-gully-d-x","firstSeen":"2026-07-04","state":{"roadName":"Shankarseth Road (Bhaji Gully)","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shanta-jog-marg-from-p-l-lokhande-marg-to-below-tembe-bridge-m-w-2023-11-01","sourceKey":"shanta-jog-marg-from-p-l-lokhande-marg-to-below-tembe-bridge-m-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Shanta Jog Marg from P. L. Lokhande Marg to below Tembe Bridge","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-25","lengthM":255,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shantabai-jayaram-mhatre-marg-r-c-2024-10-01","sourceKey":"shantabai-jayaram-mhatre-marg-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shantabai Jayaram Mhatre Marg","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shanti-ashram-road-r-n-2024-10-01","sourceKey":"shanti-ashram-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shanti Ashram Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-27","lengthM":43,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shanti-nagar-road-h-e-x","sourceKey":"shanti-nagar-road-h-e-x","firstSeen":"2026-07-04","state":{"roadName":"Shanti Nagar Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-03-30","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shanti-path-marg-only-side-strips-ghatkopar-east-n-2023-10-21","sourceKey":"shanti-path-marg-only-side-strips-ghatkopar-east-n-2023-10-21","firstSeen":"2026-07-04","state":{"roadName":"Shanti Path Marg (only Side Strips),Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-21","endDate":"2024-05-31","lengthM":1400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shantilal-cross-road-no-2-kandivali-w-r-s-2024-10-15","sourceKey":"shantilal-cross-road-no-2-kandivali-w-r-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Shantilal Cross Road No.2 Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-10-15","endDate":"2025-01-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shantilal-modi-road-s-v-road-to-mathuradas-road-kandivali-w-r-s-2023-10-24","sourceKey":"shantilal-modi-road-s-v-road-to-mathuradas-road-kandivali-w-r-s-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Shantilal Modi Road, S.V. Road to Mathuradas road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2025-02-22","lengthM":880,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sharda-devi-marg-h-e-2025-01-02","sourceKey":"sharda-devi-marg-h-e-2025-01-02","firstSeen":"2026-07-04","state":{"roadName":"Sharda Devi marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-02","endDate":"2025-05-20","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shashikant-laxman-sawant-road-k-w-2024-10-01","sourceKey":"shashikant-laxman-sawant-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shashikant Laxman Sawant Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":245,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shastri-nagar-road-l-2025-03-01","sourceKey":"shastri-nagar-road-l-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"Shastri Nagar road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-03-01","endDate":"2025-05-31","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shastri-nagar-road-no-02-k-w-2023-12-15","sourceKey":"shastri-nagar-road-no-02-k-w-2023-12-15","firstSeen":"2026-07-04","state":{"roadName":"Shastri Nagar Road No. 02","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-15","endDate":"2024-05-24","lengthM":378,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shastri-nagar-road-no-2-goregaon-w-p-s-2023-04-07","sourceKey":"shastri-nagar-road-no-2-goregaon-w-p-s-2023-04-07","firstSeen":"2026-07-04","state":{"roadName":"Shastri Nagar Road No.2, Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-04-07","endDate":"2026-05-03","lengthM":425,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shastrinagar-road-no-1-k-w-2024-10-01","sourceKey":"shastrinagar-road-no-1-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shastrinagar Road no.1","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":317,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shayda-marg-b-2025-10-10","sourceKey":"shayda-marg-b-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Shayda Marg","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-10","endDate":"2026-05-31","lengthM":261,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sheetladevi-road-k-w-2023-11-09","sourceKey":"sheetladevi-road-k-w-2023-11-09","firstSeen":"2026-07-04","state":{"roadName":"Sheetladevi Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-09","endDate":"2024-05-24","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sherif-devji-street-b-x","sourceKey":"sherif-devji-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Sherif Devji Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":495,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sherly-rajan-road-h-w-2024-10-18","sourceKey":"sherly-rajan-road-h-w-2024-10-18","firstSeen":"2026-07-04","state":{"roadName":"Sherly rajan road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-18","endDate":"2026-04-09","lengthM":430,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sheth-bhagwandas-narottamdas-road-f-n-x","sourceKey":"sheth-bhagwandas-narottamdas-road-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Sheth Bhagwandas Narottamdas Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shetty-chemical-road-l-x","sourceKey":"shetty-chemical-road-l-x","firstSeen":"2026-09-29","state":{"roadName":"Shetty chemical road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":null,"lengthM":790,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shimpoli-cross-marg-1-r-c-2024-10-01","sourceKey":"shimpoli-cross-marg-1-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shimpoli Cross Marg-1","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shimpoli-cross-marg-2-r-c-2024-10-01","sourceKey":"shimpoli-cross-marg-2-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shimpoli Cross Marg-2","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shimpoli-village-road-r-c-2024-10-01","sourceKey":"shimpoli-village-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shimpoli Village road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":726,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shirdhankar-marg-g-s-2025-12-01","sourceKey":"shirdhankar-marg-g-s-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Shirdhankar Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-12-01","endDate":"2026-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shiv-srusti-road-from-eeh-to-m-w-ward-boundary-m-w-2026-02-01","sourceKey":"shiv-srusti-road-from-eeh-to-m-w-ward-boundary-m-w-2026-02-01","firstSeen":"2026-07-04","state":{"roadName":"Shiv Srusti Road from EEH To M/W ward Boundary","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-02-01","endDate":"2027-02-10","lengthM":140,"pqcPercentProgress":92.86,"pqcCompletedOn":null},"changes":[]},
{"id":"shiv-vallab-cross-road-dahisar-e-gokuland-hotel-to-umesh-apt-r-n-x","sourceKey":"shiv-vallab-cross-road-dahisar-e-gokuland-hotel-to-umesh-apt-r-n-2025-02-21","firstSeen":"2026-07-04","state":{"roadName":"Shiv Vallab Cross Road Dahisar (E) - Gokuland Hotel to Umesh Apt.","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-02-21","endDate":"2026-05-30","lengthM":620,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"Not Started","to":"Completed"},{"on":"2026-10-13","field":"startDate","from":null,"to":"2025-02-21"}]},
{"id":"shivaji-chowk-road-malad-e-part-a-p-n-2024-10-01","sourceKey":"shivaji-chowk-road-malad-e-part-a-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Chowk Road Malad (E) Part A","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-12-31","lengthM":530,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-chowk-road-malad-e-part-b-p-n-2024-10-25","sourceKey":"shivaji-chowk-road-malad-e-part-b-p-n-2024-10-25","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Chowk Road Malad (E) Part B","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-25","endDate":"2026-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-90ft-dp-road-side-strips-m-e-2024-10-01","sourceKey":"shivaji-nagar-90ft-dp-road-side-strips-m-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar 90ft DP Road (Side Strips)","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-10-01","endDate":"2026-12-31","lengthM":1000,"pqcPercentProgress":42.5,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-colony-internal-road-h-e-2025-12-03","sourceKey":"shivaji-nagar-colony-internal-road-h-e-2025-12-03","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Colony Internal Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-03","endDate":"2026-05-10","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-rd-no-1-m-e-x","sourceKey":"shivaji-nagar-rd-no-1-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Rd No 1","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-05-05","lengthM":595,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-1-malad-east-p-n-2023-10-31","sourceKey":"shivaji-nagar-road-no-1-malad-east-p-n-2023-10-31","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar road No. 1, Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-31","endDate":"2025-05-31","lengthM":980,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-10-m-e-2025-10-15","sourceKey":"shivaji-nagar-road-no-10-m-e-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Road No 10","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-15","endDate":"2027-03-13","lengthM":540,"pqcPercentProgress":31.48,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-13-anjuman-bharat-nagar-masjid-to-90-road-m-e-2026-10-01","sourceKey":"shivaji-nagar-road-no-13-anjuman-bharat-nagar-masjid-to-90-road-m-e-2026-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Road no.13 Anjuman Bharat Nagar Masjid to 90' Road","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-10-01","endDate":"2026-12-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-15-m-e-2026-03-01","sourceKey":"shivaji-nagar-road-no-15-m-e-2026-03-01","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Road No. 15","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2026-03-01","endDate":"2026-05-31","lengthM":620,"pqcPercentProgress":96.77,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-2-malad-east-p-n-2023-10-31","sourceKey":"shivaji-nagar-road-no-2-malad-east-p-n-2023-10-31","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar road no. 2 , Malad (East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-31","endDate":"2025-05-31","lengthM":780,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-4-no-swd-work-in-scope-m-e-2023-12-10","sourceKey":"shivaji-nagar-road-no-4-no-swd-work-in-scope-m-e-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Road No. 4 (No SWD Work in Scope)","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-10","endDate":"2025-12-19","lengthM":670,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-6-no-swd-work-in-scope-m-e-2024-02-02","sourceKey":"shivaji-nagar-road-no-6-no-swd-work-in-scope-m-e-2024-02-02","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Road No. 6 (No SWD Work in Scope)","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-02-02","endDate":"2026-03-31","lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-8-m-e-2025-10-01","sourceKey":"shivaji-nagar-road-no-8-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Road No 8","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-03-31","lengthM":670,"pqcPercentProgress":34.33,"pqcCompletedOn":null},"changes":[]},
{"id":"shivaji-nagar-road-no-9-m-e-2025-10-01","sourceKey":"shivaji-nagar-road-no-9-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shivaji Nagar Road No. 9","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":570,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivam-vidyalay-road-lallubhai-compound-m-e-x","sourceKey":"shivam-vidyalay-road-lallubhai-compound-m-e-x","firstSeen":"2026-07-04","state":{"roadName":"Shivam vidyalay road (Lallubhai compound)","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2026-06-10","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivpuri-road-m-w-x","sourceKey":"shivpuri-road-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Shivpuri Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2026-10-15","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivsagar-ram-gulam-marg-a-x","sourceKey":"shivsagar-ram-gulam-marg-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shivsagar Ram Gulam Marg","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":300,"pqcPercentProgress":0,"pqcCompletedOn":null},"changes":[{"on":"2026-10-19","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-19","field":"startDate","from":null,"to":"2025-10-01"}]},
{"id":"shivshakti-nagar-road-mukund-nagar-pap-road-m-w-2023-11-15","sourceKey":"shivshakti-nagar-road-mukund-nagar-pap-road-m-w-2023-11-15","firstSeen":"2026-07-04","state":{"roadName":"Shivshakti Nagar Road (Mukund Nagar PAP Road)","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-15","endDate":"2025-05-01","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivshrushti-internal-road-l-shape-road-l-2023-12-18","sourceKey":"shivshrushti-internal-road-l-shape-road-l-2023-12-18","firstSeen":"2026-07-04","state":{"roadName":"Shivshrushti Internal Road (L Shape road)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-18","endDate":"2024-01-19","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shivshrushti-l-shape-internal-road-kurla-east-l-2025-10-01","sourceKey":"shivshrushti-l-shape-internal-road-kurla-east-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shivshrushti L shape internal road, Kurla (East)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-20","lengthM":435,"pqcPercentProgress":18.39,"pqcCompletedOn":null},"changes":[]},
{"id":"shivshrusti-road-side-stripes-of-both-side-from-s-g-barve-marg-to-swami-vivekanand-school-l-2023-01-15","sourceKey":"shivshrusti-road-side-stripes-of-both-side-from-s-g-barve-marg-to-swami-vivekanand-school-l-2023-01-15","firstSeen":"2026-07-04","state":{"roadName":"Shivshrusti Road (Side Stripes of both side) From S.G. Barve Marg to Swami Vivekanand School","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-01-15","endDate":"2025-05-10","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shraddhanand-road-f-n-2025-10-01","sourceKey":"shraddhanand-road-f-n-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shraddhanand Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-03-31","lengthM":360,"pqcPercentProgress":30.56,"pqcCompletedOn":null},"changes":[]},
{"id":"shradhanand-x-road-f-n-2025-11-03","sourceKey":"shradhanand-x-road-f-n-2025-11-03","firstSeen":"2026-07-04","state":{"roadName":"Shradhanand X Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-03","endDate":"2027-03-31","lengthM":240,"pqcPercentProgress":83.33,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-hanuman-mandir-road-old-mhb-colony-internal-road-r-c-2024-10-01","sourceKey":"shree-hanuman-mandir-road-old-mhb-colony-internal-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Hanuman Mandir Road, Old MHB colony Internal Road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":40,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-10-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-10-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-10","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":49,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-11-r-c-2025-10-01","sourceKey":"shree-krishna-nagar-road-no-11-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-11","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-25","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-12-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-12-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-12","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":212,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-14-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-14-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-14","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":53,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-15-r-c-2025-10-01","sourceKey":"shree-krishna-nagar-road-no-15-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-15","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-30","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-3-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-3-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-3","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-4-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-4-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-4","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-04","lengthM":166,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-5-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-5-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-5","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":137,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-6-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-6-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-6","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":111,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-8-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-8-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-8","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":78,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shree-krishna-nagar-road-no-9-r-c-2024-10-01","sourceKey":"shree-krishna-nagar-road-no-9-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shree Krishna Nagar Road no.-9","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-01-31","lengthM":181,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shreyas-colony-main-road-p-s-2026-02-16","sourceKey":"shreyas-colony-main-road-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"Shreyas Colony Main Road","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shreyas-colony-road-no-2-goregaon-e-p-s-2023-11-01","sourceKey":"shreyas-colony-road-no-2-goregaon-e-p-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Shreyas Colony Road No.2, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-24","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shri-adv-t-v-parmeshwaran-road-f-n-2024-12-01","sourceKey":"shri-adv-t-v-parmeshwaran-road-f-n-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Shri Adv T V Parmeshwaran Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-12-01","endDate":"2025-02-28","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shri-kanji-shivji-jain-marg-f-n-x","sourceKey":"shri-kanji-shivji-jain-marg-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Shri Kanji Shivji Jain Marg","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":115,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shri-krishna-society-to-kajupda-garden-road-l-x","sourceKey":"shri-krishna-society-to-kajupda-garden-road-l-x","firstSeen":"2026-07-04","state":{"roadName":"Shri krishna society to kajupda garden road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":null,"lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-16","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-16","before":{"roadName":"Shri krishna society to kajupda garden road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":null,"lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"shrimad-ramchandra-lane-n-2023-11-01","sourceKey":"shrimad-ramchandra-lane-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Shrimad Ramchandra Lane","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2024-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shrirang-sable-marg-side-strip-p-s-2026-02-16","sourceKey":"shrirang-sable-marg-side-strip-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"Shrirang Sable Marg (Side Strip)","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":1000,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shuklaji-street-d-x","sourceKey":"shuklaji-street-d-x","firstSeen":"2026-07-04","state":{"roadName":"Shuklaji Street","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-04-30","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shweta-sheltar-to-sidhivinayak-roase-building-road-p-n-2024-05-25","sourceKey":"shweta-sheltar-to-sidhivinayak-roase-building-road-p-n-2024-05-25","firstSeen":"2026-07-04","state":{"roadName":"Shweta Sheltar to Sidhivinayak & Roase Building Road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-05-25","endDate":"2025-05-01","lengthM":108,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"shyam-satsang-road-kandivali-w-r-s-2024-10-01","sourceKey":"shyam-satsang-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Shyam Satsang Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"siddharth-nagar-road-h-e-2024-12-01","sourceKey":"siddharth-nagar-road-h-e-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Siddharth Nagar Road","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-01","endDate":"2026-02-12","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"siddharth-nagar-road-no-19-goregaon-west-p-s-2024-10-10","sourceKey":"siddharth-nagar-road-no-19-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Siddharth Nagar Road no. 19, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":285,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"siddharth-nagar-road-no-2-goregaon-west-p-s-2025-10-01","sourceKey":"siddharth-nagar-road-no-2-goregaon-west-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Siddharth Nagar Road No.2, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-broken-c-c-panels-of-p-l-lokhande-marg-from-amar-mahal-junction-to-m-w-boundary-m-w-2023-11-01","sourceKey":"side-strip-broken-c-c-panels-of-p-l-lokhande-marg-from-amar-mahal-junction-to-m-w-boundary-m-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Side strip & broken C. C. Panels of P. L. Lokhande Marg from Amar Mahal Junction to M/W Boundary","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-15","lengthM":1030,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-footpath-of-d-k-sandu-marg-from-v-n-purav-marg-to-r-c-marg-m-w-2024-11-01","sourceKey":"side-strip-footpath-of-d-k-sandu-marg-from-v-n-purav-marg-to-r-c-marg-m-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Side strip & footpath of D. K. Sandu Marg from V.N. Purav Marg to R.C. Marg","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-11-01","endDate":"2026-04-06","lengthM":1130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-footpath-of-janardan-patil-marg-from-diamond-garden-to-ghatla-bmc-school-m-w-2023-11-30","sourceKey":"side-strip-footpath-of-janardan-patil-marg-from-diamond-garden-to-ghatla-bmc-school-m-w-2023-11-30","firstSeen":"2026-07-04","state":{"roadName":"Side strip & footpath of Janardan Patil Marg from Diamond Garden to Ghatla BMC School","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-30","endDate":"2025-12-31","lengthM":655,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-33rd-road-h-w-x","sourceKey":"side-strip-of-33rd-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of 33rd Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2026-05-25","lengthM":480,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-90-feet-wide-dp-road-thakur-complex-kandivali-e-r-s-2023-11-01","sourceKey":"side-strip-of-90-feet-wide-dp-road-thakur-complex-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Side strip of 90 feet wide DP road, Thakur Complex, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":825,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-akurli-road-kandivali-e-r-s-x","sourceKey":"side-strip-of-akurli-road-kandivali-e-r-s-x","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Akurli road, kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-babasaheb-ambedkar-road-r-s-2023-10-24","sourceKey":"side-strip-of-babasaheb-ambedkar-road-r-s-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Babasaheb Ambedkar Road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2024-11-30","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-babrekar-nagar-road-r-s-2024-01-24","sourceKey":"side-strip-of-babrekar-nagar-road-r-s-2024-01-24","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Babrekar nagar Road","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2024-01-24","endDate":"2024-11-30","lengthM":900,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-borsapada-road-kandivali-w-r-s-2023-12-01","sourceKey":"side-strip-of-borsapada-road-kandivali-w-r-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Borsapada Road, Kandivali(W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-12-01","endDate":"2026-05-31","lengthM":1600,"pqcPercentProgress":84.06,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-c-d-road-h-w-2023-04-27","sourceKey":"side-strip-of-c-d-road-h-w-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of C D Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2025-12-21","lengthM":355,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-cst-road-h-e-2025-01-08","sourceKey":"side-strip-of-cst-road-h-e-2025-01-08","firstSeen":"2026-07-04","state":{"roadName":"Side strip of CST road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-08","endDate":"2026-05-29","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-damu-anna-date-road-kandivali-w-r-s-2023-10-20","sourceKey":"side-strip-of-damu-anna-date-road-kandivali-w-r-s-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Damu Anna Date Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-10-20","endDate":"2026-05-31","lengthM":700,"pqcPercentProgress":57.14,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-dr-ambedkar-road-h-w-2024-02-01","sourceKey":"side-strip-of-dr-ambedkar-road-h-w-2024-02-01","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Dr Ambedkar road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-02-01","endDate":"2025-05-31","lengthM":353,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-jangal-mangal-road-bhandup-w-s-2023-10-23","sourceKey":"side-strip-of-jangal-mangal-road-bhandup-w-s-2023-10-23","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Jangal Mangal Road,Bhandup(W).","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-23","endDate":"2026-05-31","lengthM":455,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-22","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"side-strip-of-k-c-marg-h-w-2023-10-01","sourceKey":"side-strip-of-k-c-marg-h-w-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of K C Marg","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2023-10-01","endDate":"2026-05-23","lengthM":1510,"pqcPercentProgress":84.77,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-k-t-soni-road-kandivali-w-r-s-2023-11-01","sourceKey":"side-strip-of-k-t-soni-road-kandivali-w-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Side strip of K.T. Soni Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-02-22","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-kadsiddeshwar-road-kandivali-w-r-s-2023-12-05","sourceKey":"side-strip-of-kadsiddeshwar-road-kandivali-w-r-s-2023-12-05","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Kadsiddeshwar Road Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-12-05","endDate":"2026-05-31","lengthM":2690,"pqcPercentProgress":96.1,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-kalina-kurla-road-h-e-x","sourceKey":"side-strip-of-kalina-kurla-road-h-e-x","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Kalina Kurla Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":null,"endDate":null,"lengthM":1200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-kanubhai-desai-marg-h-w-2026-01-21","sourceKey":"side-strip-of-kanubhai-desai-marg-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Kanubhai Desai Marg","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2026-01-21","endDate":"2026-05-31","lengthM":335,"pqcPercentProgress":65.67,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-lokhandwala-complex-road-kandivali-e-r-s-2023-11-22","sourceKey":"side-strip-of-lokhandwala-complex-road-kandivali-e-r-s-2023-11-22","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Lokhandwala Complex road, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-22","endDate":"2024-11-30","lengthM":1000,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-m-g-road-kandivali-w-r-s-2023-12-01","sourceKey":"side-strip-of-m-g-road-kandivali-w-r-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Side strip of M.G. Road , kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-12-01","endDate":"2024-11-30","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-mahavir-nagar-road-kandivali-w-r-s-2023-11-25","sourceKey":"side-strip-of-mahavir-nagar-road-kandivali-w-r-s-2023-11-25","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Mahavir Nagar Road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-25","endDate":"2026-05-31","lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-mahul-village-road-from-y-junction-to-bpcl-gate-m-w-2023-03-04","sourceKey":"side-strip-of-mahul-village-road-from-y-junction-to-bpcl-gate-m-w-2023-03-04","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Mahul Village Road from Y Junction to BPCL Gate","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-03-04","endDate":"2024-05-11","lengthM":1550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-manuel-gonsalves-road-h-w-2023-10-01","sourceKey":"side-strip-of-manuel-gonsalves-road-h-w-2023-10-01","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Manuel Gonsalves Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-01","endDate":"2025-02-28","lengthM":466,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-prabhadevi-cowk-120-feet-road-thakur-village-kandivali-e-r-s-2023-11-25","sourceKey":"side-strip-of-prabhadevi-cowk-120-feet-road-thakur-village-kandivali-e-r-s-2023-11-25","firstSeen":"2026-07-04","state":{"roadName":"Side strip of(Prabhadevi Cowk) 120 feet road, Thakur Village, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2023-11-25","endDate":"2026-05-31","lengthM":1105,"pqcPercentProgress":88.69,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-rajguru-flyover-kandivali-e-r-s-2023-11-25","sourceKey":"side-strip-of-rajguru-flyover-kandivali-e-r-s-2023-11-25","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Rajguru Flyover , Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-25","endDate":"2024-11-30","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-ram-mandir-road-h-e-2023-12-01","sourceKey":"side-strip-of-ram-mandir-road-h-e-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Ram Mandir Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2025-05-20","lengthM":325,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-relief-road-h-w-2024-02-01","sourceKey":"side-strip-of-relief-road-h-w-2024-02-01","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Relief Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2024-02-01","endDate":"2026-05-31","lengthM":770,"pqcPercentProgress":97.4,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-runwal-bhandup-west-s-2023-10-20","sourceKey":"side-strip-of-runwal-bhandup-west-s-2023-10-20","firstSeen":"2026-07-04","state":{"roadName":"Side Strip of Runwal, Bhandup West","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-20","endDate":"2024-06-10","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-s-v-road-kandivali-w-r-s-2023-11-25","sourceKey":"side-strip-of-s-v-road-kandivali-w-r-s-2023-11-25","firstSeen":"2026-07-04","state":{"roadName":"Side strip of S.V. road, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-25","endDate":"2026-05-31","lengthM":2100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strip-of-shankar-lane-kandivali-w-r-s-2023-11-25","sourceKey":"side-strip-of-shankar-lane-kandivali-w-r-s-2023-11-25","firstSeen":"2026-07-04","state":{"roadName":"Side strip of Shankar Lane, Kandivali (W)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-25","endDate":"2024-11-30","lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strips-of-jawaharlal-nehru-road-h-e-2023-04-27","sourceKey":"side-strips-of-jawaharlal-nehru-road-h-e-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"Side strips of Jawaharlal Nehru Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2023-04-27","endDate":"2026-05-31","lengthM":1800,"pqcPercentProgress":98.33,"pqcCompletedOn":null},"changes":[]},
{"id":"side-strips-of-road-no-11-tps-iii-h-e-2026-10-01","sourceKey":"side-strips-of-road-no-11-tps-iii-h-e-2026-10-01","firstSeen":"2026-10-20","state":{"roadName":"Side Strips of Road no. 11, TPS III","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sidestrip-of-juhu-road-h-w-x","sourceKey":"sidestrip-of-juhu-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Sidestrip of Juhu Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":400,"pqcPercentProgress":77,"pqcCompletedOn":null},"changes":[]},
{"id":"sikowa-industrial-road-n-x","sourceKey":"sikowa-industrial-road-n-x","firstSeen":"2026-07-04","state":{"roadName":"Sikowa Industrial Road","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":"2027-05-31","lengthM":325,"pqcPercentProgress":21.54,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-internal-road-from-plot-no-40-to-vaishnodevi-marg-junction-m-w-2025-11-01","sourceKey":"sindhi-society-internal-road-from-plot-no-40-to-vaishnodevi-marg-junction-m-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Internal Road From Plot no. 40 to Vaishnodevi Marg Junction","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-01","endDate":"2026-04-25","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-internal-road-from-plot-no-89-to-vaishnodevi-marg-junction-m-w-2024-11-01","sourceKey":"sindhi-society-internal-road-from-plot-no-89-to-vaishnodevi-marg-junction-m-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Internal Road From Plot No. 89 to Vaishnodevi Marg Junction)","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-30","lengthM":280,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-internal-road-from-police-beat-chowky-to-vaishnodevi-marg-junction-m-w-2024-11-01","sourceKey":"sindhi-society-internal-road-from-police-beat-chowky-to-vaishnodevi-marg-junction-m-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Internal Road from Police Beat Chowky to Vaishnodevi Marg Junction)","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-01","endDate":"2026-05-21","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-internal-road-from-vivekanand-jr-college-to-kala-road-m-w-2025-11-01","sourceKey":"sindhi-society-internal-road-from-vivekanand-jr-college-to-kala-road-m-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Internal Road from Vivekanand Jr. College to Kala Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-01","endDate":"2026-12-25","lengthM":220,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-internal-road-pink-corner-from-police-beat-chowky-to-hemu-kalani-road-junction-m-w-2024-11-01","sourceKey":"sindhi-society-internal-road-pink-corner-from-police-beat-chowky-to-hemu-kalani-road-junction-m-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Internal Road (Pink Corner) from Police Beat Chowky to Hemu Kalani Road Junction","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-15","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-road-no-1-from-chembur-heights-to-sindhi-society-gymkhana-m-w-2024-11-01","sourceKey":"sindhi-society-road-no-1-from-chembur-heights-to-sindhi-society-gymkhana-m-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Road No.1 from Chembur heights to Sindhi Society Gymkhana","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-15","lengthM":240,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-road-no-1-from-sindhi-society-gymkhana-to-plot-no-38a-vaishnodevi-marg-junction-m-w-2025-12-20","sourceKey":"sindhi-society-road-no-1-from-sindhi-society-gymkhana-to-plot-no-38a-vaishnodevi-marg-junction-m-w-2025-12-20","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Road No.1 from Sindhi Society Gymkhana to Plot no 38A(Vaishnodevi Marg Junction)","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-12-20","endDate":"2027-01-10","lengthM":435.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-road-no-2-from-hemu-kalani-marg-to-lal-dongar-road-m-w-2023-10-30","sourceKey":"sindhi-society-road-no-2-from-hemu-kalani-marg-to-lal-dongar-road-m-w-2023-10-30","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Road No. 2 from Hemu Kalani Marg to Lal Dongar Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-30","endDate":"2026-04-15","lengthM":618,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sindhi-society-vivekanand-college-road-from-aarey-milk-center-to-plot-no-113-m-w-2024-11-01","sourceKey":"sindhi-society-vivekanand-college-road-from-aarey-milk-center-to-plot-no-113-m-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Sindhi Society Vivekanand College Road From Aarey Milk Center to Plot No. 113","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-01","endDate":"2025-12-31","lengthM":178,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sing-estate-road-thakur-village-kandivali-east-r-s-2026-04-01","sourceKey":"sing-estate-road-thakur-village-kandivali-east-r-s-2026-04-01","firstSeen":"2026-10-22","state":{"roadName":"Sing Estate Road Thakur Village Kandivali East","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-04-01","endDate":"2027-01-15","lengthM":590,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sir-bhalchandra-road-f-n-2024-12-15","sourceKey":"sir-bhalchandra-road-f-n-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"Sir Bhalchandra Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2024-12-15","endDate":"2026-05-31","lengthM":200.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sir-pochkhanwala-road-g-s-x","sourceKey":"sir-pochkhanwala-road-g-s-x","firstSeen":"2026-07-04","state":{"roadName":"Sir Pochkhanwala Road","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sir-ratan-tata-path-d-2025-10-01","sourceKey":"sir-ratan-tata-path-d-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sir. Ratan Tata Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sitaphalwadi-road-e-2024-11-08","sourceKey":"sitaphalwadi-road-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Sitaphalwadi road","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-08","endDate":"2026-04-20","lengthM":184,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sitaram-deora-marg-a-road-a-2025-10-01","sourceKey":"sitaram-deora-marg-a-road-a-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sitaram Deora Marg (A  Road)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sitaram-jadav-marg-g-s-x","sourceKey":"sitaram-jadav-marg-g-s-x","firstSeen":"2026-07-04","state":{"roadName":"Sitaram Jadav Marg","ward":"G/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-01-31","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sitaram-poddar-marg-c-2024-09-27","sourceKey":"sitaram-poddar-marg-c-2024-09-27","firstSeen":"2026-07-04","state":{"roadName":"Sitaram Poddar Marg","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-09-27","endDate":"2027-01-29","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"slaughter-house-road-h-w-2025-11-01","sourceKey":"slaughter-house-road-h-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Slaughter House Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":450,"pqcPercentProgress":21.11,"pqcCompletedOn":null},"changes":[]},
{"id":"slip-road-from-midc-central-rd-to-jvlr-k-e-2024-11-14","sourceKey":"slip-road-from-midc-central-rd-to-jvlr-k-e-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Slip Road from MIDC Central Rd to JVLR","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-14","endDate":"2025-05-25","lengthM":422,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"smata-nagar-road-side-strip-kandivali-e-r-s-2026-10-01","sourceKey":"smata-nagar-road-side-strip-kandivali-e-r-s-2026-10-01","firstSeen":"2026-10-22","state":{"roadName":"Smata nagar Road Side Strip, Kandivali(E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"In Progress","startDate":"2026-10-01","endDate":"2027-01-30","lengthM":720,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"smt-amravati-sharda-prasad-singh-marg-ghatkopar-east-n-2026-01-01","sourceKey":"smt-amravati-sharda-prasad-singh-marg-ghatkopar-east-n-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"Smt Amravati Sharda Prasad Singh Marg, Ghatkopar (East)","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-31","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"smt-khadija-shaffi-tayabji-marg-no-2-d-2025-11-10","sourceKey":"smt-khadija-shaffi-tayabji-marg-no-2-d-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"Smt. Khadija Shaffi Tayabji Marg No. 2","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-10","endDate":"2026-05-17","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-16","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"smt-shobha-bhaskar-joshi-marg-h-w-2024-10-17","sourceKey":"smt-shobha-bhaskar-joshi-marg-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Smt. Shobha Bhaskar Joshi Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-05-31","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"solapur-street-b-2025-01-15","sourceKey":"solapur-street-b-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"Solapur Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-01-15","endDate":"2026-01-20","lengthM":305,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"solaris-road-l-2025-10-01","sourceKey":"solaris-road-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Solaris Road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-05-30","lengthM":245,"pqcPercentProgress":89.8,"pqcCompletedOn":null},"changes":[]},
{"id":"somnath-lane-h-w-x","sourceKey":"somnath-lane-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Somnath Lane","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sonapur-lane-bhandup-west-s-2023-03-15","sourceKey":"sonapur-lane-bhandup-west-s-2023-03-15","firstSeen":"2026-07-04","state":{"roadName":"Sonapur Lane, Bhandup (West)","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-03-15","endDate":"2024-02-15","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sonapur-lane-lbs-marg-to-mn-road-l-x","sourceKey":"sonapur-lane-lbs-marg-to-mn-road-l-x","firstSeen":"2026-07-04","state":{"roadName":"Sonapur Lane ( LBS marg to MN road)","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"On Hold","startDate":null,"endDate":"2027-05-14","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sonawala-cross-road-no-1-goregaon-e-p-s-2024-01-20","sourceKey":"sonawala-cross-road-no-1-goregaon-e-p-s-2024-01-20","firstSeen":"2026-07-04","state":{"roadName":"Sonawala Cross Road No.1, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-20","endDate":"2025-01-25","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"soniwadi-road-r-c-2024-10-01","sourceKey":"soniwadi-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Soniwadi road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":475,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sorabh-bharucha-road-a-x","sourceKey":"sorabh-bharucha-road-a-x","firstSeen":"2026-07-04","state":{"roadName":"Sorabh Bharucha Road","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-01-15","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"south-pond-road-k-w-2024-10-01","sourceKey":"south-pond-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"South Pond Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":108,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sports-complex-road-h-w-2026-01-10","sourceKey":"sports-complex-road-h-w-2026-01-10","firstSeen":"2026-07-04","state":{"roadName":"Sports Complex Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-01-10","endDate":"2026-05-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"srinagar-colony-road-goregaon-west-p-s-2024-10-10","sourceKey":"srinagar-colony-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Srinagar Colony Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-of-13th-road-khar-west-h-w-x","sourceKey":"ss-of-13th-road-khar-west-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"SS of 13th Road, Khar West","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":null,"lengthM":558,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"}]},
{"id":"ss-of-c-d-road-h-w-2026-03-28","sourceKey":"ss-of-c-d-road-h-w-2026-03-28","firstSeen":"2026-07-04","state":{"roadName":"SS of C.D road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-03-28","endDate":"2027-05-31","lengthM":950,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-of-d-r-varasakar-marg-bandra-stn-rd-h-w-x","sourceKey":"ss-of-d-r-varasakar-marg-bandra-stn-rd-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"SS of D.R. Varasakar Marg (Bandra Stn Rd)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-of-h-k-bhabha-road-h-w-x","sourceKey":"ss-of-h-k-bhabha-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"SS of H K Bhabha Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":570,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-of-l-k-mehta-road-h-w-2026-02-09","sourceKey":"ss-of-l-k-mehta-road-h-w-2026-02-09","firstSeen":"2026-07-04","state":{"roadName":"SS of L K Mehta Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2026-02-09","endDate":"2026-05-31","lengthM":520,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-of-p-d-hinduja-road-h-w-x","sourceKey":"ss-of-p-d-hinduja-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"SS of P.D. Hinduja Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-of-saraswati-road-h-w-0206-03-28","sourceKey":"ss-of-saraswati-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"SS of Saraswati Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":null,"endDate":"2026-12-31","lengthM":580,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-of-st-sabastian-road-h-w-x","sourceKey":"ss-of-st-sabastian-road-h-w-x","firstSeen":"2026-10-07","state":{"roadName":"SS of St Sabastian Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ss-r-k-patkar-water-field-road-h-w-x","sourceKey":"ss-r-k-patkar-water-field-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"SS R.K. Patkar (Water field Road)","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":null,"lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-alexious-road-h-w-2024-11-01","sourceKey":"st-alexious-road-h-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"St Alexious Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-30","lengthM":195,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-aloysius-high-school-to-beach-road-gorai-village-borivali-w-r-c-2024-10-01","sourceKey":"st-aloysius-high-school-to-beach-road-gorai-village-borivali-w-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"St. Aloysius High School to Beach Road, Gorai Village, Borivali (W)","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":341,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-andrews-road-extention-h-w-2023-11-04","sourceKey":"st-andrews-road-extention-h-w-2023-11-04","firstSeen":"2026-07-04","state":{"roadName":"St. Andrews Road Extention","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-04","endDate":"2024-02-28","lengthM":370,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-annes-church-road-h-w-2024-10-18","sourceKey":"st-annes-church-road-h-w-2024-10-18","firstSeen":"2026-07-04","state":{"roadName":"St Annes Church Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-18","endDate":"2025-04-30","lengthM":96,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-anthony-church-road-milind-nagar-junction-to-605-bus-stop-bhandup-west-s-2024-12-07","sourceKey":"st-anthony-church-road-milind-nagar-junction-to-605-bus-stop-bhandup-west-s-2024-12-07","firstSeen":"2026-07-04","state":{"roadName":"St Anthony Church Road, Milind nagar junction to 605 bus stop, Bhandup West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-07","endDate":"2026-05-31","lengthM":356,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"st-anthony-road-h-e-2023-12-01","sourceKey":"st-anthony-road-h-e-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"St Anthony Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2023-12-01","endDate":"2026-05-31","lengthM":1200,"pqcPercentProgress":97.92,"pqcCompletedOn":null},"changes":[]},
{"id":"st-atif-road-h-w-2024-10-18","sourceKey":"st-atif-road-h-w-2024-10-18","firstSeen":"2026-07-04","state":{"roadName":"St. Atif Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-18","endDate":"2026-03-09","lengthM":264,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-francies-avenue-h-w-2026-01-21","sourceKey":"st-francies-avenue-h-w-2026-01-21","firstSeen":"2026-07-04","state":{"roadName":"St. Francies Avenue","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-21","endDate":"2027-02-18","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-gabriel-road-g-n-2025-11-05","sourceKey":"st-gabriel-road-g-n-2025-11-05","firstSeen":"2026-07-04","state":{"roadName":"St. Gabriel Road","ward":"G/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-11-05","endDate":"2026-05-31","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-george-street-a-2024-12-04","sourceKey":"st-george-street-a-2024-12-04","firstSeen":"2026-07-04","state":{"roadName":"St.George Street","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-04","endDate":"2025-05-31","lengthM":237.5,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-john-road-extention-h-w-2023-11-01","sourceKey":"st-john-road-extention-h-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"St. John Road Extention","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-01","endDate":"2024-02-11","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-joseph-avenue-marg-h-w-2026-01-01","sourceKey":"st-joseph-avenue-marg-h-w-2026-01-01","firstSeen":"2026-07-04","state":{"roadName":"St. Joseph Avenue Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2026-01-01","endDate":"2026-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-louis-lane-k-w-x","sourceKey":"st-louis-lane-k-w-x","firstSeen":"2026-07-04","state":{"roadName":"St.Louis Lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-louis-road-k-w-2023-11-03","sourceKey":"st-louis-road-k-w-2023-11-03","firstSeen":"2026-07-04","state":{"roadName":"St. Louis Road (","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-03","endDate":"2024-11-01","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-marry-road-k-w-2024-10-01","sourceKey":"st-marry-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"St.Marry Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":258,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-martin-road-h-w-2023-11-14","sourceKey":"st-martin-road-h-w-2023-11-14","firstSeen":"2026-07-04","state":{"roadName":"St Martin road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-14","endDate":"2024-02-28","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-peter-road-h-w-2024-03-05","sourceKey":"st-peter-road-h-w-2024-03-05","firstSeen":"2026-07-04","state":{"roadName":"St Peter Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-03-05","endDate":"2024-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-roques-road-h-w-2024-11-01","sourceKey":"st-roques-road-h-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"St Roques Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-sebastan-cross-road-h-w-2024-10-17","sourceKey":"st-sebastan-cross-road-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"St. Sebastan Cross Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"st-sebastian-school-to-sahydri-ngar-m-e-2024-10-01","sourceKey":"st-sebastian-school-to-sahydri-ngar-m-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"St Sebastian School to Sahydri Ngar","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2024-10-01","endDate":"2026-12-31","lengthM":965,"pqcPercentProgress":62.69,"pqcCompletedOn":null},"changes":[]},
{"id":"st-xaviers-road-k-w-2024-10-01","sourceKey":"st-xaviers-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"St.Xaviers Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"star-hub-road-k-e-2024-11-02","sourceKey":"star-hub-road-k-e-2024-11-02","firstSeen":"2026-07-04","state":{"roadName":"Star Hub Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-02","endDate":"2025-06-05","lengthM":355,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"star-krida-mandal-m-w-x","sourceKey":"star-krida-mandal-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Star Krida mandal","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-20","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-20","before":{"roadName":"Star Krida mandal","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Not Started","startDate":null,"endDate":"2026-12-31","lengthM":170,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"strand-road-roadside-strip-footpath-a-2025-11-10","sourceKey":"strand-road-roadside-strip-footpath-a-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"Strand Road (roadside strip & footpath)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-11-10","endDate":"2026-05-31","lengthM":203,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"subhaash-khemkar-marg-g-n-2025-10-08","sourceKey":"subhaash-khemkar-marg-g-n-2025-10-08","firstSeen":"2026-07-04","state":{"roadName":"Subhaash Khemkar marg","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-08","endDate":"2026-05-31","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"subhash-cross-road-k-e-2025-10-01","sourceKey":"subhash-cross-road-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Subhash cross Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":620,"pqcPercentProgress":66.94,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-lane-kandivali-w-r-s-2024-10-01","sourceKey":"subhash-lane-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Subhash Lane , Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":445,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-mhatre-parallel-road-p-s-2026-02-16","sourceKey":"subhash-mhatre-parallel-road-p-s-2026-02-16","firstSeen":"2026-07-04","state":{"roadName":"Subhash Mhatre Parallel Road","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-02-16","endDate":"2027-05-31","lengthM":145,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-nagar-13-40-m-d-p-road-jogeshwari-k-e-2023-10-04","sourceKey":"subhash-nagar-13-40-m-d-p-road-jogeshwari-k-e-2023-10-04","firstSeen":"2026-07-04","state":{"roadName":"Subhash Nagar 13.40 m D.P.Road Jogeshwari","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-04","endDate":"2024-05-31","lengthM":118,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-nagar-road-from-n-g-acharya-marg-to-road-no-11-m-w-2025-10-10","sourceKey":"subhash-nagar-road-from-n-g-acharya-marg-to-road-no-11-m-w-2025-10-10","firstSeen":"2026-07-04","state":{"roadName":"Subhash Nagar Road from N. G. Acharya Marg to Road No. 11","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-10","endDate":"2027-05-27","lengthM":410,"pqcPercentProgress":92.68,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-nagar-road-ring-road-m-w-2024-11-14","sourceKey":"subhash-nagar-road-ring-road-m-w-2024-11-14","firstSeen":"2026-07-04","state":{"roadName":"Subhash Nagar Road / Ring Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-14","endDate":"2025-05-30","lengthM":304,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-road-bhandup-west-s-x","sourceKey":"subhash-road-bhandup-west-s-x","firstSeen":"2026-07-04","state":{"roadName":"Subhash road, Bhandup(West)","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":null,"endDate":null,"lengthM":270,"pqcPercentProgress":77.78,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-road-side-strip-k-e-2025-10-01","sourceKey":"subhash-road-side-strip-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Subhash Road Side Strip","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-11-15","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"subhash-udyog-road-l-2025-10-01","sourceKey":"subhash-udyog-road-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Subhash udyog road","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"succex-cross-lane-e-2024-11-08","sourceKey":"succex-cross-lane-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Succex Cross Lane","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-08","endDate":"2026-05-15","lengthM":273,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"succex-lane-no-2-e-2026-04-06","sourceKey":"succex-lane-no-2-e-2026-04-06","firstSeen":"2026-07-04","state":{"roadName":"Succex Lane no.2","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-04-06","endDate":"2026-10-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sufi-sayyed-kalam-road-k-w-2023-12-20","sourceKey":"sufi-sayyed-kalam-road-k-w-2023-12-20","firstSeen":"2026-07-04","state":{"roadName":"Sufi Sayyed Kalam Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-20","endDate":"2024-05-24","lengthM":278,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"suhasini-pawskar-road-from-crystal-building-to-narayan-tea-centre-road-dahisar-e-r-n-2023-11-23","sourceKey":"suhasini-pawskar-road-from-crystal-building-to-narayan-tea-centre-road-dahisar-e-r-n-2023-11-23","firstSeen":"2026-07-04","state":{"roadName":"Suhasini Pawskar Road from Crystal Building to Narayan Tea Centre Road, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-23","endDate":"2024-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sumantai-janardan-mhatre-road-f-n-x","sourceKey":"sumantai-janardan-mhatre-road-f-n-2026-10-15","firstSeen":"2026-07-04","state":{"roadName":"Sumantai Janardan Mhatre Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2026-10-15","endDate":"2027-05-31","lengthM":212,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"In Progress"},{"on":"2026-10-28","field":"startDate","from":null,"to":"2026-10-15"}]},
{"id":"sumer-nagar-road-cross-road-borivali-west-r-c-2023-04-16","sourceKey":"sumer-nagar-road-cross-road-borivali-west-r-c-2023-04-16","firstSeen":"2026-07-04","state":{"roadName":"Sumer Nagar Road & cross Road, Borivali(West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-04-16","endDate":"2025-05-31","lengthM":950,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sundar-baug-road-from-lbs-to-doshi-bldg-l-x","sourceKey":"sundar-baug-road-from-lbs-to-doshi-bldg-l-x","firstSeen":"2026-07-04","state":{"roadName":"Sundar baug road( from LBS to Doshi Bldg.)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sundar-baug-road-minarwa-to-balgopal-mitra-mandal-l-2024-12-27","sourceKey":"sundar-baug-road-minarwa-to-balgopal-mitra-mandal-l-2024-12-27","firstSeen":"2026-07-04","state":{"roadName":"Sundar baug road (Minarwa To Balgopal Mitra mandal)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2024-12-27","endDate":"2025-12-31","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-29","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"sundar-vihar-road-pratiksha-nagar-f-n-2026-10-13","sourceKey":"sundar-vihar-road-pratiksha-nagar-f-n-2026-10-13","firstSeen":"2026-07-04","state":{"roadName":"Sundar Vihar Road Pratiksha Nagar","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Completed","startDate":"2026-10-13","endDate":"2027-05-29","lengthM":1380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sunder-lane-p-n-2024-10-01","sourceKey":"sunder-lane-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sunder Lane","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sunder-nagar-cross-road-sundar-nagar-lane-to-marve-road-p-n-2024-10-01","sourceKey":"sunder-nagar-cross-road-sundar-nagar-lane-to-marve-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Sunder nagar cross road sundar nagar Lane to marve road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sunder-nagar-road-k-e-x","sourceKey":"sunder-nagar-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Sunder Nagar Road","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2026-12-31","lengthM":315,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sunder-nagar-road-no-01-h-e-2023-11-20","sourceKey":"sunder-nagar-road-no-01-h-e-2023-11-20","firstSeen":"2026-07-04","state":{"roadName":"Sunder Nagar Road no. 01","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-20","endDate":"2024-03-20","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sunder-nagar-road-no-02-h-e-2023-12-01","sourceKey":"sunder-nagar-road-no-02-h-e-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Sunder Nagar Road no. 02","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-01","endDate":"2025-12-15","lengthM":560,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sunder-nagar-road-no-3-h-e-2024-12-01","sourceKey":"sunder-nagar-road-no-3-h-e-2024-12-01","firstSeen":"2026-07-04","state":{"roadName":"Sunder Nagar Road No-3","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-12-01","endDate":"2026-03-26","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sunil-premanand-kambali-road-l-2023-03-25","sourceKey":"sunil-premanand-kambali-road-l-2023-03-25","firstSeen":"2026-07-04","state":{"roadName":"Sunil Premanand Kambali Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-03-25","endDate":"2025-04-19","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"surat-street-b-2024-11-04","sourceKey":"surat-street-b-2024-11-04","firstSeen":"2026-07-04","state":{"roadName":"Surat street","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-04","endDate":"2025-03-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"surya-nagar-road-vikroli-west-s-2024-12-14","sourceKey":"surya-nagar-road-vikroli-west-s-2024-12-14","firstSeen":"2026-07-04","state":{"roadName":"Surya Nagar Road, Vikroli West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-12-14","endDate":"2027-05-31","lengthM":400,"pqcPercentProgress":50,"pqcCompletedOn":"2027-01-21"},"changes":[]},
{"id":"sv-road-malad-w-p-n-2024-10-01","sourceKey":"sv-road-malad-w-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SV Road Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":2026,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"sv-road-to-mith-chowky-marve-road-malad-w-p-n-2024-10-01","sourceKey":"sv-road-to-mith-chowky-marve-road-malad-w-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SV Road to Mith Chowky Marve Road Malad W","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":2000,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-a-k-w-2024-10-01","sourceKey":"svp-mhada-layout-a-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout A","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-b-k-w-2024-10-01","sourceKey":"svp-mhada-layout-b-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout B","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":244,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-c-k-w-2024-10-01","sourceKey":"svp-mhada-layout-c-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout C","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":288,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-d-k-w-2024-10-01","sourceKey":"svp-mhada-layout-d-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout D","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-03-31","lengthM":236,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-e-k-w-2024-10-01","sourceKey":"svp-mhada-layout-e-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout E","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-25","lengthM":201,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-f-k-w-2024-10-01","sourceKey":"svp-mhada-layout-f-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout F","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-30","lengthM":405,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-i-k-w-2024-10-01","sourceKey":"svp-mhada-layout-i-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout I","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-02-23","lengthM":344,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-mhada-layout-ii-k-w-2024-10-01","sourceKey":"svp-mhada-layout-ii-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP MHADA Layout II","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-15","lengthM":191,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-road-kandivali-w-r-s-2024-10-01","sourceKey":"svp-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"SVP Road , Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2026-06-09","lengthM":365,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-road-mulund-east-t-2026-02-14","sourceKey":"svp-road-mulund-east-t-2026-02-14","firstSeen":"2026-07-04","state":{"roadName":"SVP Road Mulund(east)","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":null,"status":"In Progress","startDate":"2026-02-14","endDate":"2026-12-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"svp-road-side-strip-b-x","sourceKey":"svp-road-side-strip-b-x","firstSeen":"2026-07-04","state":{"roadName":"SVP Road ( Side Strip)","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":410,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"swadeshi-mill-road-from-jesang-society-to-bholenath-krida-mandal-l-2024-01-10","sourceKey":"swadeshi-mill-road-from-jesang-society-to-bholenath-krida-mandal-l-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"Swadeshi Mill road from Jesang society to Bholenath krida mandal","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-01-10","endDate":"2025-03-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"swadeshi-mill-road-from-police-station-to-pumping-station-l-2024-01-10","sourceKey":"swadeshi-mill-road-from-police-station-to-pumping-station-l-2024-01-10","firstSeen":"2026-07-04","state":{"roadName":"Swadeshi Mill road from Police station to Pumping station","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-01-10","endDate":"2025-03-31","lengthM":85,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"swami-gyanjivandas-road-f-n-2025-10-15","sourceKey":"swami-gyanjivandas-road-f-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Swami Gyanjivandas Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-15","endDate":"2027-05-31","lengthM":270,"pqcPercentProgress":37.04,"pqcCompletedOn":null},"changes":[]},
{"id":"swapnlok-apartment-road-malad-e-p-n-2024-10-01","sourceKey":"swapnlok-apartment-road-malad-e-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Swapnlok Apartment road Malad (E)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-15","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"t-b-kadam-road-e-2024-11-16","sourceKey":"t-b-kadam-road-e-2024-11-16","firstSeen":"2026-07-04","state":{"roadName":"T B Kadam Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-11-16","endDate":"2026-11-30","lengthM":700,"pqcPercentProgress":85.71,"pqcCompletedOn":null},"changes":[]},
{"id":"t-j-road-f-s-2024-11-18","sourceKey":"t-j-road-f-s-2024-11-18","firstSeen":"2026-07-04","state":{"roadName":"T.J.Road","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-11-18","endDate":"2026-05-31","lengthM":1160,"pqcPercentProgress":77.67,"pqcCompletedOn":"2026-05-31"},"changes":[]},
{"id":"tadwadi-road-c-2024-12-22","sourceKey":"tadwadi-road-c-2024-12-22","firstSeen":"2026-07-04","state":{"roadName":"Tadwadi Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-12-22","endDate":"2025-12-05","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"takshila-marg-h-e-2024-10-01","sourceKey":"takshila-marg-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Takshila Marg","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-28","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"talmiki-road-h-w-2025-01-01","sourceKey":"talmiki-road-h-w-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Talmiki Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-01-01","endDate":"2026-05-28","lengthM":680,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tanaji-malusare-road-k-w-2024-10-01","sourceKey":"tanaji-malusare-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Tanaji Malusare Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-29","lengthM":525,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tanaji-nagar-road-malad-east-p-n-2023-10-02","sourceKey":"tanaji-nagar-road-malad-east-p-n-2023-10-02","firstSeen":"2026-07-04","state":{"roadName":"Tanaji nagar road, Malad ( East )","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-10-02","endDate":"2026-05-31","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tandel-street-north-b-x","sourceKey":"tandel-street-north-b-x","firstSeen":"2026-07-04","state":{"roadName":"Tandel Street (North)","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":124,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tank-garden-road-e-x","sourceKey":"tank-garden-road-e-x","firstSeen":"2026-07-04","state":{"roadName":"Tank Garden Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-10","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tank-lane-p-n-2024-10-14","sourceKey":"tank-lane-p-n-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Tank Lane","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-14","endDate":"2025-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tank-lane-santacruz-west-h-w-2024-11-01","sourceKey":"tank-lane-santacruz-west-h-w-2024-11-01","firstSeen":"2026-07-04","state":{"roadName":"Tank lane (Santacruz West)","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-01","endDate":"2025-05-31","lengthM":187,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tank-pakhadi-marg-e-x","sourceKey":"tank-pakhadi-marg-e-x","firstSeen":"2026-07-04","state":{"roadName":"Tank Pakhadi Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-10","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Tank Pakhadi Marg","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"tantanpura-street-b-x","sourceKey":"tantanpura-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Tantanpura Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":298,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tarun-bharat-road-k-e-2024-10-02","sourceKey":"tarun-bharat-road-k-e-2024-10-02","firstSeen":"2026-07-04","state":{"roadName":"Tarun Bharat Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-02","endDate":"2025-03-13","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tata-colony-magestic-road-t-2024-12-21","sourceKey":"tata-colony-magestic-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Tata Colony Magestic Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2026-01-22","lengthM":55,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tata-colony-swapnil-society-road-t-2024-12-21","sourceKey":"tata-colony-swapnil-society-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Tata Colony Swapnil Society Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2025-03-23","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tata-compound-road-i-k-w-2024-10-01","sourceKey":"tata-compound-road-i-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Tata compound road-I","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":350,"pqcPercentProgress":85.71,"pqcCompletedOn":null},"changes":[]},
{"id":"tata-power-road-r-c-x","sourceKey":"tata-power-road-r-c-x","firstSeen":"2026-07-04","state":{"roadName":"Tata Power Road","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tatya-gharpure-lane-d-x","sourceKey":"tatya-gharpure-lane-d-x","firstSeen":"2026-07-04","state":{"roadName":"Tatya Gharpure Lane","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-04-30","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tawa-lane-b-x","sourceKey":"tawa-lane-b-x","firstSeen":"2026-07-04","state":{"roadName":"Tawa Lane","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":73,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"teacher-s-colony-road-swargdwar-road-h-e-2026-10-01","sourceKey":"teacher-s-colony-road-swargdwar-road-h-e-2026-10-01","firstSeen":"2026-10-20","state":{"roadName":"Teacher's Colony Road (Swargdwar Road)","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2026-10-01","endDate":"2027-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tejpal-road-d-2024-10-01","sourceKey":"tejpal-road-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Tejpal Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-11-23","lengthM":380,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tejpal-scheme-road-no-2-k-e-2023-11-14","sourceKey":"tejpal-scheme-road-no-2-k-e-2023-11-14","firstSeen":"2026-07-04","state":{"roadName":"Tejpal scheme Road No 2","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-14","endDate":"2024-03-09","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tejpal-scheme-road-no-3-k-e-2023-11-13","sourceKey":"tejpal-scheme-road-no-3-k-e-2023-11-13","firstSeen":"2026-07-04","state":{"roadName":"Tejpal Scheme Road No. 3","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-11-13","endDate":"2024-04-29","lengthM":250,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"telang-road-f-n-2025-02-01","sourceKey":"telang-road-f-n-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"Telang Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2025-02-01","endDate":"2026-05-31","lengthM":501,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"telang-road-from-bhandarkar-road-to-bhau-daji-road-f-n-x","sourceKey":"telang-road-from-bhandarkar-road-to-bhau-daji-road-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Telang Road (from Bhandarkar Road to Bhau Daji Road)","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"telly-gully-cross-road-k-e-2025-12-01","sourceKey":"telly-gully-cross-road-k-e-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Telly Gully Cross Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-01","endDate":"2026-05-31","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tembhipada-road-gurunanak-school-to-vaibhav-chowk-bhandup-west-s-2025-10-01","sourceKey":"tembhipada-road-gurunanak-school-to-vaibhav-chowk-bhandup-west-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Tembhipada Road, Gurunanak School to vaibhav chowk , Bhandup West","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2027-12-31","lengthM":1031,"pqcPercentProgress":7.76,"pqcCompletedOn":null},"changes":[]},
{"id":"temkar-street-e-x","sourceKey":"temkar-street-e-x","firstSeen":"2026-07-04","state":{"roadName":"Temkar Street","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-10","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"thakkar-bappa-road-from-sahkar-nagar-road-no-4-to-s-g-barve-marg-m-w-x","sourceKey":"thakkar-bappa-road-from-sahkar-nagar-road-no-4-to-s-g-barve-marg-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Thakkar Bappa Road from Sahkar Nagar Road No. 4 to S. G. Barve Marg","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":750,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"thakur-raghunath-singh-road-from-khan-abdul-majid-marg-to-kazi-road-l-2025-10-01","sourceKey":"thakur-raghunath-singh-road-from-khan-abdul-majid-marg-to-kazi-road-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Thakur Raghunath Singh road( from khan Abdul Majid marg to Kazi road)*","ward":"L","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":300,"pqcPercentProgress":53.33,"pqcCompletedOn":null},"changes":[]},
{"id":"thakur-stadium-road-kandivali-e-r-s-2023-11-01","sourceKey":"thakur-stadium-road-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Thakur Stadium Road, Kandivali (E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-02-22","lengthM":475,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"thana-street-b-2025-12-01","sourceKey":"thana-street-b-2025-12-01","firstSeen":"2026-07-04","state":{"roadName":"Thana Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-12-01","endDate":"2027-03-31","lengthM":295,"pqcPercentProgress":38.31,"pqcCompletedOn":null},"changes":[]},
{"id":"thanawala-lane-k-e-2023-10-04","sourceKey":"thanawala-lane-k-e-2023-10-04","firstSeen":"2026-07-04","state":{"roadName":"Thanawala lane","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-10-04","endDate":"2024-05-18","lengthM":360,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tikamchand-toshniwal-road-goregaon-west-p-s-2024-10-15","sourceKey":"tikamchand-toshniwal-road-goregaon-west-p-s-2024-10-15","firstSeen":"2026-07-04","state":{"roadName":"Tikamchand Toshniwal Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-15","endDate":"2025-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tilak-bridge-approach-road-f-n-x","sourceKey":"tilak-bridge-approach-road-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Tilak Bridge Approach Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tilak-mandir-road-vile-parle-k-e-2025-10-01","sourceKey":"tilak-mandir-road-vile-parle-k-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Tilak Mandir Road Vile Parle","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-19","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tilak-road-bhandup-west-s-2023-12-15","sourceKey":"tilak-road-bhandup-west-s-2023-12-15","firstSeen":"2026-07-04","state":{"roadName":"Tilak Road, Bhandup (West)","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-15","endDate":"2026-02-28","lengthM":375,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tilak-vasahat-road-no-1-f-n-x","sourceKey":"tilak-vasahat-road-no-1-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Tilak Vasahat Road no.1","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tilak-vasahat-road-no-2-f-n-x","sourceKey":"tilak-vasahat-road-no-2-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Tilak Vasahat Road no 2","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":125,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tilak-vidyalaya-road-k-e-2025-12-15","sourceKey":"tilak-vidyalaya-road-k-e-2025-12-15","firstSeen":"2026-07-04","state":{"roadName":"Tilak Vidyalaya Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-15","endDate":"2026-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tolaram-tower-road-m-w-2025-02-14","sourceKey":"tolaram-tower-road-m-w-2025-02-14","firstSeen":"2026-07-04","state":{"roadName":"Tolaram Tower Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-02-14","endDate":"2026-04-05","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"toyoto-showroom-road-side-strip-malad-w-p-n-2025-11-01","sourceKey":"toyoto-showroom-road-side-strip-malad-w-p-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Toyoto Showroom Road Side strip Malad (W)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tps-1st-rd-r-m-bhattad-road-side-strip-r-c-2023-10-26","sourceKey":"tps-1st-rd-r-m-bhattad-road-side-strip-r-c-2023-10-26","firstSeen":"2026-07-04","state":{"roadName":"TPS 1st Rd (R.M. Bhattad Road) Side Strip","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-26","endDate":"2026-05-31","lengthM":1210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tps-33th-road-sbi-gulmohar-colony-r-c-2025-02-01","sourceKey":"tps-33th-road-sbi-gulmohar-colony-r-c-2025-02-01","firstSeen":"2026-07-04","state":{"roadName":"TPS 33th road, SBI Gulmohar colony","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-02-01","endDate":"2025-05-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tps-35th-road-kids-house-montessori-preschool-daycare-r-c-2025-10-01","sourceKey":"tps-35th-road-kids-house-montessori-preschool-daycare-r-c-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"TPS 35th Road, Kids House Montessori Preschool & Daycare","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-10-01","endDate":"2026-03-27","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tps-road-including-road-upto-janu-s-apartment-r-c-2024-10-01","sourceKey":"tps-road-including-road-upto-janu-s-apartment-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"TPS road including road upto Janu's apartment","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"transcon-developer-to-monginis-factory-c-t-s-no-650-3-k-w-2023-12-10","sourceKey":"transcon-developer-to-monginis-factory-c-t-s-no-650-3-k-w-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"Transcon Developer to monginis Factory (C.T.S no 650/3 )","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-10","endDate":"2025-05-01","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tribhuvan-road-d-x","sourceKey":"tribhuvan-road-d-x","firstSeen":"2026-07-04","state":{"roadName":"Tribhuvan Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"trikoni-maidan-road-goregaon-west-p-s-2024-10-01","sourceKey":"trikoni-maidan-road-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Trikoni Maidan Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":134,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"trimbak-parshuram-marg-d-2026-03-25","sourceKey":"trimbak-parshuram-marg-d-2026-03-25","firstSeen":"2026-07-04","state":{"roadName":"Trimbak Parshuram Marg","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2026-03-25","endDate":"2026-05-31","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"trimurti-narayan-society-road-t-2025-10-01","sourceKey":"trimurti-narayan-society-road-t-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Trimurti narayan society Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2025-10-01","endDate":"2026-03-22","lengthM":80,"pqcPercentProgress":50,"pqcCompletedOn":null},"changes":[]},
{"id":"trimurti-road-p-n-2024-10-01","sourceKey":"trimurti-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Trimurti Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"trimurti-road-side-strips-t-2023-11-16","sourceKey":"trimurti-road-side-strips-t-2023-11-16","firstSeen":"2026-07-04","state":{"roadName":"Trimurti Road (Side Strips)","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-16","endDate":"2025-02-01","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"triveni-nagar-road-p-n-2023-11-11","sourceKey":"triveni-nagar-road-p-n-2023-11-11","firstSeen":"2026-07-04","state":{"roadName":"Triveni nagar road","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-11","endDate":"2024-05-01","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"trolly-line-road-bhandup-post-office-to-culvert-bhandup-east-s-2024-11-21","sourceKey":"trolly-line-road-bhandup-post-office-to-culvert-bhandup-east-s-2024-11-21","firstSeen":"2026-07-04","state":{"roadName":"Trolly Line Road, Bhandup Post office to Culvert, Bhandup East","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-21","endDate":"2026-05-31","lengthM":310,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tryambak-parshuram-road-e-2026-03-19","sourceKey":"tryambak-parshuram-road-e-2026-03-19","firstSeen":"2026-07-04","state":{"roadName":"Tryambak Parshuram Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-03-19","endDate":"2026-05-31","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tullak-marg-a-2024-11-08","sourceKey":"tullak-marg-a-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Tullak Marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-08","endDate":"2025-04-30","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"turel-pakhadi-road-malad-w-p-n-2024-10-14","sourceKey":"turel-pakhadi-road-malad-w-p-n-2024-10-14","firstSeen":"2026-07-04","state":{"roadName":"Turel Pakhadi Road, Malad(W)","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-14","endDate":"2026-01-15","lengthM":400,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"turner-road-junction-h-w-2024-01-01","sourceKey":"turner-road-junction-h-w-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Turner Road junction","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-31","lengthM":30,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"tv-chidambaran-marg-f-n-x","sourceKey":"tv-chidambaran-marg-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"TV Chidambaran marg","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":292,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"umarkhadi-x-lane-b-x","sourceKey":"umarkhadi-x-lane-b-x","firstSeen":"2026-07-04","state":{"roadName":"Umarkhadi X Lane","ward":"B","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":115,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"umeda-aashram-marg-r-c-2024-10-01","sourceKey":"umeda-aashram-marg-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Umeda Aashram Marg","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":203,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"undria-cross-lane-e-x","sourceKey":"undria-cross-lane-e-x","firstSeen":"2026-07-04","state":{"roadName":"Undria Cross Lane","ward":"E","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-02-28","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"union-park-1st-road-h-w-x","sourceKey":"union-park-1st-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Union Park 1st Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Not Started","startDate":null,"endDate":"2026-04-15","lengthM":65,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"union-park-3rd-road-h-w-2024-10-17","sourceKey":"union-park-3rd-road-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Union Park 3rd Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2026-03-31","lengthM":137,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"union-park-4th-road-h-w-2024-10-17","sourceKey":"union-park-4th-road-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"Union Park 4th Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-05-31","lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"union-park-internal-road-from-trilok-kapoor-marg-to-mahadev-mandir-m-w-x","sourceKey":"union-park-internal-road-from-trilok-kapoor-marg-to-mahadev-mandir-m-w-x","firstSeen":"2026-07-04","state":{"roadName":"Union Park Internal Road From Trilok Kapoor Marg to Mahadev Mandir","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Not Started","startDate":null,"endDate":"2027-05-30","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"uswala-lane-road-goregaon-e-p-s-2024-01-01","sourceKey":"uswala-lane-road-goregaon-e-p-s-2024-01-01","firstSeen":"2026-07-04","state":{"roadName":"Uswala Lane Road, Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2024-01-01","endDate":"2024-05-25","lengthM":338,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"utkarsha-nagar-road-s-2024-11-07","sourceKey":"utkarsha-nagar-road-s-2024-11-07","firstSeen":"2026-07-04","state":{"roadName":"Utkarsha Nagar Road","ward":"S","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-11-07","endDate":"2027-05-31","lengthM":408,"pqcPercentProgress":69.85,"pqcCompletedOn":null},"changes":[]},
{"id":"v-b-worlikar-marg-g-s-2026-01-10","sourceKey":"v-b-worlikar-marg-g-s-2026-01-10","firstSeen":"2026-07-04","state":{"roadName":"V. B. Worlikar Marg","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-01-10","endDate":"2027-03-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-j-rath-marg-g-n-2025-10-08","sourceKey":"v-j-rath-marg-g-n-2025-10-08","firstSeen":"2026-07-04","state":{"roadName":"V. J. Rath marg","ward":"G/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-08","endDate":"2026-05-31","lengthM":130,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-l-pednekar-rd-no-9-f-s-2024-11-21","sourceKey":"v-l-pednekar-rd-no-9-f-s-2024-11-21","firstSeen":"2026-07-04","state":{"roadName":"V.L. Pednekar Rd (.No.9)","ward":"F/S","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-21","endDate":"2026-03-31","lengthM":313,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-m-bhargav-cross-lane-h-w-2025-11-01","sourceKey":"v-m-bhargav-cross-lane-h-w-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"V M Bhargav Cross lane","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-11-01","endDate":"2026-04-10","lengthM":89,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-m-bhargav-road-h-w-2023-04-27","sourceKey":"v-m-bhargav-road-h-w-2023-04-27","firstSeen":"2026-07-04","state":{"roadName":"V.M. Bhargav Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-04-27","endDate":"2025-02-28","lengthM":350,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-m-shah-marg-k-e-2024-10-23","sourceKey":"v-m-shah-marg-k-e-2024-10-23","firstSeen":"2026-07-04","state":{"roadName":"V M Shah Marg","ward":"K/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-23","endDate":"2025-06-02","lengthM":483,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-n-naik-rd-forgett-street-d-x","sourceKey":"v-n-naik-rd-forgett-street-d-x","firstSeen":"2026-07-04","state":{"roadName":"V. N. Naik Rd. (Forgett Street)","ward":"D","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":800,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-10","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-10","before":{"roadName":"V. N. Naik Rd. (Forgett Street)","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":800,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"v-n-purav-marg-m-e-2024-11-18","sourceKey":"v-n-purav-marg-m-e-2024-11-18","firstSeen":"2026-07-04","state":{"roadName":"V.N.Purav Marg","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2024-11-18","endDate":"2027-04-30","lengthM":1729,"pqcPercentProgress":60.15,"pqcCompletedOn":null},"changes":[]},
{"id":"v-n-purav-marg-to-govandi-police-station-road-m-e-2025-10-01","sourceKey":"v-n-purav-marg-to-govandi-police-station-road-m-e-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"V N Purav Marg to Govandi Police Station Road","ward":"M/E","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-01","endDate":"2027-02-28","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-n-road-from-hutatma-chowk-to-horniman-circle-a-x","sourceKey":"v-n-road-from-hutatma-chowk-to-horniman-circle-a-x","firstSeen":"2026-07-04","state":{"roadName":"V. N. Road (from Hutatma Chowk to Horniman Circle)","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-13","before":{"roadName":"V. N. Road (from Hutatma Chowk to Horniman Circle)","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":256,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"v-n-road-from-kilachand-chowk-to-hutatma-chowk-a-x","sourceKey":"v-n-road-from-kilachand-chowk-to-hutatma-chowk-a-x","firstSeen":"2026-07-04","state":{"roadName":"V. N. Road (from Kilachand Chowk to Hutatma Chowk)","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":720,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-13","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-13","before":{"roadName":"V. N. Road (from Kilachand Chowk to Hutatma Chowk)","ward":"A","contractor":"M/s NCC Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":720,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"v-p-road-c-ward-c-2025-11-01","sourceKey":"v-p-road-c-ward-c-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"V P Road (C ward)","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-22","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"v-p-road-d-2025-01-15","sourceKey":"v-p-road-d-2025-01-15","firstSeen":"2026-07-04","state":{"roadName":"V P Road","ward":"D","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2025-01-15","endDate":"2026-05-31","lengthM":770,"pqcPercentProgress":29.87,"pqcCompletedOn":null},"changes":[]},
{"id":"v-p-road-k-w-2023-11-01","sourceKey":"v-p-road-k-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"V.P.Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":700,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-p-road-s-v-patel-marg-h-w-2024-12-04","sourceKey":"v-p-road-s-v-patel-marg-h-w-2024-12-04","firstSeen":"2026-07-04","state":{"roadName":"V P Road / S V Patel Marg","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-12-04","endDate":"2027-03-15","lengthM":540,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-p-road-s-v-road-to-gilbert-road-k-w-2024-10-01","sourceKey":"v-p-road-s-v-road-to-gilbert-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"V P Road-S V Road to Gilbert road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":496,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-v-chandan-street-b-x","sourceKey":"v-v-chandan-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"V V Chandan Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-v-pednekar-road-dahisar-e-r-n-2025-10-05","sourceKey":"v-v-pednekar-road-dahisar-e-r-n-2025-10-05","firstSeen":"2026-07-04","state":{"roadName":"V.V.Pednekar Road, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2025-10-05","endDate":"2025-05-31","lengthM":295,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"v-v-rao-marg-a-2025-10-11","sourceKey":"v-v-rao-marg-a-2025-10-11","firstSeen":"2026-07-04","state":{"roadName":"V. V. Rao marg","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-10-11","endDate":"2026-05-30","lengthM":240,"pqcPercentProgress":75,"pqcCompletedOn":null},"changes":[]},
{"id":"v-v-rao-marg-cross-lane-a-2024-11-20","sourceKey":"v-v-rao-marg-cross-lane-a-2024-11-20","firstSeen":"2026-07-04","state":{"roadName":"V.V. Rao Marg Cross Lane","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-11-20","endDate":"2025-02-28","lengthM":47,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vachha-gandhi-road-d-2025-10-03","sourceKey":"vachha-gandhi-road-d-2025-10-03","firstSeen":"2026-07-04","state":{"roadName":"Vachha Gandhi Road","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-10-03","endDate":"2026-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vadaripada-near-rani-sati-school-malad-east-p-n-2023-11-05","sourceKey":"vadaripada-near-rani-sati-school-malad-east-p-n-2023-11-05","firstSeen":"2026-07-04","state":{"roadName":"Vadaripada, near Rani sati school , Malad (East)","ward":"P/N","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-05","endDate":"2024-05-01","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vaishali-nagar-road-junction-dahisar-e-r-n-2023-11-01","sourceKey":"vaishali-nagar-road-junction-dahisar-e-r-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Vaishali Nagar Road Junction, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2024-04-30","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vaishali-sadan-to-vrindavan-road-r-n-2024-10-10","sourceKey":"vaishali-sadan-to-vrindavan-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Vaishali Sadan to Vrindavan Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-03-31","lengthM":147,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vaishnodevi-marg-from-v-n-purav-marg-to-36-60-m-wide-d-p-road-m-w-2025-10-08","sourceKey":"vaishnodevi-marg-from-v-n-purav-marg-to-36-60-m-wide-d-p-road-m-w-2025-10-08","firstSeen":"2026-07-04","state":{"roadName":"Vaishnodevi Marg from V.N. Purav Marg to 36.60 m wide D.P. Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2025-10-08","endDate":"2026-12-31","lengthM":500,"pqcPercentProgress":52,"pqcCompletedOn":null},"changes":[]},
{"id":"vakola-masjid-lane-h-e-2024-11-08","sourceKey":"vakola-masjid-lane-h-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Vakola Masjid lane","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-08","endDate":"2025-05-30","lengthM":90,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vakola-pipeline-road-extension-h-e-2025-12-03","sourceKey":"vakola-pipeline-road-extension-h-e-2025-12-03","firstSeen":"2026-07-04","state":{"roadName":"Vakola Pipeline Road Extension","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2025-12-03","endDate":"2026-01-22","lengthM":275,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vakola-pipeline-road-h-e-2024-10-01","sourceKey":"vakola-pipeline-road-h-e-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vakola Pipeline Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2024-10-01","endDate":"2026-05-27","lengthM":1160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vaman-ashram-road-r-c-2024-10-01","sourceKey":"vaman-ashram-road-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vaman Ashram road","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":136,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vasant-khanolkar-marg-slip-road-of-ganpatrao-kadam-marg-bridge-g-s-2025-12-15","sourceKey":"vasant-khanolkar-marg-slip-road-of-ganpatrao-kadam-marg-bridge-g-s-2025-12-15","firstSeen":"2026-07-04","state":{"roadName":"Vasant Khanolkar marg (Slip road of Ganpatrao Kadam Marg Bridge)","ward":"G/S","contractor":"M/s NCC Ltd","workCode":null,"status":"Completed","startDate":"2025-12-15","endDate":"2026-03-31","lengthM":190,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vasantrao-naik-road-both-side-stripes-baliram-surve-chowk-to-ganpati-mandir-l-2023-10-10","sourceKey":"vasantrao-naik-road-both-side-stripes-baliram-surve-chowk-to-ganpati-mandir-l-2023-10-10","firstSeen":"2026-07-04","state":{"roadName":"Vasantrao Naik Road Both Side Stripes (Baliram Surve Chowk to Ganpati Mandir)","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-10","endDate":"2025-04-19","lengthM":290,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"veer-makrand-ghanekar-marg-k-e-2023-12-18","sourceKey":"veer-makrand-ghanekar-marg-k-e-2023-12-18","firstSeen":"2026-07-04","state":{"roadName":"Veer Makrand Ghanekar Marg","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Completed","startDate":"2023-12-18","endDate":"2025-03-27","lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"veer-ratna-prabhakar-balkrishna-sule-road-f-n-2025-10-15","sourceKey":"veer-ratna-prabhakar-balkrishna-sule-road-f-n-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Veer Ratna Prabhakar Balkrishna Sule Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"In Progress","startDate":"2025-10-15","endDate":"2027-03-31","lengthM":355,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"veer-santaji-lane-g-s-2024-12-22","sourceKey":"veer-santaji-lane-g-s-2024-12-22","firstSeen":"2026-07-04","state":{"roadName":"Veer Santaji Lane","ward":"G/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-12-22","endDate":"2025-05-31","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"veer-savarkar-road-t-2023-12-04","sourceKey":"veer-savarkar-road-t-2023-12-04","firstSeen":"2026-07-04","state":{"roadName":"Veer Savarkar Road","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"In Progress","startDate":"2023-12-04","endDate":"2026-05-31","lengthM":510,"pqcPercentProgress":65.69,"pqcCompletedOn":null},"changes":[]},
{"id":"veera-desai-road-k-w-2023-11-01","sourceKey":"veera-desai-road-k-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Veera Desai Road","ward":"K/W","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":500,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"veermata-jijabai-technical-institute-road-f-n-x","sourceKey":"veermata-jijabai-technical-institute-road-f-n-x","firstSeen":"2026-07-04","state":{"roadName":"Veermata Jijabai Technical Institute Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2027-05-31","lengthM":117,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-28","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-28","before":{"roadName":"Veermata Jijabai Technical Institute Road","ward":"F/N","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-05-31","lengthM":117,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"vibgyor-school-road-goregaon-west-p-s-2024-10-10","sourceKey":"vibgyor-school-road-goregaon-west-p-s-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Vibgyor School Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-10","endDate":"2026-02-28","lengthM":545,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"videocon-tower-road-kandivali-e-r-s-2023-11-01","sourceKey":"videocon-tower-road-kandivali-e-r-s-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Videocon tower road, Kandivali(E)","ward":"R/S","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-02-22","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidhan-bhavan-road-a-x","sourceKey":"vidhan-bhavan-road-a-x","firstSeen":"2026-10-13","state":{"roadName":"Vidhan Bhavan Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":251,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidya-bhavan-off-lane-n-2024-11-09","sourceKey":"vidya-bhavan-off-lane-n-2024-11-09","firstSeen":"2026-07-04","state":{"roadName":"Vidya Bhavan off Lane","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-09","endDate":"2025-11-30","lengthM":120,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-adjoining-juhu-natraj-chs-k-w-2024-10-01","sourceKey":"vidyanidhi-cross-road-adjoining-juhu-natraj-chs-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-Adjoining Juhu Natraj CHS","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-01-15","lengthM":35,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-air-india-building-to-jay-maharastra-vastu-vikas-k-w-2025-01-09","sourceKey":"vidyanidhi-cross-road-air-india-building-to-jay-maharastra-vastu-vikas-k-w-2025-01-09","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-Air india building to Jay Maharastra vastu vikas","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-01-09","endDate":"2025-05-31","lengthM":60,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-building-no-4-to-gurukrupa-vyom-chs-k-w-2024-12-23","sourceKey":"vidyanidhi-cross-road-building-no-4-to-gurukrupa-vyom-chs-k-w-2024-12-23","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-Building no.4 to Gurukrupa vyom CHS","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-12-23","endDate":"2025-05-30","lengthM":66,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-jay-maharastra-chs-to-charted-building-k-w-2024-11-15","sourceKey":"vidyanidhi-cross-road-jay-maharastra-chs-to-charted-building-k-w-2024-11-15","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-Jay Maharastra CHS to Charted building","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-11-15","endDate":"2025-03-08","lengthM":75,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-juhu-trishool-to-jyoti-sadan-k-w-2024-12-15","sourceKey":"vidyanidhi-cross-road-juhu-trishool-to-jyoti-sadan-k-w-2024-12-15","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-Juhu Trishool to Jyoti Sadan","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-12-15","endDate":"2025-04-20","lengthM":64,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-k-w-2024-10-01","sourceKey":"vidyanidhi-cross-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":320,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-kabra-prathna-to-al-sana-chs-k-w-2024-10-01","sourceKey":"vidyanidhi-cross-road-kabra-prathna-to-al-sana-chs-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-kabra prathna to Al Sana CHS","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-lovely-home-to-silver-chs-k-w-2024-10-01","sourceKey":"vidyanidhi-cross-road-lovely-home-to-silver-chs-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-lovely home to silver CHS","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-om-coastal-chs-to-mehata-house-k-w-2024-10-01","sourceKey":"vidyanidhi-cross-road-om-coastal-chs-to-mehata-house-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi cross road-om coastal CHS to Mehata house","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":80,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyanidhi-cross-road-swami-mitra-chs-to-juhu-jivan-k-w-2025-11-10","sourceKey":"vidyanidhi-cross-road-swami-mitra-chs-to-juhu-jivan-k-w-2025-11-10","firstSeen":"2026-07-04","state":{"roadName":"Vidyanidhi Cross Road-Swami Mitra CHS to Juhu Jivan","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-11-10","endDate":"2026-04-20","lengthM":63,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vidyapith-road-t-2025-11-13","sourceKey":"vidyapith-road-t-2025-11-13","firstSeen":"2026-07-04","state":{"roadName":"Vidyapith Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-11-13","endDate":"2026-03-27","lengthM":110,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vijay-nagar-road-h-e-2025-11-01","sourceKey":"vijay-nagar-road-h-e-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Vijay Nagar Road","ward":"H/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"In Progress","startDate":"2025-11-01","endDate":"2026-05-15","lengthM":300,"pqcPercentProgress":36.67,"pqcCompletedOn":null},"changes":[]},
{"id":"vijaykumar-walimbe-road-f-s-x","sourceKey":"vijaykumar-walimbe-road-f-s-x","firstSeen":"2026-07-04","state":{"roadName":"Vijaykumar Walimbe Road","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vijaywadi-road-c-x","sourceKey":"vijaywadi-road-c-x","firstSeen":"2026-07-04","state":{"roadName":"Vijaywadi Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Not Started","startDate":null,"endDate":"2027-03-31","lengthM":150,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"village-road-bhandup-west-s-x","sourceKey":"village-road-bhandup-west-s-x","firstSeen":"2026-07-04","state":{"roadName":"Village Road, Bhandup West","ward":"S","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":550,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-22","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"vinaykumar-amrutlal-oza-road-f-n-2025-11-01","sourceKey":"vinaykumar-amrutlal-oza-road-f-n-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Vinaykumar Amrutlal Oza Road","ward":"F/N","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"In Progress","startDate":"2025-11-01","endDate":"2027-05-31","lengthM":306,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vinod-sanghi-road-goregaon-west-p-s-2024-10-01","sourceKey":"vinod-sanghi-road-goregaon-west-p-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vinod Sanghi Road, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-04-20","lengthM":450,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vinu-mankad-road-d-road-a-x","sourceKey":"vinu-mankad-road-d-road-a-x","firstSeen":"2026-07-04","state":{"roadName":"Vinu Mankad Road(D Road)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":260,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vishnu-ganesh-pingle-road-e-2026-05-15","sourceKey":"vishnu-ganesh-pingle-road-e-2026-05-15","firstSeen":"2026-07-04","state":{"roadName":"Vishnu Ganesh Pingle Road","ward":"E","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2026-05-15","endDate":"2026-05-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vishnu-nagar-road-m-e-2024-11-12","sourceKey":"vishnu-nagar-road-m-w-2024-11-12","firstSeen":"2026-07-04","state":{"roadName":"Vishnu Nagar road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-11-12","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-08-15","field":"ward","from":"M/E","to":"M/W"}]},
{"id":"vishnu-shivam-x-road-r-s-2025-12-02","sourceKey":"vishnu-shivam-x-road-r-s-2025-12-02","firstSeen":"2026-07-04","state":{"roadName":"Vishnu Shivam 'X' Road","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":null,"status":"Completed","startDate":"2025-12-02","endDate":"2027-05-31","lengthM":244,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vishwabharti-upshray-lane-k-w-2025-04-05","sourceKey":"vishwabharti-upshray-lane-k-w-2025-04-05","firstSeen":"2026-07-04","state":{"roadName":"Vishwabharti Upshray Lane","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2025-04-05","endDate":"2026-03-31","lengthM":601,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vishwakarma-road-link-road-to-husaini-chowk-goregaon-w-p-s-2023-05-01","sourceKey":"vishwakarma-road-link-road-to-husaini-chowk-goregaon-w-p-s-2023-05-01","firstSeen":"2026-07-04","state":{"roadName":"Vishwakarma Road (Link road to husaini chowk), Goregaon (W)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-05-01","endDate":"2024-05-24","lengthM":600,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vitbhatti-road-goregaon-east-p-s-2025-10-01","sourceKey":"vitbhatti-road-goregaon-east-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vitbhatti Road, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"In Progress","startDate":"2025-10-01","endDate":"2027-05-31","lengthM":250,"pqcPercentProgress":68,"pqcCompletedOn":null},"changes":[]},
{"id":"vitthal-chavan-road-f-s-2024-11-18","sourceKey":"vitthal-chavan-road-f-s-2024-11-18","firstSeen":"2026-07-04","state":{"roadName":"Vitthal Chavan Road","ward":"F/S","contractor":"M/s NCC Ltd","workCode":"C-322","status":"In Progress","startDate":"2024-11-18","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":64,"pqcCompletedOn":"2025-12-31"},"changes":[]},
{"id":"vitthalwadi-road-c-2025-11-28","sourceKey":"vitthalwadi-road-c-2025-11-28","firstSeen":"2026-07-04","state":{"roadName":"Vitthalwadi Road","ward":"C","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-28","endDate":"2027-04-15","lengthM":315,"pqcPercentProgress":63.49,"pqcCompletedOn":null},"changes":[]},
{"id":"vivek-kambali-road-r-n-2024-10-10","sourceKey":"vivek-kambali-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Vivek Kambali Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2026-02-18","lengthM":270,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vivek-singh-lane-d-2024-10-01","sourceKey":"vivek-singh-lane-d-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Vivek Singh Lane","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":300,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vps-road-no-06-n-2023-11-01","sourceKey":"vps-road-no-06-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"VPS Road no.06","ward":"N","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2026-05-31","lengthM":423,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"vps-road-no-17-veer-savarkar-marg-n-2026-01-15","sourceKey":"vps-road-no-17-veer-savarkar-marg-n-2026-01-15","firstSeen":"2026-07-04","state":{"roadName":"VPS Road No.17 (Veer Savarkar Marg)","ward":"N","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"In Progress","startDate":"2026-01-15","endDate":"2027-05-31","lengthM":350,"pqcPercentProgress":28.57,"pqcCompletedOn":null},"changes":[]},
{"id":"wadarwada-road-k-e-x","sourceKey":"wadarwada-road-k-e-x","firstSeen":"2026-07-04","state":{"roadName":"Wadarwada Road","ward":"K/E","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Deleted","startDate":null,"endDate":"2026-05-14","lengthM":0,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"wadia-estate-road-l-x","sourceKey":"wadia-estate-road-l-x","firstSeen":"2026-07-04","state":{"roadName":"Wadia Estate Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":null,"endDate":null,"lengthM":210,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"wadia-path-d-2025-11-14","sourceKey":"wadia-path-d-2025-11-14","firstSeen":"2026-07-04","state":{"roadName":"Wadia Path","ward":"D","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"In Progress","startDate":"2025-11-14","endDate":"2026-05-31","lengthM":230,"pqcPercentProgress":74.35,"pqcCompletedOn":null},"changes":[]},
{"id":"walbhatt-road-remaining-portion-goregaon-e-p-s-2023-12-01","sourceKey":"walbhatt-road-remaining-portion-goregaon-e-p-s-2023-12-01","firstSeen":"2026-07-04","state":{"roadName":"Walbhatt Road (remaining portion), Goregaon (E)","ward":"P/S","contractor":"M/s Megha Engineering and Infrastructures Ltd","workCode":"W-414","status":"Completed","startDate":"2023-12-01","endDate":"2024-05-24","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"walton-road-a-x","sourceKey":"walton-road-a-x","firstSeen":"2026-07-04","state":{"roadName":"Walton Road","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2025-05-31","lengthM":140,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"waman-bhoir-marg-r-n-2024-10-01","sourceKey":"waman-bhoir-marg-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Waman Bhoir Marg","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":165,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"waman-wadi-internal-road-from-hemu-kalani-road-to-waman-wadi-road-m-w-2025-03-01","sourceKey":"waman-wadi-internal-road-from-hemu-kalani-road-to-waman-wadi-road-m-w-2025-03-01","firstSeen":"2026-07-04","state":{"roadName":"Waman Wadi Internal Road From Hemu Kalani Road to Waman Wadi Road","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-03-01","endDate":"2025-05-31","lengthM":78,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"waman-wadi-road-from-v-n-purav-marg-chhagan-meetha-petrol-pump-to-waman-wadi-m-w-2025-10-15","sourceKey":"waman-wadi-road-from-v-n-purav-marg-chhagan-meetha-petrol-pump-to-waman-wadi-m-w-2025-10-15","firstSeen":"2026-07-04","state":{"roadName":"Waman Wadi Road from V. N. Purav Marg (Chhagan Meetha Petrol Pump) to Waman wadi","ward":"M/W","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2025-10-15","endDate":"2026-05-20","lengthM":158,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"wamanrao-sawant-road-r-n-2024-10-10","sourceKey":"wamanrao-sawant-road-r-n-2024-10-10","firstSeen":"2026-07-04","state":{"roadName":"Wamanrao Sawant Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-10","endDate":"2025-05-31","lengthM":348,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"weigh-bridge-road-m-e-2023-10-21","sourceKey":"weigh-bridge-road-m-e-2023-10-21","firstSeen":"2026-07-04","state":{"roadName":"Weigh Bridge Road","ward":"M/E","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-10-21","endDate":"2024-02-01","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"west-avenue-road-h-w-x","sourceKey":"west-avenue-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"West Avenue Road","ward":"H/W","contractor":"M/s NCC Ltd","workCode":"W-421","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":340,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"windsor-lane-h-e-2024-11-08","sourceKey":"windsor-lane-h-e-2024-11-08","firstSeen":"2026-07-04","state":{"roadName":"Windsor Lane","ward":"H/E","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-11-08","endDate":"2025-05-31","lengthM":175,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"windy-hall-lane-a-2024-11-19","sourceKey":"windy-hall-lane-a-2024-11-19","firstSeen":"2026-07-04","state":{"roadName":"Windy Hall Lane","ward":"A","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Completed","startDate":"2024-11-19","endDate":"2025-05-31","lengthM":135,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"wire-gully-road-l-2025-10-01","sourceKey":"wire-gully-road-l-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Wire Gully Road","ward":"L","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2025-10-01","endDate":"2026-12-31","lengthM":540,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-09-29","field":"status","from":"In Progress","to":"Completed"}]},
{"id":"women-s-graduates-marg-roadside-strip-footpath-a-2025-11-01","sourceKey":"women-s-graduates-marg-roadside-strip-footpath-a-2025-11-01","firstSeen":"2026-07-04","state":{"roadName":"Women’s Graduates Marg (roadside strip & footpath)","ward":"A","contractor":"M/s GHV (India) Pvt Ltd","workCode":"C-320","status":"Completed","startDate":"2025-11-01","endDate":"2026-05-31","lengthM":200,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"y-r-tawade-internal-road-r-n-2024-10-01","sourceKey":"y-r-tawade-internal-road-r-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Y.R.Tawade Internal Road","ward":"R/N","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-06-09","lengthM":168,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"y-r-tawade-road-from-shri-upendra-society-to-shri-hari-om-pan-bhandar-dahisar-e-r-n-2023-11-01","sourceKey":"y-r-tawade-road-from-shri-upendra-society-to-shri-hari-om-pan-bhandar-dahisar-e-r-n-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Y.R.Tawade Road from Shri Upendra Society to Shri Hari Om pan bhandar, Dahisar(E)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yamuna-nagar-road-1-k-w-2024-10-01","sourceKey":"yamuna-nagar-road-1-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Yamuna Nagar Road-1","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":356,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yamuna-nagar-road-2-k-w-2024-10-01","sourceKey":"yamuna-nagar-road-2-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Yamuna Nagar Road-2","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":231,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yashodham-school-road-goregaon-east-p-s-2025-10-01","sourceKey":"yashodham-school-road-goregaon-east-p-s-2025-10-01","firstSeen":"2026-07-04","state":{"roadName":"Yashodham School Road, Goregaon East","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2025-10-01","endDate":"2026-05-31","lengthM":330,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yashwant-nagar-road-m-w-2023-11-01","sourceKey":"yashwant-nagar-road-m-w-2023-11-01","firstSeen":"2026-07-04","state":{"roadName":"Yashwant Nagar Road","ward":"M/W","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-11-01","endDate":"2025-05-15","lengthM":155,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yashwantrao-tawade-road-dahisar-w-r-n-2023-10-24","sourceKey":"yashwantrao-tawade-road-dahisar-w-r-n-2023-10-24","firstSeen":"2026-07-04","state":{"roadName":"Yashwantrao Tawade Road, Dahisar(W)","ward":"R/N","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-10-24","endDate":"2025-05-31","lengthM":760,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yavteshwar-road-k-w-2024-10-01","sourceKey":"yavteshwar-road-k-w-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Yavteshwar Road","ward":"K/W","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":null,"status":"Completed","startDate":"2024-10-01","endDate":"2026-05-31","lengthM":608,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"ymca-road-h-w-2024-10-17","sourceKey":"ymca-road-h-w-2024-10-17","firstSeen":"2026-07-04","state":{"roadName":"YMCA Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":"W-445","status":"Completed","startDate":"2024-10-17","endDate":"2025-05-31","lengthM":180,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yogi-hill-road-t-2024-12-21","sourceKey":"yogi-hill-road-t-2024-12-21","firstSeen":"2026-07-04","state":{"roadName":"Yogi Hill Road","ward":"T","contractor":"M/s Gawar Construction Ltd","workCode":"E-322","status":"Completed","startDate":"2024-12-21","endDate":"2026-05-25","lengthM":160,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yogi-nagar-to-jain-derrasar-road-borivali-west-r-c-2023-11-25","sourceKey":"yogi-nagar-to-jain-derrasar-road-borivali-west-r-c-2023-11-25","firstSeen":"2026-07-04","state":{"roadName":"Yogi Nagar to Jain Derrasar Road, Borivali (West)","ward":"R/C","contractor":"M/s Dineshchandra Ramchandra Agrawal Infracon Pvt Ltd","workCode":"W-415","status":"Completed","startDate":"2023-11-25","endDate":"2024-03-31","lengthM":100,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yogi-swaroop-chs-road-yogi-nagar-r-c-2024-10-01","sourceKey":"yogi-swaroop-chs-road-yogi-nagar-r-c-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Yogi Swaroop CHS Road, Yogi Nagar","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":115,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"yogishree-chs-road-yogi-nagar-r-c-2025-01-01","sourceKey":"yogishree-chs-road-yogi-nagar-r-c-2025-01-01","firstSeen":"2026-07-04","state":{"roadName":"Yogishree CHS Road, Yogi Nagar","ward":"R/C","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2025-01-01","endDate":"2025-05-31","lengthM":297,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"zakeria-masjid-street-b-x","sourceKey":"zakeria-masjid-street-b-x","firstSeen":"2026-07-04","state":{"roadName":"Zakeria Masjid Street","ward":"B","contractor":"M/s NCC Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-05-31","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[{"on":"2026-10-14","field":"status","from":"Not Started","to":"Deleted"}],"deletions":[{"on":"2026-10-14","before":{"roadName":"Zakeria Masjid Street","ward":"B","contractor":"M/s NCC Ltd","workCode":"C-322","status":"Not Started","startDate":null,"endDate":"2026-05-31","lengthM":390,"pqcPercentProgress":null,"pqcCompletedOn":null}}]},
{"id":"zakeria-road-malad-w-turel-pakhadi-extension-road-p-n-2024-10-01","sourceKey":"zakeria-road-malad-w-turel-pakhadi-extension-road-p-n-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Zakeria Road, Malad (W)Turel pakhadi Extension Road","ward":"P/N","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2024-10-01","endDate":"2026-03-12","lengthM":650,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"zaver-road-side-strips-t-2023-12-10","sourceKey":"zaver-road-side-strips-t-2023-12-10","firstSeen":"2026-07-04","state":{"roadName":"Zaver Road (Side Strips)","ward":"T","contractor":"M/s Eagle Infra India Pvt Ltd","workCode":"E-289","status":"Completed","startDate":"2023-12-10","endDate":"2024-05-01","lengthM":610,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"zebra-gully-goregaon-west-p-s-2026-03-15","sourceKey":"zebra-gully-goregaon-west-p-s-2026-03-15","firstSeen":"2026-07-04","state":{"roadName":"Zebra Gully, Goregaon West","ward":"P/S","contractor":"M/s RPS Infraprojects Pvt Ltd","workCode":"W-446","status":"Completed","startDate":"2026-03-15","endDate":"2026-05-31","lengthM":185,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"zigzag-road-h-w-x","sourceKey":"zigzag-road-h-w-x","firstSeen":"2026-07-04","state":{"roadName":"Zigzag Road","ward":"H/W","contractor":"M/s AIC Infrastructures Pvt Ltd","workCode":null,"status":"Deleted","startDate":null,"endDate":"2026-12-31","lengthM":225,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]},
{"id":"zveri-bagh-road-kandivali-w-r-s-2024-10-01","sourceKey":"zveri-bagh-road-kandivali-w-r-s-2024-10-01","firstSeen":"2026-07-04","state":{"roadName":"Zveri Bagh Road, Kandivali (W)","ward":"R/S","contractor":"M/s BSCPL Infrastructure Ltd","workCode":"W-447","status":"Completed","startDate":"2024-10-01","endDate":"2025-05-31","lengthM":95,"pqcPercentProgress":null,"pqcCompletedOn":null},"changes":[]}
]}